SPECIFICATION_INDEX.docx

DOCX document 16 KB Posted

Attached to
Construct 799 ABS Comm Storage Facility
Solicitation number
FA4861-13-R-A012
Issued by

About this file

Spec list

View the file

Other files

File Type Posted
image2013-09-30-195340.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
RFI_Responses.pdf PDF
Solicitation_Amendment.pdf PDF
LKTC121068_SOW.pdf PDF
Appendix_4__-_UFC_3-600-01_Fire_Protection_Engineering_for_Facilities.pdf PDF
Appendix_6_-_UFC_4-021-01_Design_and_O M_Mass_Notification_Systems.pdf PDF
Appendix_20_-_UM_33_CJE_Conduit_Placement_Standards.pdf PDF
Appendix_14_-_Specifications_and_Drawings_for_Underground_Electric_Distribution.pdf PDF
Appendix_22_-_Power_Trench_Sand_and_Backfill_Requirements.pdf PDF
Appendix_10_-_Env_Permit-ATP_Guidance_May_2012.pdf PDF
Appendix_1_-_Nellis-Creech_ID2_Handbook_2011.pdf PDF
REQUEST_TO_USE_RADIOACTIVE_DEVICE.docx DOCX document
Appendix_12_-_LKTC121068_Utility_Maps.pdf PDF
Appendix_3_-_UFC_3-580-01_Telecommunications_Building_Cabling_Sys_Planning_ _Design.pdf PDF
Appendix_7_-_NC_Addendum_Section_27_10_00_Building_Telecommunications_Cabling_System.pdf PDF
Appendix_11_-_LKTC121068_Location_Plan_ _Floor_Plan_ Read-Only .pdf PDF
Bid_Schedule_for_Comm_Storage.pdf PDF
Wage_Determination_NV130004_05032013__NV4.pdf PDF
Appendix_8_-_Nellis-Creech_Base_Fire_Protection_Standards.pdf PDF
Appendix_13_-_Connection_Charge_Agreement.docx DOCX document
Appendix_24_-_UM3-14_Standards.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.doc DOC document
Appendix_16_-_3-Phase_Pad_and_Vault_VEA_Standards.PDF PDF
Appendix_17_-_UM33_200_AMP_CJE_Conduit_Placement_Creech_Standards.pdf PDF
Appendix_15_-_UM33_VEA_Standards.pdf PDF
Appendix_23_-_3-Phase_Delta-_Wye_Pad_Mounted_Transformer_(Loop_feed).pdf PDF
Appendix_5_-_UFC_4-010-01_DoD_Minimum_Antiterrorism_Standards_for_Buildings.pdf PDF
Solicitation.doc DOC document
Appendix_2_-_UFC_3-550-01_Exterior_Electrical_Power_Distribution.pdf PDF
Appendix_19_-UM48-2_25_OHM_Resistance_or_Less_Standards.pdf PDF
Appendix_-_21_UM48-2_Multi-Grounds.pdf PDF
Appendix_9_-_Metering_Requirements.pdf PDF
LKTC121068_SOW.pdf PDF
Appendix_18_-_UM33_200_AMP_CJE_Conduit_Placement_Creech_Standards.pdf PDF
LKTC_12-1068_Images.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION INDEX

DIVISION 1
GENERAL REQUIREMENTS
DATED
PAGES
Cover Sheet
1 July 2013
1
Specification Index
1 July 2013
1
01 11 00
Summary of Work
1 July 2013
51
01 33 00
Submittal Procedures with AF Form 66, Schedule of Material Submittals
27 June 2013
6
APPENDICES
DATED
PAGES
1
Nellis-Creech Installation Development and Design (ID2) Handbook
August 2011
146
2
UFC 3-550-01 Exterior Electrical Power Distribution
1 July 2012
54
3
UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design
22 June 2007
45
4
UFC 3-600-01 Fire Protection Engineering for Facilities
1 March 2013
158
5
UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
9 Feb 2012
103
6
UFC 4-021-01 Design and O&M: Mass Notification Systems
January 2010
94
7
Nellis-Creech AFB Addendum Section 27 10 00 Building Telecommunications Cabling System
June 2012
26
8
Nellis-Creech Base Fire Protection Standards
26 June 2013
7
9
Utility Meter Requirements
12 July 2012
1
10
Environmental Permits/Authority to Proceed Guidance
7 June 2013
2
11
Building Location, Utilities, Floor Plan
Undated
8
12
Utility Map - Water, Sewer, Electrical
2011
1
13
Connection Charge Agreement
17 June 2013
2
14
Specifications and Drawings for Underground Electric Distribution
June 2000
91
15
UM33 VEA Standards
Undated
1
16
3-Phase Pad and Vault VEA Standards
20 June 2013
1
17
UM3-14 CJE Conduit Placement Standards
21 June 2013
1
18
UM33 200 AMP CJE Conduit Placement Creech Standards
21 June 2013
1
19
UM48-2 25 OHM Resistance or Less Standards
21 June 2013
1
20
UM 33 CJE Conduit Placement Standards
20 June 2013
1
21
UM48-2 Multi-Grounds
21 June 2013
1
22
Power Trench Sand and Backfill Requirements
30 April 2013
2
23
3-Phase Delta- Wye Pad Mounted Transformer (Loop feed)
28 June 2013
1
24
UM3-14 Standards
21 June 2013
1