SPECIFICATION INDEX
| DIVISION 1 |
| GENERAL REQUIREMENTS |
| DATED |
| PAGES |
| Cover Sheet |
| 1 July 2013 |
| 1 |
| Specification Index |
| 1 July 2013 |
| 1 |
| 01 11 00 |
| Summary of Work |
| 1 July 2013 |
| 51 |
| 01 33 00 |
| Submittal Procedures with AF Form 66, Schedule of Material Submittals |
| 27 June 2013 |
| 6 |
| APPENDICES |
| DATED |
| PAGES |
| 1 |
| Nellis-Creech Installation Development and Design (ID2) Handbook |
| August 2011 |
| 146 |
| 2 |
| UFC 3-550-01 Exterior Electrical Power Distribution |
| 1 July 2012 |
| 54 |
| 3 |
| UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design |
| 22 June 2007 |
| 45 |
| 4 |
| UFC 3-600-01 Fire Protection Engineering for Facilities |
| 1 March 2013 |
| 158 |
| 5 |
| UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings |
| 9 Feb 2012 |
| 103 |
| 6 |
| UFC 4-021-01 Design and O&M: Mass Notification Systems |
| January 2010 |
| 94 |
| 7 |
| Nellis-Creech AFB Addendum Section 27 10 00 Building Telecommunications Cabling System |
| June 2012 |
| 26 |
| 8 |
| Nellis-Creech Base Fire Protection Standards |
| 26 June 2013 |
| 7 |
| 9 |
| Utility Meter Requirements |
| 12 July 2012 |
| 1 |
| 10 |
| Environmental Permits/Authority to Proceed Guidance |
| 7 June 2013 |
| 2 |
| 11 |
| Building Location, Utilities, Floor Plan |
| Undated |
| 8 |
| 12 |
| Utility Map - Water, Sewer, Electrical |
| 2011 |
| 1 |
| 13 |
| Connection Charge Agreement |
| 17 June 2013 |
| 2 |
| 14 |
| Specifications and Drawings for Underground Electric Distribution |
| June 2000 |
| 91 |
| 15 |
| UM33 VEA Standards |
| Undated |
| 1 |
| 16 |
| 3-Phase Pad and Vault VEA Standards |
| 20 June 2013 |
| 1 |
| 17 |
| UM3-14 CJE Conduit Placement Standards |
| 21 June 2013 |
| 1 |
| 18 |
| UM33 200 AMP CJE Conduit Placement Creech Standards |
| 21 June 2013 |
| 1 |
| 19 |
| UM48-2 25 OHM Resistance or Less Standards |
| 21 June 2013 |
| 1 |
| 20 |
| UM 33 CJE Conduit Placement Standards |
| 20 June 2013 |
| 1 |
| 21 |
| UM48-2 Multi-Grounds |
| 21 June 2013 |
| 1 |
| 22 |
| Power Trench Sand and Backfill Requirements |
| 30 April 2013 |
| 2 |
| 23 |
| 3-Phase Delta- Wye Pad Mounted Transformer (Loop feed) |
| 28 June 2013 |
| 1 |
| 24 |
| UM3-14 Standards |
| 21 June 2013 |
| 1 |