Appendix_13_-_Connection_Charge_Agreement.docx

DOCX document 20 KB Posted

Attached to
Construct 799 ABS Comm Storage Facility
Solicitation number
FA4861-13-R-A012
Issued by

View the file

Other files

File Type Posted
image2013-09-30-195340.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
RFI_Responses.pdf PDF
Solicitation_Amendment.pdf PDF
LKTC121068_SOW.pdf PDF
Appendix_4__-_UFC_3-600-01_Fire_Protection_Engineering_for_Facilities.pdf PDF
Appendix_6_-_UFC_4-021-01_Design_and_O M_Mass_Notification_Systems.pdf PDF
Appendix_20_-_UM_33_CJE_Conduit_Placement_Standards.pdf PDF
Appendix_14_-_Specifications_and_Drawings_for_Underground_Electric_Distribution.pdf PDF
Appendix_22_-_Power_Trench_Sand_and_Backfill_Requirements.pdf PDF
Appendix_10_-_Env_Permit-ATP_Guidance_May_2012.pdf PDF
Appendix_1_-_Nellis-Creech_ID2_Handbook_2011.pdf PDF
REQUEST_TO_USE_RADIOACTIVE_DEVICE.docx DOCX document
Appendix_12_-_LKTC121068_Utility_Maps.pdf PDF
Appendix_3_-_UFC_3-580-01_Telecommunications_Building_Cabling_Sys_Planning_ _Design.pdf PDF
Appendix_7_-_NC_Addendum_Section_27_10_00_Building_Telecommunications_Cabling_System.pdf PDF
Appendix_11_-_LKTC121068_Location_Plan_ _Floor_Plan_ Read-Only .pdf PDF
Bid_Schedule_for_Comm_Storage.pdf PDF
Wage_Determination_NV130004_05032013__NV4.pdf PDF
Appendix_8_-_Nellis-Creech_Base_Fire_Protection_Standards.pdf PDF
Appendix_24_-_UM3-14_Standards.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.doc DOC document
SPECIFICATION_INDEX.docx DOCX document
Appendix_16_-_3-Phase_Pad_and_Vault_VEA_Standards.PDF PDF
Appendix_17_-_UM33_200_AMP_CJE_Conduit_Placement_Creech_Standards.pdf PDF
Appendix_15_-_UM33_VEA_Standards.pdf PDF
Appendix_23_-_3-Phase_Delta-_Wye_Pad_Mounted_Transformer_(Loop_feed).pdf PDF
Appendix_5_-_UFC_4-010-01_DoD_Minimum_Antiterrorism_Standards_for_Buildings.pdf PDF
Solicitation.doc DOC document
Appendix_2_-_UFC_3-550-01_Exterior_Electrical_Power_Distribution.pdf PDF
Appendix_19_-UM48-2_25_OHM_Resistance_or_Less_Standards.pdf PDF
Appendix_-_21_UM48-2_Multi-Grounds.pdf PDF
Appendix_9_-_Metering_Requirements.pdf PDF
LKTC121068_SOW.pdf PDF
Appendix_18_-_UM33_200_AMP_CJE_Conduit_Placement_Creech_Standards.pdf PDF
LKTC_12-1068_Images.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 13

CONNECTION CHARGE AGREEMENT

THIS CONNECTION CHARGE AGREEMENT between _____________ (Contractor) and Valley Electric Association, Inc. (VEA) (Utility Owner) is entered into as of this ____ day of _____________, 20___.
WHEREAS, Contractor and the United States Government (Government) entered into Contract No. ________________ for construction of ________________ (the Project) located at ___________ Creech Air Force Base and/or Southern Ranges of Nevada Test and Training Range (collectively the “Construction Contract”);
WHEREAS, in accordance with the Department of Defense utilities privatization (UP) program, Utility Owner entered into a utility services contract under Contract No. SPE600-12-C-8270 (the UP Contract) with the Government to assume ownership, operations and maintenance of the electrical utility systems at the installation, as well as to furnish all necessary labor, management, supervision, permits, equipment, supplies, materials, transportation, and any other incidental services required for the complete ownership, operation, maintenance, repair, upgrade, and improvement of these utility systems in accordance with all terms, conditions, and special contract requirements, specifications, attachments, and drawings contained in the UP Contract or incorporated by reference therein;
NOW, THEREFORE, in consideration of the mutual covenants contained herein as well as other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the Parties hereto agree to the following terms and conditions of this Connection Charge Agreement:

[Insert Statement of Work for connecting facilities.] [Insert Schedule provisions and penalties for connecting facilities] [Insert Pricing and Payment provisions] [Insert any other special provisions specific to the relationship between the construction contractor and the UP contractor, e.g., disputes, risk allocation, liability, etc.] Any disputes between the Contractor and the Utility Owner shall be resolved by and between the parties to this Agreement and shall not be cognizable under the Disputes provisions of the Construction Contract or the UP Contract.

The parties acknowledge that installation of connecting facilities pursuant to a connection charge falls within the utility services provisions of Federal Acquisition Regulation (FAR) Part 41 and thus, is not a construction sub-contract. Therefore, the terms and conditions of the UP Contract shall govern the relationship between the Utility Owner and the Government, including the Utility Owner’s responsibility for compliance with applicable statutes and regulations.

Notices: All notices shall be delivered or sent to the respective parties at the respective addresses set forth below or to such different addresses as the respective parties may from time to time designate by notice properly given hereunder.

If to Utility Owner:

If to Contractor:

IN WITNESS WHEREOF, this Connection Charge Agreement is signed, sealed and delivered as of as of this ____ day of _____________, 20_______.

[Utility Owner]

By:_______________________________
Name: _______________________________
Title: _______________________________
[Contractor]
By:_______________________________
Name: _______________________________
Title: ____________________________

Valley Electric Association, Inc.

Chris Tomchuk, P.E.

800 E. Highway 372 Pahrump, NV 89048 Tel: 775-513-9625; 775-727-2183 Email: ctomchuck@vea.coop

17 June 2013