Appendix_12_-_LKTC121068_Utility_Maps.pdf

PDF 180 KB Posted

Attached to
Construct 799 ABS Comm Storage Facility
Solicitation number
FA4861-13-R-A012
Issued by

View the file

Other files

File Type Posted
image2013-09-30-195340.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
RFI_Responses.pdf PDF
Solicitation_Amendment.pdf PDF
LKTC121068_SOW.pdf PDF
Appendix_4__-_UFC_3-600-01_Fire_Protection_Engineering_for_Facilities.pdf PDF
Appendix_6_-_UFC_4-021-01_Design_and_O M_Mass_Notification_Systems.pdf PDF
Appendix_20_-_UM_33_CJE_Conduit_Placement_Standards.pdf PDF
Appendix_14_-_Specifications_and_Drawings_for_Underground_Electric_Distribution.pdf PDF
Appendix_22_-_Power_Trench_Sand_and_Backfill_Requirements.pdf PDF
Appendix_10_-_Env_Permit-ATP_Guidance_May_2012.pdf PDF
Appendix_1_-_Nellis-Creech_ID2_Handbook_2011.pdf PDF
REQUEST_TO_USE_RADIOACTIVE_DEVICE.docx DOCX document
Appendix_3_-_UFC_3-580-01_Telecommunications_Building_Cabling_Sys_Planning_ _Design.pdf PDF
Appendix_7_-_NC_Addendum_Section_27_10_00_Building_Telecommunications_Cabling_System.pdf PDF
Appendix_11_-_LKTC121068_Location_Plan_ _Floor_Plan_ Read-Only .pdf PDF
Bid_Schedule_for_Comm_Storage.pdf PDF
Wage_Determination_NV130004_05032013__NV4.pdf PDF
Appendix_8_-_Nellis-Creech_Base_Fire_Protection_Standards.pdf PDF
Appendix_13_-_Connection_Charge_Agreement.docx DOCX document
Appendix_24_-_UM3-14_Standards.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.doc DOC document
SPECIFICATION_INDEX.docx DOCX document
Appendix_16_-_3-Phase_Pad_and_Vault_VEA_Standards.PDF PDF
Appendix_17_-_UM33_200_AMP_CJE_Conduit_Placement_Creech_Standards.pdf PDF
Appendix_15_-_UM33_VEA_Standards.pdf PDF
Appendix_23_-_3-Phase_Delta-_Wye_Pad_Mounted_Transformer_(Loop_feed).pdf PDF
Appendix_5_-_UFC_4-010-01_DoD_Minimum_Antiterrorism_Standards_for_Buildings.pdf PDF
Solicitation.doc DOC document
Appendix_2_-_UFC_3-550-01_Exterior_Electrical_Power_Distribution.pdf PDF
Appendix_19_-UM48-2_25_OHM_Resistance_or_Less_Standards.pdf PDF
Appendix_-_21_UM48-2_Multi-Grounds.pdf PDF
Appendix_9_-_Metering_Requirements.pdf PDF
LKTC121068_SOW.pdf PDF
Appendix_18_-_UM33_200_AMP_CJE_Conduit_Placement_Creech_Standards.pdf PDF
LKTC_12-1068_Images.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL SYSTEM

799TH ABS/SCX

Communication Storage facility

KEY NOTE:

1. Underground High Voltage line shown under the proposed location.

2. Transformer T69 will be connected to

T76 when the new Recreation Center is installed.

3. No High Voltage electrical connection currently available.

4 R d ti Di t li4. Recommendation‐ Disconnect line from SW‐080 >> T69, and attach line from SW‐080 >>new loop fed transformer. Feed T69 from new transformer.

Existing 150 KVA transformer f3‐Transformer Loop Connection

DISTANCE FROM UTILITIES

Communication Storage facility

KEY NOTE:

1. Existing Facility (B69) is 44 feet from the existing Water line.

2. Existing Facility (B69) is 54 feet from the existing Sewer Line.

Current Sewer Asbuilts for this area

Communication Storage facility

Bldg 92 E i ti F ilitExisting Facility ro po se d

Si te

Pr se d e

Bldg 69 Existing

Pr op os Si te

Existing Facility

Communications Connection