APPENDIX 9
Nellis AFB & Creech AFB Utility Meter Requirements
Install advanced electric, gas, and water meters in project.
Electric Meter: “Veris Industries” advanced electric meter with display or approved equal.
Gas Meter: “Elster American Standard” meter with pulse output or approved equal.
Water Meter: "McCrometer” water meter or approved equal with pulse output and minimum pickup of 5 gallons per minute or less.
Contractor shall verify exact equipment and coordinate connection details with Energy Management Control System (EMCS) personnel at Nellis AFB (99 CES personnel in Bldg 812). Meters shall connect to project’s Johnson Controls based EMCS. Contractor shall verify the information outputted from meters is properly routed to base‐wide EMCS central connection point in Bldg 812.