FA485526Q0072 - Questions and answers.pdf
PDF 75 KB Posted
- Attached to
- Exhaust Troubleshooting
- Solicitation number
- FA485526Q0072
About this file
This is a Questions and Answers document for a federal contract opportunity related to Building Automation System (BAS) troubleshooting and repair at Building 4607. The document addresses 12 clarification questions submitted by potential offerors regarding an exhaust system control project.
Key technical details include: the exhaust system contains 2 controllers and pieces of terminal equipment; control drawings and sequence of operations documentation are available for contractor review; the current Andover Continuum software version requires verification and the contractor will need all front-end access and credentials; there is a known communications failure that prompted the request; the communications bus topology and BAUD rate are currently unknown; and BAS drawings, network architecture, point lists, and sequence-of-operations documentation have been provided. The contractor's primary responsibility is to troubleshoot and correct the exhaust system operational issues and demonstrate to CE HVAC personnel that the exhaust troubleshooting has been resolved and the system is operational. No New Mexico electrical contractor licenses, journeyman, low-voltage, or other trade licenses are required. A site visit will be available before final pricing is submitted to support accurate firm-fixed-price quotations. Normal work hours are constrained to 0700-1600 Monday through Friday. The contractor will be responsible for loop checkout, system acceptance, graphics acceptance, logic acceptance, and instrument-calibration acceptance as referenced in the Performance Work Statement section 1.2(7).
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. How many controllers and pieces of terminal equipment are included in the exhaust system? 2
2. Are current control drawings, controller lists, point lists, and the existing sequence of operations available? Drawing attached
3. What version of Andover Continuum is currently installed, and will Enersys receive the required front-end access and credentials? Will need computer checked for operation
4. Is there a known communications failure, affected area, or specific operational issue that initiated this request? Yes
5. What is the approximate length and topology of the communications bus? Unknown BAUD rate
6. Will a site visit be available before final pricing is submitted? Yes
7. Does this requirement require the contractor or onsite personnel to hold any New Mexico electrical contractor, journeyman, low-voltage, or other trade license? No
8. Can the Government provide an approximate controller/device/point count and any available BAS drawings, network architecture, point lists, and existing sequence-of-operations documentation for Building 4607? Sequence of operation documents
9. Is the contractor expected to provide any proprietary Andover Continuum software, licenses, interfaces, or service tools, or will all required front-end access be provided through the Government’s remote software engineer? Contractor will need all front-end
10. Please clarify the contractor’s responsibility for loop checkout, system acceptance, graphics acceptance, logic acceptance, and instrument-calibration acceptance referenced in PWS 1.2(7). Contractor needs to show CE HVAC personnel that Exhaust Troubleshooting has been corrected and operational.
11. Existing system quantity: To support a complete firm-fixed-price quote, are current control drawings, point lists, controller/terminal-equipment counts, or existing sequences of operation available for Building 4607? If not, please confirm that offerors should price the troubleshooting effort based solely on the PWS as issued.
Please see attached pictures
12. Access/scheduling: Are there specific normal work-hour, escort, badging, or operational-window constraints beyond the base-access requirements stated in the PWS that offerors should include in pricing? Normal work hours 0700-1600 M-F