This is a Performance Work Statement (PWS) for Building 4607 Exhaust System Troubleshooting services at Cannon Air Force Base, New Mexico, to be performed for the 27th Special Operations Civil Engineer Squadron (27 SOCES).

The contractor shall provide all necessary labor, personnel, equipment, tools, materials, transportation, supervision, and qualifications to troubleshoot the Building 4607 exhaust system, which operates on an Andover Continuum front-end controls platform. Key requirements include testing and troubleshooting the communications control bus serving all controllers and terminal equipment; verifying communications between the Andover Continuum platform, controllers, and associated terminal equipment; verifying the existing sequence of operations and identifying discrepancies or failed equipment; and identifying and documenting non-functioning controllers, terminal equipment, communications components, and other equipment requiring repair or replacement. The contractor must provide all radios required for field personnel communication and deliver a final written deficiency report to 27 SOCES that identifies equipment and controllers tested, communications deficiencies, non-functioning controllers and terminal equipment, sequence-of-operations discrepancies, recommended repair or replacement actions, and any conditions preventing complete testing or troubleshooting. The Government will provide access to electricity and potable water subject to availability, bathroom facilities, and secure storage for contractor tools and equipment, but will not provide office space. Contractor personnel must maintain a neat appearance, be readily identifiable as contractor employees, possess English language proficiency, and obtain required passes and identification from the 27th Special Operations Security Forces Squadron Pass and Identification Section to access Cannon Air Force Base.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

BUILDING 4607 EXHAUST SYSTEM TROUBLESHOOTING

Cannon Air Force Base, New Mexico

1. DESCRIPTION OF SERVICES

The contractor shall provide all labor, personnel, equipment, tools, materials, transportation, supervision, qualifications, and other items and services necessary to troubleshoot the Building 4607 exhaust system.

The contractor shall troubleshoot the communications control bus; verify the sequence of operations; and develop a deficiency list identifying non-functioning controllers, terminal equipment, and other associated equipment. The existing front-end controls platform is Andover Continuum.

Upon completion of troubleshooting, the contractor shall provide the 27th Special Operations Civil Engineer Squadron (27 SOCES) a written report identifying items requiring repair or replacement. The contractor shall perform all requirements of this PWS in compliance with applicable federal, state, and local laws, regulations, and industry standards.

1.2. REQUIREMENTS

The contractor shall:

1. Test and troubleshoot the communications bus serving all controllers and terminal equipment.

2. Verify communications between the Andover Continuum front-end platform, controllers, and associated terminal equipment.

3. Verify the existing sequence of operations for the Building 4607 exhaust system and identify discrepancies, deficiencies, or failed equipment affecting proper operation.

4. Identify and document non-functioning controllers, terminal equipment, communications components, and other equipment requiring repair or replacement.

5. Provide all radios required for communication among contractor field personnel.

Contractor-provided radios may be used on Cannon Air Force Base (CAFB).

6. Provide a final written deficiency report to 27 SOCES. At a minimum, the report shall identify:

• Equipment and controllers tested;

• Communications deficiencies;

• Non-functioning controllers and terminal equipment;

• Sequence-of-operations discrepancies;

• Recommended repair or replacement actions; and

• Any conditions that prevented complete testing or troubleshooting.

7. The remote engineer shall not be responsible for Government acceptance of loop checkout, system acceptance, graphics acceptance, logic acceptance, or instrument-calibration acceptance.

1.3. GOVERNMENT-FURNISHED UTILITIES AND FACILITIES

The Government will provide access to electricity and potable water, subject to availability in the work area, for performance of services under this PWS.

The Government will not provide office space for contractor personnel. Bathroom facilities will be available. Secure storage space for contractor tools, materials, and test equipment will be available. Emergency medical services are available to contractors on CAFB.

2. GENERAL INFORMATION

2.1. Personnel

Contractor personnel shall present a neat appearance and be readily identifiable as contractor employees. Contractor personnel shall be able to read, write, speak, and understand English.

2.2. CAFB Access

The contractor shall ensure all contractor employees obtain the passes and identification required to perform work under this contract. The 27th Special Operations Security Forces Squadron (27 SOSFS) Pass and Identification Section will provide installation-entry authorizations or passes to authorized contractor personnel.

Contractor personnel operating privately owned vehicles on CAFB shall comply with all applicable state and installation requirements. Entry authorizations shall be renewed as required by the 27 SOSFS Pass and Identification Section