RFI Responses 07.18.2022.pdf

PDF 129 KB Posted

Attached to
B58 Chapel Kitchen Renovation Amendment 0003
Solicitation number
FA485522R0014
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA485522R00140003 SF 30 SIGNED.pdf PDF
FA485522R00140002 Solicitation Amendment 0002.pdf PDF
RFI Responses 08.09.2022.pdf PDF
B58 Chapel Kitchen Renovation - Solicitation Amendment 0001.pdf PDF
B58 Chapel Kitchen Renovation - Site Visit Questions.pdf PDF
6. Hardware Specifications Guideline (2011).pdf PDF
9. UFC 3-410-01 Heating, Ventilating, And Air Conditioning Systems.pdf PDF
8. UFC 3-520-01 Interior Electrical Systems.pdf PDF
7. DDC Requirements Guide (Sep 2014).pdf PDF
B58 Photos.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - SOW (Rev1).pdf PDF
5. RFI Form - Blank.pdf PDF
1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Conceptual Design Drawings.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Combined Specifications (Rev1).pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Solicitation.pdf PDF
4. AEC CAD Standards (Aug 2019).pdf PDF
2. AF3064 Schedule - Example.xls XLS spreadsheet
5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
4. AF3000 Material Submittal - Blank.pdf PDF
3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
2. Architectural Compatibility Guide (2013).pdf PDF
1. As-Builts - Reno Chapel Kitchen, B58 - 14 0068.pdf PDF
3. AF3065 Progress Report - Blank.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Monday, July 18, 2022

RFI

Renovate Chapel Kitchen, B58 - Project #CZQZ 14-0068:

I. Are the new Light fixtures LED? Are they 1’X4’ or 2’X4’ (recessed in grid ceiling)?

II. Can the power for the new Mini-split HVAC Unit come from the existing relocated panel?

A. The existing unit in the kitchen does not have sufficient ampacity to feed the new mini-split.

III. Will a Fire Pull Station need to be added by the door existing the kitchen to outside to meet Fire Code?

IV. Will the existing Heat Detectors be reused?

V. What is going to happen with the old Dishwasher? If a new Dishwasher is to be installed what are the power requirements?

VI. Will all 120-volt receptacles in the kitchen and coffee bar to be GFCI receptacles?

VII. Will the (3) new outlets above countertops be feed from the relocated Electrical

Panel?

VIII. Are there any requirements to upgrade the existing Exhaust Hood or is it to remain with no changes?

G. Kenny Combs (575) 607-6800

CEI, LLC

(Electrical Contractor)

1706 S. Roosevelt Rd. 3, Portales, NM 88130

(575) 607-0710 – combselect@gmail.com EE98 NM License# 401758 mailto:combselect@gmail.com 1184009150C Typewritten Text LED are required. 2' x 4' are typical on Base and preferred.

1184009150C Typewritten Text Yes, can come from existing panel.

1184009150C Typewritten Text Only electrical upgrades in support of the mini-split are acceptable.

1184009150C Typewritten Text Pull Station shall only be included if necessary to meet code.

1184009150C Typewritten Text Existing detectors may be reused only if in good condition.

1184009150C Typewritten Text Existing dishwasher not within scope.

1184009150C Typewritten Text GFCI receptacles only required if necessary to meet code.

1184009150C Typewritten Text Correct.

1184009150C Typewritten Text Existing exhaust hood not within scope.