FA485522R0014 - B58 Chapel Kitchen Reno - Solicitation.pdf

PDF 514 KB Posted

Attached to
B58 Chapel Kitchen Renovation Amendment 0003
Solicitation number
FA485522R0014
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA485522R00140003 SF 30 SIGNED.pdf PDF
FA485522R00140002 Solicitation Amendment 0002.pdf PDF
RFI Responses 08.09.2022.pdf PDF
RFI Responses 07.18.2022.pdf PDF
B58 Chapel Kitchen Renovation - Solicitation Amendment 0001.pdf PDF
B58 Chapel Kitchen Renovation - Site Visit Questions.pdf PDF
6. Hardware Specifications Guideline (2011).pdf PDF
9. UFC 3-410-01 Heating, Ventilating, And Air Conditioning Systems.pdf PDF
8. UFC 3-520-01 Interior Electrical Systems.pdf PDF
7. DDC Requirements Guide (Sep 2014).pdf PDF
B58 Photos.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - SOW (Rev1).pdf PDF
5. RFI Form - Blank.pdf PDF
1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Conceptual Design Drawings.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Combined Specifications (Rev1).pdf PDF
4. AEC CAD Standards (Aug 2019).pdf PDF
2. AF3064 Schedule - Example.xls XLS spreadsheet
5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
4. AF3000 Material Submittal - Blank.pdf PDF
3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
2. Architectural Compatibility Guide (2013).pdf PDF
1. As-Builts - Reno Chapel Kitchen, B58 - 14 0068.pdf PDF
3. AF3065 Progress Report - Blank.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

YES NO

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

Created On: 30 Jun 2022, 04:07 PM Central Standard Time

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

Section A - Solicitation/Contract Form

FY22 F18DA 374449 27SOCES PLANNING FM9 CZQZ140068 Renovate Chapel Kitchen B58

Purchase Requisition Number: F1L3J21285A001 Date: 19 Jan 2022 Proposal Identifier: FA485522R0014 Date: 30 Jun 2022

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Qty Unit Unit Price

Amount

B58 Chapel Kitchen Renovation

Product Service Code: Z2FE Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

Requirements FY22 F18DA 374449 27SOCES PLANNING FM9 CZQZ140068 Renovate Chapel Kitchen B58 The scope of work includes a renovation of the Chapel kitchen to increase the overall area. Work includes but is not limited to asbestos abatement as well as demolition and disposal of the following: existing ceilings, tile, cabinetry, countertop shutters, HVAC equipment, and a select non-load bearing wall. Walls shall be patched appropriately and painted, new cabinetry and countertops shall be installed, and new ceiling grid and tile shall be installed throughout, and minor electrical work shall be performed to relocate an electrical panel and provide additional outlets.

Section D - Packaging and Marking

This section is not applicable

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.246-12 Inspection of Construction. Aug 1996 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Please contact the COR for inspection/acceptance.

DoDAAC: F1L3J2 CountryCode: USA

27 SOCES CC

AF BPN NO MILSBILLS PROCESSES

506 N AIR COMMANDO WAY

CANNON AFB, NM 88103-5100

UNITED STATES

Frederick Tenorio Email: frederick.tenorio@us.af.mil Telephone: 575-640-4405

Section F - Deliveries or Performance

Overall Contract Delivery Period

From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt

From date of lead time event to completion of performance 10 Calendar Days Date of Notice to Proceed Receipt

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date 252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. Dec 2018

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Progress Report, AF 3065

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice Type: "Construction"

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4855 Admin DoDAAC FA4855 Inspect By DoDAAC Ship To Code

F1L3J2 F1L3J2

Ship From Code Mark For Code

N/A N/A

Service Approver (DoDAAC) F1L3J2 Service Acceptor (DoDAAC) F1L3J2 Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact:

Current Contracting Officer and Contracting Administrator

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

This section is not applicable

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights.

Jun 2020

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. May 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

Jul 2018

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

Aug 2020

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.

Jun 2020

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.211-13 Time Extensions. Sep 2000 52.214-29 Order of Precedence-Sealed Bidding. Jan 1986 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.219-8 Utilization of Small Business Concerns. Oct 2018 52.222-3 Convict Labor. Jun 2003 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. May 2018 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015

52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method).

Aug 2018

52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-50 Combating Trafficking in Persons. Oct 2020 52.222-54 Employment Eligibility Verification. Oct 2015 52.222-55 Minimum Wages Under Executive Order 13658. Nov 2020 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2017 52.223-5 Pollution Prevention and Right-to-Know Information. May 2011 52.223-5 Alternate I Pollution Prevention and Right-to-Know Information. - (Alternate I) May 2011 52.223-6 Drug-Free Workplace. May 2001 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-19 Compliance with Environmental Management Systems. May 2011 52.223-20 Aerosols. Jun 2016 52.223-21 Foams. Jun 2016 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.227-1 Authorization and Consent. Jun 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. Jun 2020 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-16 Alternate III Progress Payments. - (Alternate III) Jun 2020 52.232-16 Alternate I Progress Payments. - (Alternate I) Jun 2020 52.232-17 Interest. May 2014

52.232-23 Assignment of Claims. May 2014 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Dec 2013 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

Apr 1984

52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-17 Layout of Work. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-1 Alternate I Changes-Fixed-Price. - (Alternate I) Aug 1987 52.243-4 Changes. Jun 2007 52.243-5 Changes and Changed Conditions. Apr 1984 52.244-6 Subcontracts for Commercial Items. Jul 2021 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-10 Default (Fixed-Price Construction). Apr 1984

DFARS Clauses Incorporated by Reference

Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Sep 2013 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Dec 2019 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. May 2016

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2021

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jun 2013 252.225-7001 Buy American and Balance of Payments Program. Dec 2017 252.225-7002 Qualifying Country Sources as Subcontractors. Dec 2017 252.225-7048 Export-Controlled Items. Jun 2013 252.232-7010 Levies on Contract Payments. Dec 2006

252.232-7017 Accelerating Payments to Small Business Subcontractors-Prohibition on Fees and Consideration.

Apr 2020

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jun 2013 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.244-7000 Subcontracts for Commercial Items. Oct 2020

FAR Clauses Incorporated by Full Text

52.204-1 Approval of Contract. Dec 1989

As prescribed in , insert the following clause:4.103

APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of [identify title of designated agency official here] and shall not be binding the Contracting Officer until so approved.

(End of clause)

52.211-10 Commencement, Prosecution, and Completion of Work. Apr 1984

As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60.* The time stated for completion shall include final cleanup of the premises.

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 Liquidated Damages-Construction. Sep 2000

As prescribed in 11.503(b), insert the following clause in solicitations and contracts:

Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $71.80 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.219-28 Post-Award Small Business Program Rerepresentation. Sep 2021

As prescribed in , insert the following clause:19.309(c)(1)

POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)

. As used in this clause-(a) Definitions means a contract of more than five years in duration, including options. However, the term does not include contracts that Long-term contract exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

-Small business concern

Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is (1) bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the (2) Affiliates others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the (b) Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the (1) novation agreement was executed prior to inclusion of this clause in the contract.

Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to (2) include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

For long-term contracts-(3)

Within 60 to 120 days prior to the end of the fifth year of the contract; and(i)

Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.(ii)

If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the (c) Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, when the Contracting Officer explicitly requires it for an order issued under a multiple-award contract.

The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that (d) corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees if the acquisition-

Was set aside for small business and has a value above the simplified acquisition threshold;(1)

Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; (2) or

Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business (3) set-aside or sole-source award regardless of dollar value.

Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraph (b) and (c) of this (f) clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not (g) required to, take the actions required by paragraphs (f) or (h) of this clause.

If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code (h) applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it is, is not a small business concern under NAICS Code assigned to contract number .(1) ____ ____

[ .] The Contractor (2) Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause represents that it is, is not, a small disadvantaged business concern as defined in .13 CFR 124.1002

[ ] The Contractor (3) Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.

represents that it is, is not a women-owned small business concern.

Women-owned small business (WOSB) concern eligible under the WOSB Program. [(4) Complete only if the Contractor represented itself ] The Contractor represents that-as a women-owned small business concern in paragraph (h)(3) of this clause.

It is, is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB (i) Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

It is, is not a joint venture that complies with the requirements of , and the representation in paragraph (h)(4)(ii) 13 CFR part 127

(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture. [The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: ____ .] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

Economically disadvantaged women-owned small business (EDWOSB) concern.[(5) Complete only if the Contractor represented itself as a ] The Contractor represents that-women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.

It is, is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB (i) Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

It is, is not a joint venture that complies with the requirements of , and the representation in paragraph (h)(5)(ii) 13 CFR part 127

(i) of this clause is accurate for each EDWOSB concern participating in the joint venture. [The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: .] Each EDWOSB concern participating in the joint ____ venture shall submit a separate signed copy of the EDWOSB representation.

[ ] The Contractor (6) Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.

represents that it is, is not a veteran-owned small business concern.

[ ] The (7) Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.

Contractor represents that it is, is not a service-disabled veteran-owned small business concern.

[ ] The Contractor (8) Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.

represents that-

It is, is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone (i) Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in (ii) paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small ____ business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[ ] Contractor to sign and date and insert authorized signer's name and title.

(End of clause)

52.223-3 Hazardous Material Identification and Material Safety Data. Feb 2021

As prescribed in , insert the following clause:23.303

HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021)

"Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No.313 (a) (including revisions adopted during the term of the contract).

The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous (b) material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material (If none, insert )None Identification No.

This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered (c) under this contract is hazardous.

The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the (d) requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No.313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No.313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No.313, which renders incomplete or (e) inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or (f) liability for the safety of Government, Contractor, or subcontractor personnel or property.

Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, (g) ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

The Government's rights in data furnished under this contract with respect to hazardous material are as follows:(h)

To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to-(1)

Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous (i) materials;

Obtain medical treatment for those affected by the material; and(ii)

Have others use, duplicate, and disclose the data for the Government for these purposes.(iii)

To use, duplicate, and disclose data furnished under this clause, in accordance with paragraph (h)(1) of this clause, in precedence over (2) any other clause of this contract providing for rights in data.

The Government is not precluded from using similar or identical data acquired from other sources.(3)

(End of clause)

52.225-9 Buy American-Construction Materials. Feb 2021

As prescribed in , insert the following clause:25.1102(a)

BUY AMERICAN-CONSTRUCTION MATERIALS (FEB 2021)

. As used in this clause-(a) Definitions

-Commercially available off-the-shelf (COTS) item

Means any item of supply (including construction material) that is-(1)

A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);(i)

Sold in substantial quantities in the commercial marketplace; and(ii)

Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in (iii) the commercial marketplace; and

Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.(2)

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

-Cost of components means

For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the (1) construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation (2) costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

means-Domestic construction material

For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-(1)

An unmanufactured construction material mined or produced in the United States; or(i)

A construction material manufactured in the United States, if-(ii)

The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its (A) components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

The construction material is a COTS item; or(B)

For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material (2) manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, Fastener rivets, nails, clips, and screws.

means a construction material other than a domestic construction material.Foreign construction material means iron or steel products not produced in the United States. Produced in the United States means that all Foreign iron and steel manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

means that the cost of the iron and steel content exceeds 50 percent of the total cost of Predominantly of iron or steel or a combination of both all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.Steel

"United States" means the 50 States, the District of Columbia, and outlying areas.

Domestic preference. (b) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction (1) material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

This requirement does not apply to information technology that is a commercial item or to the construction materials or components (2) listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate "none"]None

The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government (3) determines that-

The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to (i) the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

The application of the restriction of the Buy American statute to a particular construction material would be impracticable or (ii) inconsistent with the public interest; or

The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available (iii) commercial quantities of a satisfactory quality.

Request for determination of inapplicability of the Buy American statute. (c) (1) Any Contractor request to use foreign construction material (i) in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

A description of the foreign and domestic construction materials;(A)

Unit of measure;(B)

Quantity;(C)

Price;(D)

Time of delivery or availability;(E)

Location of the construction project;(F)

Name and address of the proposed supplier; and(G)

A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this (H) clause.

A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the (ii) format in paragraph (d) of this clause.

The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a (iii) duty-free certificate may be issued).

Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably (iv) foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer (2) and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is (3) noncompliant with the Buy American statute.

. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the (d) Data following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description

Unit of Measure

Quantity Price

(dollars)

Item1:

Foreign construction material ____ ____ ____

Domestic construction material ____ ____ ____

Item2: ____ ____ ____

Foreign construction material

Domestic construction material

[* ].Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)

[ ]List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

[ ]Include other applicable supporting information.

(End of clause)

52.227-4 Patent Indemnity-Construction Contracts. Dec 2007

As prescribed in , insert the following clause:27.201-2(d)(1)

PATENT INDEMNITY-CONSTRUCTION CONTRACTS (DEC 2007)

Except as otherwise provided, the Contractor shall indemnify the Government and its officers, agents, and employees against liability, including costs and expenses, for infringement of any United States patent (except a patent issued upon an application that is now or may hereafter be withheld from issue pursuant to a Secrecy Order under ( 35 U.S.C. 181) arising out of performing this contract or out of the use or disposal by or for the account of the Government of supplies furnished or work performed under this contract.

(End of clause)

52.232-5 Payments under Fixed-Price Construction Contracts. May 2014

As prescribed in , insert the following clause:32.111(a)(5)

PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

. The Government shall pay the Contractor the contract price as provided in this contract.(a) Payment of price

. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as (b) Progress payments determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.

The Contractor's request for progress payments shall include the following substantiation:(1)

An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment (i) requested.

A listing of the amount included for work performed by each subcontractor under the contract.(ii)

A listing of the total amount of each subcontract under the contract.(iii)

A listing of the amounts previously paid to each such subcontractor under the contract.(iv)

Additional supporting data in a form and detail required by the Contracting Officer.(v)

In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be (2) taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-

Consideration is specifically authorized by this contract; and(i)

The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform (ii) this contract.

. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment (c) Contractor certification shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)

I hereby certify, to the best of my knowledge and belief, that-

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

____ ( )Name

____ ( )Title

____ ( )Date

. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of (d) Refund of unearned amounts such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-

Notify the Contracting Officer of such performance deficiency; and(1)

Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this (2) clause) equal to interest on the unearned amount from the 8 thday after the date of receipt of the unearned amount until-

The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or(i)

The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the (ii) unearned amount.

. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be (e) Retainage made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.

. All material and work covered by progress payments made shall, at the time of payment, become (f) Title, liability, and reservation of rights the sole property of the Government, but this shall not be construed as-

Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration (1) of any damaged work; or

Waiving the right of the Government to require the fulfillment of all of the terms of the contract.(2)

. In making these progress payments, the Government shall, upon request, reimburse the Contractor for (g) Reimbursement for bond premiums the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety.