3. AF3065 Progress Report - Blank.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
B58 Chapel Kitchen Renovation Amendment 0003
Solicitation number
FA485522R0014
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA485522R00140003 SF 30 SIGNED.pdf PDF
FA485522R00140002 Solicitation Amendment 0002.pdf PDF
RFI Responses 08.09.2022.pdf PDF
RFI Responses 07.18.2022.pdf PDF
B58 Chapel Kitchen Renovation - Solicitation Amendment 0001.pdf PDF
B58 Chapel Kitchen Renovation - Site Visit Questions.pdf PDF
6. Hardware Specifications Guideline (2011).pdf PDF
9. UFC 3-410-01 Heating, Ventilating, And Air Conditioning Systems.pdf PDF
8. UFC 3-520-01 Interior Electrical Systems.pdf PDF
7. DDC Requirements Guide (Sep 2014).pdf PDF
B58 Photos.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - SOW (Rev1).pdf PDF
5. RFI Form - Blank.pdf PDF
1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Conceptual Design Drawings.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Combined Specifications (Rev1).pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Solicitation.pdf PDF
4. AEC CAD Standards (Aug 2019).pdf PDF
2. AF3064 Schedule - Example.xls XLS spreadsheet
5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
4. AF3000 Material Submittal - Blank.pdf PDF
3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
2. Architectural Compatibility Guide (2013).pdf PDF
1. As-Builts - Reno Chapel Kitchen, B58 - 14 0068.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACT PROGRESS REPORT
Public reporting burden for this collection of information is estimated to average per reseponse, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 9000-0062, Washington, DC, 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
CONTRACTORADDRESS
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
1TO:
LINE NO.WORK ELEMENT% of TOTAL JOBPREVIOUS CUMULATIVE %% COMPLETED THIS PERIOD% COMPLETED CUMULATIVE
1Bond0000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
130000
140000
150000
160000
170000
180000
190000
200000
21000
22000
23000
Total0.00%0.00%0.00%0.00%
REMARKS
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR
CONTRACTORBASE CIVIL ENGINEERING
TYPE OR PRINT NAME AND TITLESIGNATUREDATE
SSgt David E. Bunn, Construction Inspector19-Feb-16
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

Sheet2

Sheet3