B58 Chapel Kitchen Renovation - Site Visit Questions.pdf

PDF 77 KB Posted

Attached to
B58 Chapel Kitchen Renovation Amendment 0003
Solicitation number
FA485522R0014
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA485522R00140003 SF 30 SIGNED.pdf PDF
FA485522R00140002 Solicitation Amendment 0002.pdf PDF
RFI Responses 08.09.2022.pdf PDF
RFI Responses 07.18.2022.pdf PDF
B58 Chapel Kitchen Renovation - Solicitation Amendment 0001.pdf PDF
6. Hardware Specifications Guideline (2011).pdf PDF
9. UFC 3-410-01 Heating, Ventilating, And Air Conditioning Systems.pdf PDF
8. UFC 3-520-01 Interior Electrical Systems.pdf PDF
7. DDC Requirements Guide (Sep 2014).pdf PDF
B58 Photos.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - SOW (Rev1).pdf PDF
5. RFI Form - Blank.pdf PDF
1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Conceptual Design Drawings.pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Combined Specifications (Rev1).pdf PDF
FA485522R0014 - B58 Chapel Kitchen Reno - Solicitation.pdf PDF
4. AEC CAD Standards (Aug 2019).pdf PDF
2. AF3064 Schedule - Example.xls XLS spreadsheet
5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
4. AF3000 Material Submittal - Blank.pdf PDF
3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
2. Architectural Compatibility Guide (2013).pdf PDF
1. As-Builts - Reno Chapel Kitchen, B58 - 14 0068.pdf PDF
3. AF3065 Progress Report - Blank.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B58 CHAPEL KITCHEN RENOVATION

SITE VISIT QUESTIONS & ANSWERS

• Wil l the water service in the existing panty be furred out or relocated? If relocated, where wil l it be moved to?

A: No relocation; Only enclosed if required by code

• The water service is a 2½ ” galvanized pipe— one option for moving the water l ine would be to relocate it to the door opening that wil l be closed off (The wall will need to be demolished to above ceiling with this option); How would you l ike this addressed?

A: Relocation of water line is not in scope

• What are the plans for the main water l ine?

A: Unless required by code or space constraints, no plans for water line except match interior finishes

• There is no reference to the material for the countertop— what type of material should we bid?

A: Material must be resilient enough for long-term, semi-commercial use (Chapel users have specifically asked for a more durable material than the existing laminate)

• Wil l cabinets with locking mechanisms be required for this project?

A: Yes; Approximately 50% of the doors/cabinets will require locks

• It was noted at the site visit that the dishwasher is inoperable— is it going, staying, or being replaced? Wil l it be commercial or residential? Do we need to price a new dishwasher? If a new dishwasher is installed, what are the power requirements?

A: Dishwasher not in scope

• Are new l ighting fixtures required? Will additional l ighting need to be installed in the new expanded space after demo?

A: In order to make use of the new ceiling grid (also in scope of this project), new lighting will be required

• Are the new l ight fixtures LED? Are they 1’ x4’ or 2’ x4’ ? (recessed in grid ceil ing)

A: LED are required— 2’x4’ are typical on base and preferred

• Can the power for the new mini-split HVAC unit come from the existing relocated panel? (the existing unit in the kitchen does not have sufficient ampacity to feed the new mini-split)

A: If more power is required for the mini-split, pull from closest suitable panel or the existing panel; Only electrical upgrades in support of the mini-split are acceptable

• Wil l a fire pull station need to be added by the door exiting the kitchen to outside to meet fire code?

A: Only if required by code

• Wil l the existing heat detectors be reused?

A: Existing detectors may be reused only if in good condition

• Are GCFI outlets a requirement for this project? Will al l 120V receptacles in the kitchen and coffee bar be GFCI receptacles?

A: Only if required by UFCs/code

• Wil l the (3) new outlets above the countertops be fed from the relocated electrical panel?

A: Yes

• Are there any requirements to upgrade the existing exhaust hood or is it to remain with no changes?

A: Existing exhaust hood not within scope