This is a Questions and Answers (Q&A) document providing clarifications to 38 contractor inquiries regarding solicitation FA483027Q0004 for Vent Hood Services at Moody Air Force Base.

The requirement encompasses kitchen hood and duct cleaning services in accordance with NFPA 96, paragraph 12.6, at multiple facilities including the main Moody AFB installation and Grassy Pond Recreation Area (Building 2019) located 29 miles south in Lake Park, Georgia. The scope includes cleaning 19 total hoods—8 requiring quarterly service and 11 requiring semi-annual service—across buildings 210, 571, 583, 621, 901, 904, 956, 1804, 1806, and 2019. Work is scheduled for performance during standard duty hours (7:00 a.m. to 5:00 p.m., Monday through Friday), though coordination with facility points of contact is required to minimize disruption to food preparation operations. The base period runs from June 1, 2027, through May 31, 2028, with option years available. The incumbent contractor is OMUP, LLC, under contract FA4830-20-C-0011 at $67,366.00. Quotations are due November 24, 2026, by 2:00 p.m. EST. The Q&A clarifies that site-visit attendance was not mandatory, unit prices should cover all hoods assigned to a CLIN for one service visit, pricing may differ from workmark escalation formulas, and offerors must have a current NIST SP 800-171 assessment posted in SPRS prior to award due to CUI handling requirements. Service Contract Act wage determination 2015-4493 Rev. 33 applies, with contractors responsible for mapping personnel to appropriate occupational classifications. Insurance compliance documentation must be submitted with the quotation.

View the file

Other files

File Type Posted
Attachment 4. Price Schedule.xlsx XLSX spreadsheet
SF 1449 Amended.pdf PDF
Attachment 7. Base Pass Request.pdf PDF
Attachment 5. Question and Answer Form.docx DOCX document
Attachment 4.FY 27 Vent Hood Service Price Schedule.xlsx XLSX spreadsheet
Attachment 1. SOW.pdf PDF
Attachment 2. Insurance Compliance.pdf PDF
SF 1499.pdf PDF
Attachment 3.Wage Determination 2015-4493 Rev 33.pdf PDF
Attachment 6. Base Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ1805996

Attachment 4

ATTACHMENT 4

Questions & Answers Matrix

Solicitation Reference

Question/Comment

Government Response (Govt Use Only) Resulted in change of PWS (Govt Use Only) Change Reference (Govt Use Only)

1
SF 1449
Is there an incumbent that has handled this previously? If so, who is it, what is the contract number, and what is the award amount?
(Public record)

Yes. OMUP, LLC

FA4830-20-C-0011

$67,366.00

2
Attachment 1, SOW Para. 4.1; Attachment 7
Does Grassy Pond Recreation Area (Bldg 2019) require a Moody AFB base pass, or is it independently accessible as an off-base facility? Will a facility POC be available to provide access on scheduled cleaning dates?
Bldg 2019 is located at Grassy Pond in Lake Park, GA, 29 miles south of Moody AFB. A base pass is not required for that off-installation location. Yes, a POC will be available to provide access on scheduled cleaning dates.
3
Attachment 1, SOW Table 1; Attachment 4, Price Schedule
Building 901 lists two entries (Moody Field Club and Wright Brothers) at the same address. Are these two distinct food-service operations within one building, and is the system count confirmed?
SOW Table 1 identifies two quarterly hoods at Bldg 901, both labeled Moody Field Club: 14' x 8" and 14' x 3' 3". The SOW does not identify a separate Wright Brothers operation or confirm a total system count.
4
SAM.gov posting
Where can offerors find the list of interested vendors, planholders, or potential prime contractors for this requirement?
The SAM.gov posting includes an Interested Vendors section. Offerors may review that section on the opportunity posting for the current list of interested vendors.
5
SF 1449; SAM.gov posting
Please confirm the anticipated award date and whether any availability-of-funds limitation affects the planned performance start date.
No anticipated award date is stated in the solicitation. The planned base period is 1 June 2027 through 31 May 2028. The SAM.gov posting states that funds are not presently available and that the Government's obligation is contingent on the availability of appropriated funds and written notice from the Contracting Officer.
6
Attachment 1, SOW Para. 1; Para. 3.1.1
Please confirm whether the required scope includes hood, duct, and exhaust-fan cleaning, or whether it is limited to inspection, testing, maintenance, hydrostatic testing, and related servicing of chemical fire suppression systems.
The scope is kitchen hood and duct cleaning in accordance with NFPA 96, paragraph 12.6. The SOW requires cleaning of hoods, ducting, vents, fans, louvers, filters, and related exhaust surfaces to bare metal. It does not establish a separate scope for inspection, testing, hydrostatic testing, or routine servicing of wet-chemical fire-suppression systems.
7
Attachment 1, SOW Para. 3.1; Para. 3.2; Table 1
Please confirm whether K-class portable fire extinguishers associated with kitchen hood/wet-chemical systems are included in the NFPA 17A scope, or whether the scope is limited to fixed wet-chemical fire suppression systems.
K-class portable fire extinguishers are not identified in the SOW scope. The SOW scope is limited to cleaning kitchen hoods, ducts, and associated exhaust components.
8
Attachment 1, SOW Para. 3.1.2; Para. 3.5
The SOW states standard work hours are 7:00 a.m. through 5:00 p.m., Monday through Friday, and scheduling should minimize disruption to food preparation. For kitchen systems in use during the day, please confirm expected service timeframes and whether work should be coordinated during non-operational windows.
Work should be performed during 7:00 a.m. to 5:00 p.m., Monday through Friday. If work cannot be accomplished during those hours, the contractor will be provided facility POC phone numbers and shall coordinate the schedule to minimize disruption to food preparation; some facilities may require cleaning one hood at a time.
9
SF 1449, 52.212-1 Addendum; 52.212-2
May an offeror use relevant experience and past-performance references from its proposed subcontractor that will perform the hood and duct cleaning? If the offeror lacks relevant past performance of its own, how will it be evaluated? Please also confirm that relevant experience for this requirement is kitchen hood and exhaust-duct cleaning, rather than fire suppression services.
Volume 3 requires references for services similar in scope to this requirement performed within the last five years. The SOW describes this requirement as kitchen hood and duct cleaning; however, the SF 1449 evaluation text refers to Fire Suppression Services. Offerors with no relevant past-performance record, or with information too sparse for a meaningful rating, will receive an unknown/neutral past-performance rating, which is considered acceptable. The solicitation does not expressly address use of a proposed subcontractor's references.
10
SF 1449, Section I; FAR 52.219-14
Does FAR 52.219-14, Limitations on Subcontracting, apply to this acquisition? If applicable, please identify the required prime-contractor self-performance and whether work performed by a similarly situated small-business subcontractor counts toward the prime contractor's required share.
FAR 52.219-14, Limitations on Subcontracting, is not listed among the clauses incorporated in the SF 1449 as issued. Accordingly, the solicitation does not state a prime self-performance percentage or a similarly situated subcontractor treatment under that clause.
11
Attachment 1, SOW; solicitation technical requirements
Are any specialized licenses or certifications required to be held directly by the prime contractor, or may they be held by the qualified subcontractor performing the cleaning?
The SOW does not identify a specialized hood-cleaning license or certification that must be held by the prime contractor. It requires contractor personnel operating vehicles on base to maintain a state driver's license appropriate to the vehicle, and it requires applicable security, safety, and hazardous-material training/approvals.
12
Attachment 4, Price Schedule
Please confirm the quotation-entry instructions for the Bid Schedule: should offerors enter their own unit prices directly in the Base Year and option-year price fields, may option-year prices differ from the workbook's 2.5-percent escalation formula, and must the Vent Hood and Vehicle Cost tab be completed and submitted?
The SF 1449 directs offerors to submit proposed pricing using Attachment 4, Pricing Schedule Worksheet, and to enter dollar values rounded to the nearest hundredth. The SF 1449 does not otherwise address completion of the Vent Hood and Vehicle Cost tab or whether option-year pricing may differ from the workbook formula.
13
Attachment 4, Price Schedule; Attachment 1, SOW Table 1
Please reconcile the CLIN and service schedule information. Buildings 571 and 583 appear under both quarterly and semiannual CLINs, and the CLIN numbering on the Vent Hood tab appears inconsistent with the Bid Schedule. Which schedule governs? Please confirm whether each CLIN unit price covers all hoods listed for that CLIN for one service visit, and whether CLIN quantities of 4 or 2 represent visits per year.
SF 1449 Section B identifies CLINs 0001–0005 as quarterly cleaning with quantity 4, and CLINs 0006–0012 as semi-annual cleaning with quantity 2. SOW Table 1 separately lists quarterly and semi-annual hood groups at Buildings 571 and 583. The SF 1449 does not expressly state whether a CLIN unit price is per individual hood or for all hoods assigned to that CLIN for one visit.
14
SF 1449, 52.212-1 Addendum Para. C; Attachment 2, Insurance Compliance
Please confirm the correct insurance-compliance attachment (the instructions refer to Attachment 3 while the package identifies Attachment 2), the required coverage limits, and whether a completed compliance form is sufficient at quotation submission or an active policy/certificate is required. May subcontractor policies satisfy any required coverage, including commercial automobile and workers' compensation, when the subcontractor performs the on-site work?
The SF 1449 attachment list identifies Attachment 2 as Insurance Compliance and Attachment 3 as the Wage Determination. The 52.212-1 addendum refers to Attachment 3 for the insurance form, which is inconsistent with the attachment list. The addendum requires submission of a completed Certificate of Compliance with Insurance Requirement form with the quote. The SOW, SAM.gov posting, and SF 1449 do not otherwise state the requested coverage limits or subcontractor-policy treatment.
15
SAM.gov posting; SF 1449
The solicitation materials appear to identify different deadlines for submission of questions. Please confirm the controlling question-and-answer deadline.
The controlling deadline is 2:00 p.m. EST on 17 November 2026, as stated in the SF 1449 Special Contract Requirements and Questions and Answers section. The SAM.gov posting reflects 16 November 2026; this is inconsistent with the SF 1449.
16
SF 1449, DFARS 252.204-7012, 252.204-7019, and 252.204-7020; Attachment 1, SOW
For this cleaning-services requirement, please clarify whether an offeror must have a current NIST SP 800-171 assessment in SPRS before award and identify what information, if any, the contractor or subcontractor must handle as CUI during performance.
Yes. An offeror must have a current NIST SP 800-171 assessment recorded in the Supplier Performance Risk System (SPRS) prior to award.

Neither the SOW nor the solicitation text identifies any specific technical, operational, or deliverable information generated during cleaning performance that must be processed or handled as CUI.

17
Attachment 1, SOW Para. 1.1.1–1.1.2; Table 1
For each hood system, please provide or confirm the number and type of exhaust fans, approximate duct-run length/configuration, location of NFPA 96 access panels, and roof-access method. Are exhaust-fan hinge kits installed? If access panels or hinge kits are missing or damaged, is installation within this scope or separately addressed?
Each hood system is expected to have at least one exhaust fan; however, some systems may be equipped with multiple exhaust fans. Fan type and manufacturer have not been verified and shall be confirmed by the contractor during on-site performance. Duct-run lengths, routing, and configurations vary by facility and shall also be verified on site. The contractor shall provide an extension ladder suitable for accessing rooftop exhaust fans, except at the Fire Department facility, where roof access will be provided through the tower with coordination facilitated by the Fire Inspector. This is due to the roof being to high. Exhaust-fan hinge kits are installed to support safe access for cleaning and maintenance. If a hinge kit is missing, damaged, or otherwise unserviceable, the Contracting Officer’s Representative (COR) will submit a work task to the 23d Civil Engineer Squadron (23 CES) for repair or replacement. The contractor and COR shall jointly verify the location and adequacy of National Fire Protection Association (NFPA) 96-required access panels at each facility during the initial hood service.
18
Attachment 1, SOW Table 1
Please provide or confirm the approximate grease-baffle filter count for each hood system and whether filters may be cleaned on-site, outdoors, or removed from the installation for cleaning.
Each kitchen exhaust hood configuration is unique and may contain a different number, size, and arrangement of grease baffles. The cleaning team should inspect each hood before beginning work to determine the appropriate cleaning method, equipment, and estimated time required. Grease baffle filters may be removed and cleaned outdoors on site, provided the designated area is suitable and all wastewater, grease, and debris are properly contained and disposed of in accordance with site requirements.
19
Attachment 1, SOW Para. 1.0; Table 1
Are prior hood/duct inspection reports, as-built drawings, or representative photographs available to assist offerors in assessing system configurations and grease accumulation before quotation submission?
The Base Fire Department inspection team has completed all final inspections of the kitchen exhaust cleaning services and certified that the systems were cleaned in accordance with the Performance Work Statement (PWS) and applicable Base Fire Prevention standards. No interruption in required cleaning services is anticipated between completion of the current contract and commencement of the follow-on contract. Vent hoods in Buildings 571, 583, 901, 904, and 1806 are scheduled for quarterly cleaning in April 2027. Vent hoods in Buildings 210, 571, 621, 956, 583, 1804, and 2019 are scheduled for semiannual cleaning in February 2027. The incoming contractor shall incorporate these scheduled services into its initial performance schedule and maintain all required cleaning intervals thereafter in accordance with the PWS schedule.
20
Attachment 1, SOW Para. 1.1.3; Para. 3.1.19
Will the Government provide water and electrical hookups at each facility? Please identify the approved method and location for capture and disposal of wash water and grease residue, including whether discharge to a grease interceptor or sanitary drain is allowed or whether wastewater must be containerized and removed from the installation.
The contractor may use available base-provided electrical power and water to connect pressure-washing equipment or other approved cleaning equipment necessary to perform kitchen exhaust hood cleaning and maintenance services. Required cleaning procedures are identified in PWS Sections 1.1.3 and 1.1.4. Buildings designated for cooking operations are equipped with wastewater grease traps, and all floor drains within the cooking areas are connected to those grease traps. When grease baffles or other components are washed outside the cooking area, the contractor is responsible for ensuring that all generated wastewater is either discharged only through sanitary drains located within the cooking area or collected and removed from the installation in accordance with applicable environmental requirements.
21
Attachment 1, SOW Para. 1.1.8; Para. 4.3
For operating food facilities, may cleaning be performed after hours or on weekends when coordinated with the facility POC? Please identify any restricted service windows and confirm whether Fire Department inspection, escorts, or facility personnel will be available for work performed outside standard duty hours.
All work schedules shall be coordinated with the appropriate facility points of contact (POCs) before the start of cleaning services, in accordance with PWS Section 4.3. The contractor shall ensure coordination is completed sufficiently in advance to confirm facility access, operational requirements, and any site-specific restrictions that may affect performance.
22
SAM.gov posting; site visit notice
Was attendance at the 12 November 2026 site visit mandatory to submit a quotation? If subcontractors may participate in performance, could a proposed subcontractor attend on behalf of the offeror?
No, Site-visit attendance is not required to submit a quote.

A proposed subcontractor may attend on behalf of the offeror?

23
Attachment 1, SOW Table 1; Attachment 4, Price Schedule
Please reconcile the number and location of systems. Are the food-service systems all located at Moody AFB proper or split between Moody AFB and Grassy Pond? Please confirm the total system and hood count and the quarterly, semiannual, or mixed cleaning frequency for each system.
The SOW identifies work at Moody AFB and one hood at Grassy Pond in Lake Park, GA. Table 1 lists 19 hoods: 8 quarterly hoods and 11 semi-annual hoods. The quarterly locations are Bldgs 571, 583, 901, 904, and 1806; the semi-annual locations are Bldgs 210, 571, 583, 621, 956, 1804, and 2019.
24
Attachment 1, SOW Table 1
Please confirm the hood dimensions for Bldg 583 Bowling Alley (listed as 10' x 4") and Bldg 901 Moody Field Club (listed as 14' x 8"), and confirm the listed 5'6" x 1'6" dimension for Bldg 1806 Golf Club House.
The SOW currently lists Bldg 583 Bowling Alley as 10' x 4", Bldg 901 Moody Field Club as 14' x 8", and Bldg 1806 Golf Club House as 5' 6" x 1' 6". No corrected dimensions are provided in the SOW, SAM.gov posting, or SF 1449.
25
Attachment 3, Wage Determination 2015-4493 Rev. 33; FAR 52.222-62
Please confirm the occupational classification expected for hood and duct cleaning personnel and the applicable health-and-welfare fringe rate.
Under the Service Contract Labor Standards (FAR Subpart 22.10 and 29 CFR Part 4), the contractor is ultimately responsible for mapping its personnel to the Department of Labor (DOL) Service Contract Act (SCA) Directory of Occupations based on its technical approach. Because "Hood and Duct Cleaner" is not a standalone title in the SCA Directory of Occupations , contractors typically map to Janitor (Code 11150), an HVAC/maintenance title, or pursue a post-award conformance (SF-1444) . The applicable Health and Welfare (H&W) fringe rate is governed directly by the attached Wage Determination (under DOL AAM 252, nationwide rates are $5.92/hr or $5.42/hr with EO 13706 paid sick leave)
26
Attachment 1, SOW marking; solicitation attachments
The SOW is marked CUI and was posted with the solicitation. May offerors provide the SOW to prospective subcontractors for quotation support, subject to applicable handling requirements?
The SOW is marked CUI and requires compliance with DoD/DoW CUI requirements. However, Offerors may provide the SOW to prospective subcontractors in accordance with applicable access, handling, need-to-know, and release requirements.
27
SF 1449; SAM.gov posting
May the Government share the estimated total value for the base period and all option years, or confirm whether the anticipated total value is below $350,000?
The Government cannot disclose the Independent Government Cost Estimate (IGCE) or the estimated total value for the base period and option years, nor can it confirm whether the anticipated total value is below $350,000.
28
Site visit; SF 1449 Special Contract Requirements
IFS was represented at the November 12 site visit. That proposed subcontractor has since declined. May IFS quote with a different qualified cleaning subcontractor who did not attend, or is an additional visit or other qualification step required?
The solicitation stated that interested vendors could attend the site visit; it did not state that attendance was mandatory to submit a quotation. The solicitation does not prescribe an additional site visit or other qualification step because an offeror changes proposed subcontractors. Offerors remain responsible for submitting a quotation that meets all solicitation requirements.
29
Cybersecurity clauses and information handling
Will IFS or its performing subcontractor receive, store or process CUI on company systems? Please identify applicable SPRS, NIST 800-171 and CMMC assessment/affirmation requirements, the affected entity or system, and whether evidence is required with the quotation, before award or before performance.
Yes. Because Attachment 1 (Statement of Work) is marked "CUI" at the top and bottom of every page, any company computer, email server, or storage system used by the prime contractor (IFS) or subcontractor to download, view, store, or process the SOW (including the building numbers and cleaning schedules in Table 1) is considered a covered contractor information system handling CUI.

DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (Page 42) — requires contractors to implement NIST SP 800-171 on covered systems.

DFARS 252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements (Page 48) — establishes SPRS filing requirements.

DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements (Page 42) — governs the assessment process.

CMMC Requirements: There are no CMMC (Cybersecurity Maturity Model Certification) clauses (such as DFARS 252.204-7021) included in this solicitation.

With the Quotation: No. The Instructions to Offerors (pages 25–26) do not require offerors to submit any SPRS reports, NIST SP 800-171 system security plans, or compliance evidence with their quotation package.

Before Award: Yes. Under DFARS 252.204-7019, the Contracting Officer is required to verify that the successful offeror has a current (not more than 3 years old) assessment posted in SPRS prior to award. The award cannot be made to an offeror who does not have an assessment registered in SPRS.

Before Performance / Subcontracting: Under DFARS 252.204-7020, the prime contractor must ensure that any subcontractors also have their NIST SP 800-171 assessment posted in SPRS prior to awarding them a subcontract for performance under this requirement.

30
Solicitation attachments; authorized distribution
The supplied SOW is marked CUI. Please confirm whether prospective performing subcontractors may receive it for quotation preparation, the authorized access/transfer method and handling requirements, or provide an approved public/redacted scope suitable for supplier pricing. No controlled details are reproduced in this question.
The SOW is marked CUI. The provided solicitation documents do not identify an authorized transfer method, authorize redistribution to prospective subcontractors, or provide a public/redacted scope. Offerors must follow applicable access, handling, need-to-know, and release requirements and should request Government direction before disseminating CUI to a prospective subcontractor.
31
Attachment 2, Insurance Compliance; SF 1449 clause list; FAR 28.307-2
Attachment 2 says insurance shall be maintained in at least the amounts and types stated in FAR 28.307-2. However, FAR 52.228-5, Insurance—Work on a Government Installation, does not appear in the SF 1449 clause list, and the solicitation states no dollar limits. Please confirm whether FAR 52.228-5 applies and state the required coverages and minimum limits.
Attachment 2 references FAR 28.307-2 for the required amounts and types of insurance. The SF 1449 clause list provided does not identify FAR 52.228-5, and the solicitation documents do not state specific dollar limits or identify additional coverages. A clarification or amendment is required to establish any applicable limits or additional coverage requirements.
32
Attachment 2, items (3) and (4); RFO 52.212-1, Para. I.C
Attachment 2 requires workers’ compensation insurance for the entire performance period and retention of subcontractor insurance proofs. If subcontractor personnel perform all on-site work and are covered by the subcontractor’s Georgia workers’ compensation policy, does that satisfy the requirement? Must certificates of insurance be submitted with the quote or only before performance?
Attachment 2 requires workers’ compensation insurance to be maintained for the performance period and requires the prime contractor to retain subcontractor proof of insurance. RFO 52.212-1, Para. I.C requires the completed Certificate of Compliance with Insurance Requirement with the quotation. The provided documents do not expressly state that a subcontractor policy alone satisfies the prime contractor requirement or require submission of insurance certificates with the quotation.
33
Attachment 4, Pricing Schedule Worksheet; RFO 52.212-1, Volume 1 Para. A; RFO 52.217-8
The Bid Schedule tab is labeled FY27 Government Estimate through FY31 Government Estimate, and the Vent Hood and Vehicle Cost tab contains a cost build-up. Please confirm whether offerors enter unit prices on the Bid Schedule, whether the cost tab must be completed or submitted, whether a CLIN price covers all hoods at the listed location for one visit, and whether offerors must add a line for the six-month extension under FAR 52.217-8.
The solicitation instructs offerors to submit pricing in Attachment 4, Pricing Schedule Worksheet, and to enter dollar values rounded to two decimal places. The Cost Tab should not be completed.

(A revised pricing schedule will be uploaded to replace the current one.)

The evaluation section states that the Government will calculate the six-month FAR 52.217-8 evaluation amount by dividing the most recent option-year amount by two. No Offerors shall alter the pricing schedule. (The Government will calculate the six-month extension under FAR 52.217-8.)

34
RFO 52.212-1, Para. I.E, Volume 2 Technical
The Volume 2 font entry reads “Times New Roman; Size” with no point size stated. Please confirm the minimum font size, margin or page-size requirements, and whether a cover page, table of contents, or cover letter counts toward the 10-page limit.
Volume 2 must be formatted in accordance with the following instructions:

· Font Type: Times New Roman

· Font Size: 12-point font (standard body text)

· Page Size: Standard 8 ½ x 11 inch pages

· Margins: There are no specific margin requirements; however, text must be clearly legible and presented in standard portrait orientation (tables or charts may use landscape if necessary).

· Page Limit: 10 pages maximum (excluding cover page, table of contents, and cover letter).

35
Attachment 5, Question and Answer Form; Attachment 1, SOW Para. 1 and Table 1
The Attachment 5 form posted on SAM.gov contains questions that appear to concern another requirement, including wet-chemical fire-suppression systems, a 16-system count, hydrostatic testing, fusible-link replacement, and an emergency or after-hours CLIN. Please confirm the scope of FA483027Q0004.
The SOW defines this requirement as cleaning kitchen hoods and duct systems in accordance with NFPA 96, paragraph 12.6. The cleaning scope includes hoods, ducts, vents, fans, louvers, filters, and related exhaust surfaces. The SOW does not establish a separate scope for routine fire-suppression inspection, testing, hydrostatic testing, or recharge, except for the contractor’s responsibility for a discharge caused by the contractor.

(The current verbiage shall be removed)

36
SF 1449 Special Contract Requirements, Para. 1; Attachment 7
The 12 November 2026 site visit has passed. Will the Government permit a follow-up site visit or provide photographs of the hoods, duct access panels, and roof fans at the main base and Grassy Pond before the 24 November 2026 quotation due date? If so, please describe the base-pass request process and lead time.
The solicitation provided for a site visit on 12 November 2026 and required Attachment 7, Base Pass Request, to be submitted by 2:00 p.m. EST on 10 November 2026 for that visit. The documents provided do not address a follow-up site visit, photographs, or a revised base-pass request process. Any additional access opportunity would require Government direction.
37
Attachment 1, SOW Para. 4.3, Work Hours
The SOW states that work should be accomplished between 7:00 a.m. and 5:00 p.m., Monday through Friday, and coordinated to avoid disrupting food preparation. Is after-hours or weekend cleaning permitted when requested by a facility, and is that work included in the firm-fixed unit price for each CLIN?
The SOW states that work should be performed from 7:00 a.m. to 5:00 p.m., Monday through Friday. If work cannot be accomplished during those hours, the contractor will be provided facility POC phone numbers and shall coordinate the schedule to minimize disruption to food preparation; some facilities may require one hood to be cleaned at a time. The provided documents do not expressly address weekend work or separate pricing for after-hours work.
38
Attachment 3, Wage Determination 2015-4493 Rev. 33
Does the Government have a preferred Service Contract Act occupation for kitchen hood and duct cleaning technicians? Please also confirm whether Wage Determination 2015-4493 Rev. 33 is the only wage determination that applies, including at Grassy Pond.
Wage Determination 2015-4493 Rev. 33, dated 27 August 2026 included as Attachment 3, is the preferred and only. Wage Determination which also includes the Grassy Pond location.

QUESTIONS & ANSWERS – Vent Hood Services

RFQFA483027Q0004

Attachment 4

File details come from the government source that posted it. Updated .