Questions_and_Answers_17_Aug_2017.pdf

PDF 37 KB Posted

Attached to
Simplified Acquisition for Base Engineering Requirements Federal contract opportunity
Solicitation number
FA4830-16-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Questions and Answers #2

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition for Base Engineering Requirements, newest first.
File Type Posted
Questions_and_Answers_28_Aug_2017.pdf PDF
Questions_and_Answers_11_Aug_2017.pdf PDF
SABER_Site_Visit_Attendence_Sheet_1_Aug_17.pdf PDF
Attachment_8B_SAMPLE_PROJECT_QSEU_99-0408_Add_Repair_Kennel_As_Builts.pdf PDF
Attachment_5_AF_Form_66.xls XLS spreadsheet
Attachment_2_Moody_Air_Force_Base_Architecture_and_Engineering_Design_Guide.pdf PDF
Lowndes_Heavy_Wage_Determination.pdf PDF
Attachment_4_B_Air_Force_Category_Codes_.pdf PDF
Attachment_11_Base_Pass_Request_Form_.pdf PDF
Attachment_9_SF_LLL_Lobbying_Disclosure.doc DOC document
Attachment_8D_SAMPLE_PROJECT_QSEU_83-0096_Canine_Kennels_As_Builts.pdf PDF
Highlands_Building_Wage_Determination.pdf PDF
Attachment_12_Questions_Form.doc DOC document
Highlands_Heavy_Wage_Determination.pdf PDF
Attachment_6_Waste_Management_Report_.xls XLS spreadsheet
FA483016R0004_SABER_Solicitation.pdf PDF
Highlands_Highway_Wage_Determination.pdf PDF
Colquitt_Building_Wage_Determination.pdf PDF
Attachment_10_Contractor_Information.doc DOC document
Attachment_4_A_DD_Form_1354.pdf PDF
Polk_Highway_Wage_Determination.pdf PDF
Colquitt_Heavy_Wage_Determination.pdf PDF
Lowndes_Highway_Wage_Determination.pdf PDF
Attachment_3_SABER_Specifications.pdf PDF
Polk_Heavy_Wage_Determination.pdf PDF
Attachment_8C_SAMPLE_PROJECT_QSEU_95-0262_Pavement_At_Kennels_As_Builts.pdf PDF
Attachment_1_B_MDY_03-05_Non_Appropriated_Fund_.docx DOCX document
Attachment_1_A_Section_B,_Pricing_Schedule.xlsx XLSX spreadsheet
Polk_Building_Wage_Determination.pdf PDF
Attachment_8A_SAMPLE_PROJECT_Statement_of_Objectives_.pdf PDF
Colquitt_Highway_Wage_Determination.pdf PDF
Lowndes_Building_Wage_Determination.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

***The answers in this document do not change the solicitation unless reflected in an amendment. ***

11 August 2017

FA4830-16-R-0004

Simplified Acquisition Base Engineer Requirements (SABER)

Questions and Answers 2

1.

Reference: Attachment 8A page 1 paragraph 1.

Question: Can an as-built paving plan including Bldg. 1708 be provided? Attachment 8C of the SOO only shows Bldgs. 1700 and 1703.

Answer: Yes, the drawing provided at Attachment 8C is the as-built paving plan for Bldg. 1708. The drawing provided shows Bldg. 1700 before it was enlarged and became Bldg. 1708.

2.

Reference: Attachment 8A page 2 paragraph 11 and 12.

Question: Is MWD exercise and break area, items #11 and #12 of the SOO to be indoors and conditioned space or outdoor fenced enclosure?

Answer: The MWD Exercise Area and Break Area will be covered outdoors fenced enclosures.

3.

Reference: Attachment 8A page 1 paragraph 1.

Question: Is Kennel Master Office SOO item #1 to be new or can existing office #103 be re-used for this purpose?

Answer: The Kennel Master Office will be new office space. All requirements in the SOO are new space requirements.

4.

Reference: Attachment 8A .

Question: Is new addition to have separate entrance or is access to be by existing main entrance?

Answer: The new addition should have a separate entrance.

5.

Reference: Attachment 8A.

Question: Can existing rooms 104 and 105 be re-purposed as part of the new addition and can access to the new addition be through either room?

Answer: Rooms 104 and 105 cannot be repurposed. All requirements in the SOO are new space requirements.

6.

Reference: Attachment 8A page 2 paragraph 5.

Question: Are new storage and tack rooms noted on SOO in addition to existing rooms 106 and 107? Can rooms 106 and 107 be re-purposed as part of the remodel/addition?

Answer: New storage and tack rooms are new requirements; rooms 106 and 107 cannot be repurposed.

7.

Reference: Attachment 8A page 2 paragraph 9.

***The answers in this document do not change the solicitation unless reflected in an amendment. ***

11 August 2017

Question: Are existing rooms 109 and 110 to have plumbing removed and rooms re-purposed based on addition of new latrine/shower facilities in addition?

Answer: There is not a requirement to remove the plumbing or re-purpose rooms 109 and 110.

8.

Reference: Attachment 8A page 2 paragraph 11 and 12.

Question: Are SOO items #11 and #12 to be connected to kennel access doors by fenced enclosure or are they stand alone within the overall fenced area beside and behind building?

Answer: SOO item #11 Exercise Area and item #12 MWD Break Area will be stand-alone enclosures.

9.

Reference: Attachment 8A page 2 paragraph 11 and 12.

Question: What type of surface is required for items #11 and #12 in the SOO? Asphalt, concrete, grass, synthetic turf? If asphalt or concrete is a sealant/coating required?

Answer: Surface of the Exercise Area and Break Area will be grass.

10.

Reference: Attachment 8A page 2 paragraph 11 and 12.

Question: Is a hose bibb required adjacent or near SOO items #11 and #12?

Answer: Yes, account for hose bibbs in the Exercise Area and Break Area.