Questions and Answers #2
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
***The answers in this document do not change the solicitation unless reflected in an amendment. ***
11 August 2017
FA4830-16-R-0004
Simplified Acquisition Base Engineer Requirements (SABER)
Questions and Answers 2
1.
Reference: Attachment 8A page 1 paragraph 1.
Question: Can an as-built paving plan including Bldg. 1708 be provided? Attachment 8C of the SOO only shows Bldgs. 1700 and 1703.
Answer: Yes, the drawing provided at Attachment 8C is the as-built paving plan for Bldg. 1708. The drawing provided shows Bldg. 1700 before it was enlarged and became Bldg. 1708.
2.
Reference: Attachment 8A page 2 paragraph 11 and 12.
Question: Is MWD exercise and break area, items #11 and #12 of the SOO to be indoors and conditioned space or outdoor fenced enclosure?
Answer: The MWD Exercise Area and Break Area will be covered outdoors fenced enclosures.
3.
Reference: Attachment 8A page 1 paragraph 1.
Question: Is Kennel Master Office SOO item #1 to be new or can existing office #103 be re-used for this purpose?
Answer: The Kennel Master Office will be new office space. All requirements in the SOO are new space requirements.
4.
Reference: Attachment 8A .
Question: Is new addition to have separate entrance or is access to be by existing main entrance?
Answer: The new addition should have a separate entrance.
5.
Reference: Attachment 8A.
Question: Can existing rooms 104 and 105 be re-purposed as part of the new addition and can access to the new addition be through either room?
Answer: Rooms 104 and 105 cannot be repurposed. All requirements in the SOO are new space requirements.
6.
Reference: Attachment 8A page 2 paragraph 5.
Question: Are new storage and tack rooms noted on SOO in addition to existing rooms 106 and 107? Can rooms 106 and 107 be re-purposed as part of the remodel/addition?
Answer: New storage and tack rooms are new requirements; rooms 106 and 107 cannot be repurposed.
7.
Reference: Attachment 8A page 2 paragraph 9.
***The answers in this document do not change the solicitation unless reflected in an amendment. ***
11 August 2017
Question: Are existing rooms 109 and 110 to have plumbing removed and rooms re-purposed based on addition of new latrine/shower facilities in addition?
Answer: There is not a requirement to remove the plumbing or re-purpose rooms 109 and 110.
8.
Reference: Attachment 8A page 2 paragraph 11 and 12.
Question: Are SOO items #11 and #12 to be connected to kennel access doors by fenced enclosure or are they stand alone within the overall fenced area beside and behind building?
Answer: SOO item #11 Exercise Area and item #12 MWD Break Area will be stand-alone enclosures.
9.
Reference: Attachment 8A page 2 paragraph 11 and 12.
Question: What type of surface is required for items #11 and #12 in the SOO? Asphalt, concrete, grass, synthetic turf? If asphalt or concrete is a sealant/coating required?
Answer: Surface of the Exercise Area and Break Area will be grass.
10.
Reference: Attachment 8A page 2 paragraph 11 and 12.
Question: Is a hose bibb required adjacent or near SOO items #11 and #12?
Answer: Yes, account for hose bibbs in the Exercise Area and Break Area.