Attachment_6_Waste_Management_Report_.xls

XLS spreadsheet 38 KB Posted

Attached to
Simplified Acquisition for Base Engineering Requirements Federal contract opportunity
Solicitation number
FA4830-16-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 6 Waste Management Report

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition for Base Engineering Requirements, newest first.
File Type Posted
Questions_and_Answers_28_Aug_2017.pdf PDF
Questions_and_Answers_17_Aug_2017.pdf PDF
Questions_and_Answers_11_Aug_2017.pdf PDF
SABER_Site_Visit_Attendence_Sheet_1_Aug_17.pdf PDF
Attachment_8B_SAMPLE_PROJECT_QSEU_99-0408_Add_Repair_Kennel_As_Builts.pdf PDF
Attachment_8D_SAMPLE_PROJECT_QSEU_83-0096_Canine_Kennels_As_Builts.pdf PDF
Highlands_Building_Wage_Determination.pdf PDF
Attachment_12_Questions_Form.doc DOC document
Highlands_Heavy_Wage_Determination.pdf PDF
Attachment_5_AF_Form_66.xls XLS spreadsheet
Attachment_2_Moody_Air_Force_Base_Architecture_and_Engineering_Design_Guide.pdf PDF
Lowndes_Heavy_Wage_Determination.pdf PDF
Attachment_4_B_Air_Force_Category_Codes_.pdf PDF
Attachment_11_Base_Pass_Request_Form_.pdf PDF
Attachment_9_SF_LLL_Lobbying_Disclosure.doc DOC document
FA483016R0004_SABER_Solicitation.pdf PDF
Highlands_Highway_Wage_Determination.pdf PDF
Colquitt_Building_Wage_Determination.pdf PDF
Attachment_10_Contractor_Information.doc DOC document
Attachment_4_A_DD_Form_1354.pdf PDF
Polk_Highway_Wage_Determination.pdf PDF
Colquitt_Heavy_Wage_Determination.pdf PDF
Lowndes_Highway_Wage_Determination.pdf PDF
Attachment_3_SABER_Specifications.pdf PDF
Polk_Heavy_Wage_Determination.pdf PDF
Attachment_8C_SAMPLE_PROJECT_QSEU_95-0262_Pavement_At_Kennels_As_Builts.pdf PDF
Attachment_1_B_MDY_03-05_Non_Appropriated_Fund_.docx DOCX document
Attachment_1_A_Section_B,_Pricing_Schedule.xlsx XLSX spreadsheet
Polk_Building_Wage_Determination.pdf PDF
Attachment_8A_SAMPLE_PROJECT_Statement_of_Objectives_.pdf PDF
Colquitt_Highway_Wage_Determination.pdf PDF
Lowndes_Building_Wage_Determination.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Waste Management Report
I. Total Project Waste
Total cost of disposal,From:
Quantity (tons)Landfill SiteTip fee/tonincluding hauling,Total cost/tonProject:QSEU
container rental, tip feesDate:
FA4830-
II. Alternatives to Landfilling
Type of MaterialQuantityDestination andCost toExpected revenueNetCost ifComparison
(tons)means of transportationhandle and transport& tip fee earningscostlandfilledcost (+) / savings (-)
Examples
Cardboard
Dimensional wood
Beverage containers
Land debris
Concrete
CMU
Asphalt
Metals - all types
Gypsum board
Paint
Carpet
Insulation
Glass
Cast stone
Wood materials
Electric cable
PVC piping
Rubber flooring
Raised flooring
III. Total net cost (+) or savings (_) from all
alternatives to landfilling all project waste
INSTRUCTIONS: Contractors will track and maintain records of materials utilized that contain recycled materials and data for debris that was recycled/removed from the demolition waste stream. The completed form will be submitted to the contracting officer in the contract closeout process.
REFERENCES: Contract clause 52.223-4 and 9; FAR 23 part 4; EPA CPG (EPA Website: EPA.gov); Resource Conservation Recovery Act (RCRA); Executive Order 13101; DoD Green Procurement Strategy (Green Purchasing Program - GPP)

&LFA483016R0004 Attachment 6

Sheet2

Sheet3

File details come from the government source that posted it. Updated .