This is a Questions and Answers (Q&A) document for the CATM Range Cleaning solicitation (FA481926Q0054) issued by the 325th Contracting Squadron at Tyndall Air Force Base, Florida, supporting the 325th Security Forces Squadron. The document addresses 47 questions and clarifications regarding scope, technical specifications, waste management, and operational requirements for cleaning and maintaining an indoor firing range facility.
The scope requires monthly, quarterly, and annual maintenance of a 9,856 square-foot indoor firing range, including lead-residue removal from approximately 175,000 rounds fired annually (9mm/5.56 frangible rounds only). Key technical requirements include monthly replacement of Stage 1 pre-filters (CAMfil/FAR 30/30, Part 049880-005, 24x24x2, MERV 8), quarterly replacement of Stage 2 bag filters (CAMfil/HFSRMV14, Part 406280A30, MERV 14), and annual replacement of Stage 3 HEPA filters (CAMfil/855016004, 24x24x12, true HEPA). The contractor must replace 32 of each filter type quarterly and service the Action Target Total Containment Trap (approximately 76 feet long and 18 feet wide). Personnel performing lead-residue removal and HEPA filter changes must complete training meeting 40 CFR 262.17(a)(7) standards, though specific certifications need not be submitted until prior to contract performance. The contractor must provide hazardous waste disposal containers (not government-supplied), coordinate waste characterization and disposal with base hazardous materials personnel at Building 6011 with 10 business days' advance notice, and comply with OSHA 29 CFR 1926.62 for personal air monitoring. The range floor dimensions are approximately 79 feet from bullet trap to firing line and 16.5 feet from firing line to rear wall. Ceiling baffle cleaning and wet-washing are excluded from scope. This is a 100% Small Business Set-Aside with NAICS code 562211 (Hazardous Waste Treatment and Disposal) and PSC code F108 (Environmental Systems Protection—Environmental Remediation).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Questions | Responses |
| What is the current contract value for this service annually? | there is no current contract for this service |
| Could you please confirm the total square footage of the indoor firing range area covered under this contract? | 9,856 Sq ft |
| Who is the current or previous incumbent? | none |
| What is the current or previous contract number? | n/a |
| What is the current or previous value of the contract? | n/a |
| What specific certification is required for personnel performing lead-residue removal and HEPA filter changes? | The Government does not mandate a specific branded certification or specific certifying organization. Any training program that meets the standards of 40 CFR 262.17(a)(7) is acceptable. To satisfy this requirement, personnel must successfully complete a program consisting of classroom instruction, online training (e.g., computer-based or electronic), or on-the-job training that teaches them to perform their duties in compliance with hazardous waste regulations. |
| Are copies of the applicable certifications/training certificates required with the initial quote, or are they only required for approval prior to contract performance? | Training certificates and proof of compliant training programs are only required to be submitted to the Contracting Officer for approval prior to the start of work (performance). They do not need to be submitted with your initial quote. |
| What is the overall width of the bullet trap? | The bullet trap is approx. 76’ long and 18’ wide |
| Who is the manufacturer of the Total Containment Trap Vortex / Vortex Deceleration Chamber? | The Total Containment Trap Vortex / Vortex Deceleration Chamber are manufactured by Action Target |
| Approximately how many rounds are fired at the range annually? | Approx 175,000 (9mm/5.56) rounds are fired at the range annually. |
| What floor of Building 1266M is the firing range located on? | B1266M is a single-story facility |
| Are there any stairs, elevators, ramps, or other access considerations for bringing equipment and supplies into and out of the range? | No, there no stairs, elevators, ramps, or other access considerations for bringing equipment and supplies into and out of the range, however, a ladder will be required to access the filters on the Dust Collector and filters on the ventilation system. |
| Where is the Carey’s ventilation system/filter bank located? Is it located inside the building, in a mechanical room, on the roof, or elsewhere? | The Carey’s ventilation system and filter banks are located outside, behind the range. The area is fenced off but not locked. |
| Are there any special access requirements for servicing the ventilation system, such as ladders, lifts, roof access, or confined access? | A ladder will be required to access the filters on the Dust Collector and filters on the ventilation system. |
| Can you provide the manufacturer and model information for the Carey’s ventilation system and filter assemblies? The SOW provides filter quantities and sizes but does not appear to provide specific filter part numbers. | The manufacturer and model Carey’s ventilation system: |
Filter information: See attached Can you clarify the filter replacement requirements? The SOW lists monthly, quarterly, and annual filter replacements but also states that filters are to be inspected and changed as needed based on the contractor's recommendation and Buyer authorization. Should pricing include replacement of all listed filters at every stated interval, or should filters be priced/replaced only when authorized? A: The filter replacement requirements are:
Stage 1/monthly Stage 2/Quarterly Stage 3 HEPA Filters, DCU Primary/Secondary and Pamic CAMFil Pre-filter Annually
| Are background checks or any additional security screenings required for contractor personnel beyond the pass, identification, DBIDS, and CAC requirements identified in the solicitation/SOW? | No (that we are aware of) background checks or additional security screenings are required for contractor personnel beyond the pass, identification, DBIDS, and CAC requirements identified in the solicitation/SOW? |
| Are we responsible for recycling the lead and other recovered projectile material? If so, who retains the recycling proceeds/credit? | No; Contractor is responsibel for coordinating with TAFB Haz Material Waste for proper disposal. See Q&A 20 |
| Are we responsible for removing and disposing of all hazardous waste generated during the range cleaning and filter changes, or will Tyndall AFB handle the final disposal? | according to the PWS in section 4.3 it is clarified that they will transport the waste to building 6011 (the base 90 day facility) but must coordinate 10 business days in advance to ensure that personnel is available to receive the waste. |
| in the SOW under 4.2.2 it mentions 2 High-capacity HEPA filters and a pamic filter. What are the sizes of those filters? | High-capacity HEPA filter: Pamic Filter: Outer diameter 2.25 inches x Length 4.25" |
| Please provide the overall range dimensions (length × width × height) for cleaning and pricing purposes. We also need the dimensions of the space between the bullet trap and the wall behind the ready area, as well as the accessible area behind the trap. If available, please provide trap drawings or photographs. | See Q&A 9 |
| Section 4.2.2 requires quarterly replacement of the DCU primary, secondary, and pre-filters. These filters are typically replaced annually and are costly. Other Government projects involving Action Target TCTs and DCUs generally require annual replacement. Does the Government still require these filters to be replaced quarterly? | A: The filter replacement requirements are: |
Stage 1/monthly Stage 2/Quarterly Stage 3 HEPA Filters, DCU Primary/Secondary and Pamic CAMFil Pre-filter/ Annually
| Please provide the manufacturer and model/part numbers for the exhaust HEPA filters listed in the SOW. We need to confirm whether they are square box, header-style, or V-bank filters. | Stage 1: CAMfil/FAR 30/30 Part: 049880-005 24 x 24 x 2 Stage 2: CAMfil/HFSRMV14/24/24/30/10 Part:406280A30 Stage 3: CAMfil/855016004 24x24x12 |
| Please provide the sizes, manufacturers, and model/part numbers for the DCU primary, secondary, HEPA, and Pamic filters. If this information is unavailable, a clear photograph of the DCU equipment nameplate would allow Camfil to identify the correct filters. | See photograph of name plate on the DCU in Attachment 1 |
| Does the Government require the ceiling baffles to be cleaned annually, or are they excluded from the cleaning scope? | Exclude from the cleaning scope |
| Does the Government require the range floor to be wet-washed annually or quarterly? This service is commonly performed in tactical ranges after training operations are completed. | TAFB Firing Range is not a "TACTICAL Range". |
| The current solicitation is missing several critical details that affect both the cost of services and the overall performance of the HVAC system if incorrect equipment is installed. Please provide the following prior to the close of bid: |
1. Carey Unit – Model number required.
2. Pre-filters (Qty: 32, 24" x 24" x 2") – Part number and MERV rating required.
3. 10-Pocket Bag Filters (Qty: 32, 24" x 24" x 18") – Part number and MERV rating required.
4. HEPA Filters (Qty: 32, 24" x 24" x 12") – Part number and MERV rating required. 1. Carey Unit – Model number required.
2. Pre-filters (Qty: 32, 24" x 24" x 2") – Part: 049880-005 MERV8.
3. 10-Pocket Bag Filters (Qty: 32, 24" x 24" x 18") – Part:406280A30 MERV14.
4. HEPA Filters (Qty: 32, 24" x 24" x 12") – Part: 855016004 MERV (no MERV rating as it is a "true HEPA" filter).
Note: The MERV rating (Minimum Efficiency Reporting Value) is critical, as it determines how effectively a filter captures microscopic particles and how much it restricts airflow through the heating and cooling system.
5. DCU – Camfil manufactures multiple sizes and types of DCUs; please specify the model applicable to this unit.
6. Primary Filters (Qty: 4, Hemi-Pleat Extreme Green) – Part number required, as these are available in multiple sizes.
7. Secondary Filters (Qty: 2, High-Capacity HEPA) – Part number required, as these are available in multiple sizes.
8. Panic Filter – Part number required, as it is available in multiple sizes. 5. DCU – See Attachment 1.
6. Primary Filters (Qty: 4, Hemi-Pleat Extreme Green) – PN: 235276014 39" H x 15"OD Merv 15.
7. Secondary Filters (Qty: 2, High-Capacity HEPA) –(no MERV rating as it is a "true HEPA" filter) PN: 855211367
8. Pamic Filter – Part number required, as it is available in multiple sizes. PN: 084404000
| Aleut requests consideration of a 2 week extension in order to allow adequate time to collect pricing and review responses to submitted questions. | No |
| Are spent cases and projectiles from this project approved for inclusion in the base recycled metals program? If not, does the base have a preferred recycler for this material? | N/A |
| Who is responsible for performing waste characterization? If the contractor, what are the requirements for performing waste characterization (magnitude, extent, quality)? | Vendor must cordinate with 325 CES/CEIEC HWAS personnel IAW section 4.3 of the SOW |
| Who is responsible for shipment and disposal of hazardous wastes generated from this activity? | Vendor must cordinate with 325 CES/CEIEC HWAS personnel IAW section 4.3 of the SOW |
| Where are wastes stored pending characterization? | Vendor must cordinate with 325 CES/CEIEC HWAS personnel IAW section 4.3 of the SOW |
| Where are wastes stored pending shipment and disposal? | Vendor must cordinate with 325 CES/CEIEC HWAS personnel IAW section 4.3 of the SOW |
| Are there any specific RCRA permit provisions for establishing a waste accumulation area at the range pending transfer to an onsite storage facility? If so, please provide. | Vendor must cordinate with 325 CES/CEIEC HWAS personnel IAW section 4.3 of the SOW |
| Does the base have preferred waste containers (e.g., drums, soft sided containers) | Vendor must cordinate with 325 CES/CEIEC HWAS personnel IAW section 4.3 of the SOW |
| Is there historical data on the performance of the ventilation system? How often were adjustments made previously? | No, there is no historical data on the performance of the ventilation system |
| Can any industrial hygiene air sampling data be provided? | See last report from BIO |
| Can the site provide a quarterly round count so we can estimate the quantity of lead on hand? | 175,000 annually divided by 4: 43,750 rds per quarter. NOTE: Only frangible rounds are fired on this range. |
| What are the requirements for generation of manifests for transportation of hazardous wastes? | See Section 7 of the SOW |
| Can dimensioned drawings be provided in order to estimate the size of the building and internal components? | YES Refer to Range blueprint pdf |
| Will the GOV provide the disposal barrels Bullets and a replacement barrel for the DCU. If not, how many barrels are expected each quarter? | NO, the GOV will not provide the disposal barrels (28) and a replacement barrel (1) for the DCU. |
| Section 4.3 indicated that the bullets and the dust shall be segregated into DOT approved containers; however, in 4.2.2 it states that the bullets will be placed in the DCU 55 gal drum? Please clarify. | The "bullets" and the dust shall be segregated into DOT approved containers (not provided by the GOV). Barrels will be transported to building 6011 (the base 90 day facility) but must coordinate 10 business days in advance to ensure that personnel is available to receive the waste. |
| Please clarify from 4.2.2: "Note on Filters: All filters shall be inspected by the contractor, and upon their technical recommendation, will be approved for changing as needed and as authorized by the Buyer." Does this indicate that the filters will be changed when they get out of spec or once a year, if needed? | This should be changed IAW Q&A 28 and 29 |
| Could you provide a picture of the front and back of the range inside the building? | YES |
| Will the Base Haz team pick up the barrels due to their weight? Typically on other AFB ranges we have worked with this identical system, we have packaged the barrels on pallets and the Haz Team has picked them up. We took all other waste items to the Haz facility. | Refer to Q&A 20 |
| What is the address of the HWAS? | Building 6011 TAFB FL 32403 |
| What is the width of the Bullet trap/range floor? | Refer to Q&A 9 |
| Will the contractor be required to move on public roads to deliver the hazardous waste to the HWAS? | Depends..Route can be through TAFB, using the underpass without departing the base. If departing the southside (Range location) travel on public road (HWY98) will be required. |
| What is the length of the range floor (from bullet trap to firing line)? | Approx 79 feet |
| What is the length behind the firing line to rear wall? | Approx 16.5 feet |
| The Quarterly Maintenance requirements direct the Contractor to remove the twenty-eight (28) bullet collection barrels and consolidate their contents into the provided DCU 55-gallon drum. The Annual Maintenance requirements subsequently reference handling/disposal of “bullet waste and hazardous lead materials,”. Please clarify the intended disposition of recovered projectiles/bullets. Specifically, after consolidation into the provided DCU 55-gallon drum, are recovered projectiles to remain Government property for Government-managed recycling/disposition, or is the Contractor responsible for removal, recycling, or disposal of this material? | The "bullets" and the dust shall be segregated into DOT approved containers (not provided by the GOV). Barrels will be transported to building 6011 (the base 90 day facility) but must coordinate 10 business days in advance to ensure that personnel is available to receive the waste. |
| Please confirm whether the annual requirement for “comprehensive commercial steel trap residue cleaning” includes internal cleaning of the Vortex Deceleration Chamber, or identify any portions of the trap system excluded from this requirement. | No Answer |
| Please clarify the required scope of contractor-provided personal air monitoring, including whether monitoring is required during each monthly, quarterly, and annual service, or a single “initial” evaluation. Please provide the anticipated number of personnel/samples, and whether laboratory analysis/results must be submitted to the Government. | NO specific number. As long as it complies with OSHA 29 CFR 1926.62 |
File details come from the government source that posted it. Updated .