RFI Log 2.pdf

PDF 157 KB Posted

Attached to
Repair CEMIRT Facilities Federal contract opportunity
Solicitation number
FA481921R0032
Issued by
Department of the Air Force Air Combat Command

About this file

This request for information log and related federal contract opportunity involve repairs to CEMIRT facilities at Tyndall Air Force Base in Florida. The log contains responses to contractor questions about building features, hazardous materials, fire protection requirements, and clarifications around scope items like HVAC and controls work. The related solicitation seeks proposals to provide repairs per the log and attachments by 3 August 2021. Key work includes renovations to building 1134 including new offices and breakroom, building 1142 modifications like new doors, and connecting buildings 1141 and 1144 with an overhead structure. Bidders should review provided documents thoroughly and direct additional questions to the contracting officer prior to submitting proposals. The selected contractor will be responsible for negotiating subcontract work with the local utility GCEC and providing a licensed fire protection engineer for the duration of the project.

View the file

Other files for this federal contract opportunity

Other files attached to Repair CEMIRT Facilities, newest first.
File Type Posted
Amendment FA481921R00320006 SF 30.pdf PDF
Attachment 1 FA481921R0032 Statement of Work.pdf PDF
Attachment 20 FRCS-AppendixL.pdf PDF
Amendment FA481921R00320005 SF 30.pdf PDF
Attachment 5 1st MOD BLDG 1134 -- Rev A.pdf PDF
Attachment 8 Bldg 1142 (autocad2010) 3-20-18 FS-2 SIGNED.pdf PDF
Attachment 9 C-1.pdf PDF
Attachment 15 Tyndall_1134_1-ARCH C - 2 Oct 17.pdf PDF
Attachment 19 B1134 As Builts.pdf PDF
Attachment 1 FA481921R0032 Statement of Work.pdf PDF
Attachment 2 Wage Determination FL20210105.pdf PDF
Attachment 13 fire plug location.pdf PDF
Attachment 6 2nd MOD BLDG 1134 -- Rev A.pdf PDF
Amendment FA481921R00320004 SF 30.pdf PDF
Attachment 12 A-1.pdf PDF
Attachment 14 Tyndall 1142 Civil DSGN 3.pdf PDF
Attachment 4 Base Access Request Form.xlsx XLSX spreadsheet
Attachment 18 Tyndall_1134_2-Basic Svc - Eff FY10.pdf PDF
Attachment 11 E-1.pdf PDF
RFI Log.pdf PDF
Attachment 7 Bldg 1142 (autocad2010) 3-20-18 FS-1 SIGNED.pdf PDF
Attachment 16 Tyndall_1134_1-Basic Svc - Eff FY10.pdf PDF
Attachment 10 CEMIRT Fire Sprinkler Report 2020.pdf PDF
Attachment 3 Sample RFI.PDF PDF
Attachment 17 Tyndall_1134_2-ARCH C - 2 Oct 17.pdf PDF
Amendment FA481921R00320003 SF 30.pdf PDF
Attachment 6 2nd MOD BLDG 1134 -- Rev A.pdf PDF
Attachment 5 1st MOD BLDG 1134 -- Rev A.pdf PDF
Amendment FA481921R00320002 SF 30.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Amendment FA481921R00320001 SF 30.pdf PDF
Attachment 3 Sample RFI.PDF PDF
Solicitation - FA481921R0032.pdf PDF
Attachment 2 Wage Determination FL20210105.pdf PDF
Attachment 4 Base Access Request Form.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Question

1 Is there use, dispensing, or handling of flammable or combustible liquids in building 1134?

Please provide the hydraulic calculations for building 1142 sprinkler design to verify adequate reductions were taken for backflow preventers and fittings as there is only a 4 psi safety factor. This is necessary to confidently exclude a fire pump.

3 Is 1134 used for the parking, storage, or repair of motor vehicles?

Is there any fueling or dispensing of compressed natural gas or liquefied natural gas vehicles or vessels in building 1134?

Is there any hazardous materials storage or use in Bldg 1134? If yes, please provide hazardous classification, locations of storage, and maximum quantities to ensure design complies with fire and building code requirements IAW UFC 3‐600‐01.

IAW UFC 3‐600‐01, The DFPE must determine the commodity classification and maximum storage height and include this information in the contract documents when this information differs from the minimum noted in the section on "Warehouse and Storage Facilities" in this UFC. Please provide this information for the storage located under the mezzanine in building 1134 as well as for the storage in building 1142 in order to ensure the design criteria for these areas has been properly selected and applied.

RFI responses indicate to review drawings for locations of very early warning fire detection devices.

No areas are noted on the drawings indicating any very early warning devices. Please confirm there are no such areas.

Deficiency reports for 1141 and 1144 do not indicate if the fire sprinkler protection is adequate for the facility use/hazard. Is it the intention that only the specific deficiencies identified in the reports provided be corrected or is it the intention that the sprinkler system be assessed to ensure it’s appropriately designed. If the intention is to assess adequacy of existing sprinkler protection for these two buildings, please provide as‐built drawings. Also please provide information on any storage areas including storage height, storage arrangement and commodity classification IAW UFC

3‐600‐01

Can the electric utility be considered a “reliable power source” in accordance with UFC 3‐600‐01

Section 9.5.4.2?

Please provide direct links to documents or document pdfs as requested, instead of a link to a website with unclear direction and summaries.

Please provide electrical drawings for building 1134 to include lighting layouts and panel locations and schedules.

12 Is Siemens required to install Fire Alarm/MNS?

Is Siemens required to install new HVAC controls? If so, please confirm the requirements for controls outside of interface with the FA/MNS. Is AT/FP protection as it peratins to the BAS required?

If Siemens is sole sourced for the Fire Alarm/MNS and controls, please consider revising the bid schedule and providing the Siemens pricing for this project as a funded CLIN.

If each contractor is required to subcontract to GCEC for modifications to the plumbing in Building 1142 and the installation of compound fire hydrants, please consider revising the bid schedule and providing the GCEC pricing for this project as a funded CLIN.

Refer to RFI response 34.The response to the location on the new elevator was: See Drawings. The drawings/attachments provided do not show the location of the elevator. Please clarify.

Refer to revised SOW Page 17 of 40 INTERIOR. It states the new elevator location will be in the front entrance area of Bldg 1134. Is the elevator to be installed inside the Reception Area Room 102 as shown on Attachment 5 1st MOD Bld? Please clarify.

18 Will Building 1134 be unoccupied during construction?

Refer to Attachment 6. Will all the new walls for the new offices and breakroom go to the deck or will they be same height as the existing modular walls. Please clarify.

Refer to 1st floor building 1134. Will the expanded conference room require new flooring after the wall is removed?

Refer Building 1134 2nd Floor. Will any new finishes be required in the remaining offices, restroom and mechanical room?

Refer the revised SOW Page 17 of 40 Bldg 1134 INTERIOR. It states windows shall be 3'X4'. In RFI 39 the question was asked: Will the new walls have any windows into the bay area. Response: See Conceptual drawings. Attachment 6 conceptual drawing dose not indicate any windows. Will any be required?

Refer to revised SOW Page 18 of 40 5.4. Building 1142 Modifications INTERIOR: This states some of the interior bollards may need to be removed for the new doors. All exterior bollards will remain.

Attachment 12 A 1 note 3 states: Demo the existing bollards. Bollards shall be cut flush with existing grade. Note 4 states: Install new 6' bollards. Please clarify.

Refer to revised SOW 5.4 Building 1142 Modification-Mechanical. This states the contractor shall construct an exterior mechanical room (8'x6'). What should the height be?

Refer to revised SOW 5.5 Building 1141 and 1144. This states to provide an overhang L58'xW31'x18'H between the two facilities. Will any demolition be required at 1141 and 1144 to accommodate the new overhang?

Standard mechanical room design criteria which houses fire riser equipment

No demo required

Contractor: Wall height criteria based on design determination, i.e roof deck/truss will limit wall height.

Yes, flooring will need to be installed. Existing epoxy flooring coating does not extend under wall that is to be demolished/removed

Only to modifications, to the 2nd floor see drawings.

During site visit, the windows were present and visible on existing office wall. These windows did not over look bay area. New office should have windows located in same general wall area. Must be fire rated to meet Life Safety Codes, i.e size and material

Remove / replace if required to facilitate roll up door installation, recommend additional site visit if needed for measurements, pictures etc.

Siemens fire alarm system components and transceiver equipment are required. It is not required that

Siemens be contracted for design/installation.

The contractor is response for negotiating with GCEC.

Location identified at previous site vist. Suggest new site visit for eyes on location again if necessary.

Outside of 1134…refer to item 16

Building will be occupied during the project.

Yes Reliable Power Source

It is the responsibility of the contractor to be knowledgeable of the material required to perform the project, those locations have been provided.

Everything available has been provided

No, Siemens fire alarm system components and transceiver equipment are required. It is not required that

Siemens be contracted for design/installation.

Yes ‐‐ see 10, response

LP Outside of 1134 wash rack area

None inside bldg

Not applicable to this project.

Only Electrical equipment/batteries are stored under or on mezzanine area

Intention is the sprinkler system be assessed to ensure it’s appropriately designed Modify and upgrade as criteria is determined

FA481921R0032 Repair CEMIRT Facilities RFI Log List 2

Answer

LP dispensing Outside of 1134 (wash rack area)

See Fire Test Reports, and Contact GCEC for Fire Flows

No

Per SOW 1.0, the wind requirements are new. Please provide updated wind rating requirements for exterior items within SOW. Please provide Risk Categories for the buildings within SOW.

Please allow an additional three weeks for proposals to be due after receiving RFI responses and additional documents.

28 Please clarify if hazardous vapors may be encountered in any portion of the project SOW.

Please clarify if the contractor is responsible for updating the entire BAS for the HVAC for all buildings within the SOW. If not, please clarify and specify the Siemens SOW for all buildings.

Please clarify the manufacturer or current systems for the buildings' Fire Alarm and MNS. Is the contractor responsible for converting all Fire Alarm and MNS to Siemens?

31 Please confirm that security and intrusion detection is not part of this SOW.

32 Please specify all Life Safety issues for building 1134.

Please provide an actual document for Tyndall AFB Excellence Plans for base requirements, instead of a website that may be changed without notice.

34 Please provide Mandate for the use of Siemens on TAFB document.

Please confirm that items detailed in the SOW take precedence over Tyndall IFS and base standards. If it does not, then please revise the SOW to match or exceed the IFS and Tyndall Standards, or will the CO approve the standards set in the SOW 1.7. Reference SOW 3.2.

38 Please provide existing for and ceiling manufacturers and models.

Elevator location not shown for Bldg 1134. Building conceptual drawings or as built drawings do not indicate an elevator. Please indicate where the existing elevator is located. If there is no existing elevator, please show where a new elevator must be constructed.

RFI response 51 states to replace all AHU/condensing equipment for building 1134 renovation. RFI response 14 states to reuse existing. Please clarify which is correct.

41 Please clarify where contractor is required to replace interior lighting for all buildings.

GCEC will not furnish pricing information for contractor's bid. Please provide all GCEC pricing to contractors for this SOW. If contractor does not receive pricing for GCEC utility items, then contractor cannot be held liable for additional costs associated with the utility lack of bid participation.

GCEC will not furnish test results or data to contractors. Please provide all required pricing and information from GCEC to contractors for project bid.

All light fixtures should match existing LED style, at least 1 watt per 130 Lumens

Government does not have GCEC pricing or data, the contractor must negotiate with GCEC

Government does not have GCEC pricing or data, the contractor must negotiate with GCEC

See No 10, for guide

The work performed must meet the requirements, see No 10, for guide

See No 10, for guide

No existing elevator. New to be located outside of front entrance bldg 1134

Equipment should be replaced/consolidated to reduce long term maintenance. When they tear down the existing break room and construct the new break room, ensure AC/Heat for the new break room is

Does the current system have capability/capacity to monitor new equipment installed for offices/breakroom area? If not then it should be replaced with new.

Current fire alarm system is analog and would not be reusable. MNS does not exist within any buildings in the scope of work.

S & I not part of SOW

The government doesn't provide a Fire Protection Engineer, the contractor must utilize their own FPE for the project.

See No 10, for guide

See No 10, for guide

Government does not have GCEC pricing or data, the contractor must negotiate with GCEC

N/A

File details come from the government source that posted it. Updated .