Appendix F Drawings.pdf
PDF 17 MB Posted
- Attached to
- FA481921B0003 - Tyndall AFB - Demolition Phase 8 Federal contract opportunity
- Solicitation number
- FA481921B0003
About this file
This solicitation is for demolition services at Tyndall Air Force Base under Solicitation Number FA481921B0003. The acquisition is set aside for 8(a) small businesses with a size standard of $16.5 million. The Air Force seeks offers for demolition work in Phase 8, with bids due by February 23, 2021. Offerors must submit pricing for line items in the provided Demo Phase 8 Pricing Sheet and include bid guarantee documentation. Electronic bids are preferred and have file size limits. Questions are due by February 4th and will be answered in an amendment on SAM.gov. The bid opening will occur on February 23rd at the base.
The solicitation provides instructions for submitting offers for demolition services at Tyndall Air Force Base. Offerors must meet size standards, submit pricing and documentation by the due date, and follow electronic submission requirements. Any questions will be answered in an amendment on SAM.gov prior to bids due on February 23rd.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
SD
FD
FE
C
9' -1
0"
7"
37'-2" 11'-11"
EXISTING
CONCRETE PADS
4' -0
4'-0"
'-0
17'-4"
2 4
OFFICE UNISEX
RESTROOM
49'-9 1/2"
1 1
MEZZANINE IS TO BE INSTALLED
ABOVE THE NEW OFFICES. SEE
SHEET S-1 FOR DETAILS
SHIPS LADDER THAT
LEADS TO MEZZANINE
CONCRETE NOTES
CONCRETE NOTES
#1, #3, #4 & #6
#2, #3 & #7
ROLL UP DOOR
NOTES #1, #2 & #3
CONCRETE NOTE #9
2'
" 41'-8"
FEC
'-5
3'-0"
'-5
14'-5 1/2"
CONCRETE NOTES:
1) INSTALL CONCRETE FORMS FOR NEW DRIVEWAY APRON
2) INSTALL CONCRETE FORMS FOR NEW CONDENSING UNIT
PAD
3) INSTALL, SPREAD, SHAPE, COMPACT & GRADE 12" AGGREGATE
IN 4" LIFTS, LEVEL w/FINISHED GRADE FOR DRIVEWAY APRON
& CONDENSING PAD
4) FURNISH & INSTALL #5 REBAR 12" O.C. ON 4" REBAR CHAIRS
4'-0" O.C. IN DRIVEWAY APRON
5) FURNISH & INSTALL 16"x16" #5 REBAR BASKET FOR 2'x2'
FOOTINGS OF MEZZANINE
6) POUR DRIVEWAY APRON w/4000 PSI CONCRETE w/FIBER
REINFORCING
7) POUR CONDENSING PAD w/3500 PSI CONCRETE & INSTALL 6"x6" WW MESH WITHIN CONDENSER UNIT PAD
8) POUR (4 EA) 2'x2'x3' FOOTING FOR MEZZANINE COLUMNS w/6000 PSI CONCRETE (SEE SHEET S-1)
9) POUR FOOTINGS FOR 6" STEEL PIPE BOLLARDS & FILL
BOLLARDS w/3500 PSI CONCRETE
ROLL UP DOOR NOTES:
1) INSTALL NEW 16'x16' ROLL UP DOOR
2) PLACE 10" METAL CAP VERTICALLY ALONG BOTH SIDES OF
NEWLY INSTALLED ROLL UP DOOR TO COVER SAW CUTTING
3) INSTALL MOTORIZED OPENER
DOORS, FRAMES & HARDWARE NOTES:
1) FURNISH & INSTALL (3 EA) 3070 DOORS & FRAMES w/HARDWARE
2) FURNISH & INSTALL (1 EA) 4070 DOOR & FRAME w/HARDWARE
3) VERIFY SECTION OF WALL @ ROLL UP DOOR LOCATION IS
FILLED & REINFORCED
5/8" GYP. BOARD
TYP. INTERIOR WALL DETAIL
5/8" GYP. BOARD
6" METAL STUD
R19 BATT INSULATION
ROOM FINISH SCHEDULE
ROOM NAME/# FLOORING BASE WALLS CEILING CEILING HEIGHT NOTES
OFFICE 1
UNISEX RESTROOM PTD ACT
EPOXY
EPOXY
4" EPOXY
4" EPOXY
PTD ACT 8'-0"
8'-0"
MEZZANINE 3/4" PLYWD - - - -
DOOR SCHEDULE
DOOR # SIZE FRAME MAT DR MAT'L DOOR TYPE
HM WELD16x16
HM WELD
HM WELD
METAL ROLL-UP
FLUSH
HM WELD HM
HM
16'-0"
FINISH FLOOR
V E
R
IF
Y
A V
H
IG
T
NEW 16'x16' ROLL UP DOOR TYNDALL A.F.B., FL. 32403
SHEET:
PROJ. NO.
SCALE:
DATE:
Sheet Title
DRAWN BY:
DESIGNED BY:
TYNDALL A.F.B., FL. 32403
A-1 1131/4" = 1' - 0"A. BOLING
PROPOSED FLOOR PLAN
B. ROCHA
REPAIR LOGISTICS OFFICE
4 OCT 12
BLDG #274
12-1036
APPROVED PER CE
AS BUILTSB
A 29 OCT 12
6 MAR 13 AAB
AAB
PROPOSED FLOOR PLAN
SCALE: 1/4"=1'-0"
EXTERIOR ELEVATION
SCALE: NTS
8'-8" 14'-0" 41'-10" 3'-2" 9'-8" 14'-0" 8'-8"
100'-0"
51'-10" 3'-2" 5'-0"
60'-0"
325th CIVIL ENGINEERING SQUADRON
DATE: PROJ. NO.
Task Order No.
04-1004
A-2 6 15
ELEVATION PLAN
17 DEC. 03
1/4"=1'-0"D.GILBERT
R.TURPIN
CONST. ENGINE
STORAGE FAC.
B
D
REVISION
2 FEB. 04
24 MAR. 04
25 MAR. 04
6 AUG. 04
D.J.G.
AutoCAD SHX Text
METAL ROOFING
CONCRETE PAD
CONCRETE PAD
SPLIT RIB BLOCK
DOOR
METAL SIDING
RIDGE VENT
RAMP , SLOPE 1:12
STEEL CONCRETE FILLED BOLLARD
EAVE HEIGHT
METAL SIDING
RIDGE VENT
METAL ROOFING
EAVE HEIGHT
14'x14' ROLL-UP DOOR
14'x14' ROLL-UP DOOR
6" STEEL CONCRETE FILLED BOLLARD
6" STEEL CONCRETE FILLED BOLLARD
GUTTER & DOWN SPOUTS
FINISH GRADE
FINISH GRADE
GUTTER & DOWN SPOUTS
M
O
I
N
NO.
DATE
BY
SHT. REF. NO.
OF
EAST
A-2
NORTH
A-2
Sheets and Views
Model
(TYP)
R = 2'-0"
8" SPLIT BLOCK
ELECTRONIC READER BOARD
CAST-IN-PLACE SLOPING
PLANTER WALL
TYP @ COLS
W/ 3-#4 EW
3'x3'x1' FTG
DENOTES WEEPS @
32" O/C (TYP)
TOP CONC
EL. 0'-0"
EL. -0'-1"
TYP W/ OPPOSITE END
ELEVATIONS & WEEPS,
1/4" = 1'-0"
FOUNDATION PLAN
SLOPE
1/4" / FT.
1/4" / FT.
SLOPE CONCRETE TO
DRAIN TO WEEPS
NOTE: VERIFY WITH CONTRACTOR BEFORE POURING SLAB, ALL REQUIRED CONDUITS
FOR GUARDHOUSE, GUARDPOST AND SEARCH POST
TOILET
BREAK
STORAGE
WORK AREA
PLASTIC LAMINATE
COUNTERTOP
B/C
B/C
LOCKING BASE
CABNET
DF
REF
(BELOW)
M/W
(ABOVE)
PLAS. LAM.
COUNTERTOP
GUN RACK
THROUGH WALL
AC/HEATING
UNIT
FLOOR PLAN
ROOF
GUN RACK
OPEN
BELOW
OPEN
BELOW
EDGE OF
COUNTER BRACKET
3' X 3' COMM CABINET
ROOF FRAMING PLAN
VTR
RIDGE
C6x16 GAUGE STUDS
@ 24" O/C
TS 6"x6"x3/8"
ABOVE F.F.
EL. +9'-0"
TS 6"x6"x3/8"
C6x16 GAUGE STUDS
@ 24" O/C
C3-5/8"x16 GAUGE TRUSSES
(TYP)
TOP OF SILL
BOTTOM OF BEAM
ELEV. 8'-0"
ELEV. 4'-0"
ELEV. 0'-0"
ELEV. 9'-0"
TOP OF BEAM
SIDE ELEVATION
VENT THRU ROOF W/ COLLARED
RUBBER BOOT FLASHING
CAST-IN-PLACE CONC. BEAM
MISTING FAN (THIS SIDE ONLY)
LEVEL 3 BALLISTIC RATED
GLASS (TINTED BRONZE)
DOOR W/ TRANSOME
AMANA THRU WALL A/C UNIT
PRECAST CONCRETE SILL
(SEE SPECS - SECTION 15800)
SMOOTH FACE BLOCK
TOP OF CONCRETE
FRONT ELEVATION
SLOPING PLANTER WALL
PRECAST CONCRETE COPING
ALUMINUM DOWNSPOUT
GUTTER
GLASS
STANDING SEAM METAL ROOF
REAR ELEVATION
SLOPING PLANTER WALL
PRECAST CONCRETE COPING
ALUMINUM DOWNSPOUT
GLASS
ROOF PLAN
VTR
E/F
ROOF SLOPE 4/12
ROOF SLOPE 4/12
HIP
RIDGE
DS
HIP RIDGE
SLOPE 3/12
HIP RIDGE
SLOPE 3/12
WINDOW SCHEDULE
SIZE
TYPE
REMARKS
MARK
3'-0"X7'-0"X1 3/4"
LEVEL 3 BALISTIC GLASS AND FRAME
METAL DOOR
2'-4"x6'-8"x1 3/8"
4'-0"X8'-8"
LEVEL 3 BALISTIC GLASS (TINTED BRONZE)
W/ 2'-4" SIDE LIGHT & TRANSOME
3'-0"X7'-0"X1 3/4"
LEVEL 3 BALISTIC GLASS AND FRAME
IN METAL FRAME
METAL DOOR
2'-4"x6'-8"x1 3/8"
4'-0"X6'-0"
LEVEL 3 BALISTIC GLASS (TINTED BRONZE)
2'-0"X4'-0"
LEVEL 3 BALISTIC GLASS
W/ 2'-4" SIDE LIGHT & TRANSOME
Xref Y:\TYNDALL AFB\Tyndall Gate\MP-BORDER.dwg
SHEET NO.:
JOB NO.:
T-A1
Y:\TYNDALL AFB
CAC
1/4" = 1'-0
7/29/04
GUARDHOUSE PLANS AND ELEVATIONS
203053
Sheets and Views
T-A1
P
S
G
F L
TY
AL
AI
FO
RC
BA
SE
LO
RI
5th
IV
IL
NG
IN
EE
QU
AD
RO
EP
AR
TM
EN
TH
IR
CE
UP.
UP.
UP
UP
122B
122A
121B
121A
123B
123A
124B
124A
125B
125A
126B
126A
120B
120A
119B
119A
118B
118A
127B
127A
128B
128A
129B
129A
130B
130A
132B
131A
131B
132A
117B
117A
116B
116A
114B
115B
115A
114A
133B
133A
134B
134A
135B
135A
113B
113A
112B
112A
136B
136A
137B
137A
138B
138A
111B
111A
110B
110A
Sheet of
BUILDING 1046
Revisions
PREPARED BY:
REVIEWED BY:
ISSUE DATE:
119 ALABAMA AVE.
TYNDALL AFB, FL 32403
FAX: (850) 283-0233
TEL: (850) 283-6486
t h
W
Sheets and Views
ARCH D
FLOOR PLAN - BLDG 274
SCALE: 1/16" = 1'-0"
SD
'-1
7"
37'-2" 11'-11" 49'-9 1/2"
'-3
3 1
'-4
'-8
25' 100'
25' 25' 25'
'-9
'-1
10' 14' 40'-5" 3'-4" 8'-3" 14' 10'
100'
1'
1'1'
TY
AL
AI
RC
BA
SE
LO
5th
IV
IL
IN
EE
QU
AD
RO
EP
AR
TM
EN
TH
IR
CE
of
Project NO.
PREPARED BY:
REVIEWED BY:
ISSUE DATE:
119 ALABAMA AVE.
TYNDALL AFB, FL 32403
FAX: (850) 283-0233
TEL: (850) 283-6486
t h
W
BLDG 274
MIMS
MIMS
10 JUNE 2013
Sheets and Views
Master layout
R O
FF
IC
IA
USE O
NLY
PS-100
PS-200
CJ-1
NOTE 6 TYP
152 SLAB SEE
NOTE 4
NOTE 8
NOTE 3
FOUNDATION PLAN NOTES:
FOR GENERAL NOTE SEE DRAWING GS-001
1.
2.
ALL SLABS ON GRADE SHALL BE PLACED ON VAPOR BARRIER
OVER A 150 CAPILLARY WATER BARRIER. FINISH FLOOR
CORNERS TYPICAL.
PROVIDE #13x915 CORNER BAR AT MID-SLAB AT ALL RE-ENTRANT
3.
SLABS AT GRADE SHALL BE AS FOLLOWS:
4.
152 THICK WITH #13 @ 406 E.W. PLACED 38 FROM TOP OF SLAB
FOR SLAB JOINT DETAILS SEE LS-501 (NO DOWELS REQUIRED)
5.
203 CMU WALL WITH #16 BAR AT 610 O.C. VERTICAL, SEE SECTIONS
6.
AND NOTES ON LA-305 AND 306.
VERTICAL AT INTERIOR. SEE ARCH DRAWINGS FOR CONTROL JOINTS
7.
203 SOLID GROUTED CMU WALL WITH #16 BAR AT 610 O.C
FOR ADD'L PADS REQUIRED BY MECH,PLUMBING, AND ELECTRICAL.
MECHANICAL PAD PER EQUIPMENT REQUIREMENTS, SEE SECTION
E/PS-200 FOR PUMP PADS SHOWN ON PLAN, SEE SECTION F/PS-200
13005
12598
B.BRETTMAN
M.THOMASON
R.YOUNKER
AUGUST 2001
PAN-68-288
628PS100.DWG
IN CMU WALLS
17959
17595
5640 R
5640 R
C TRENCH
SEE NOTE 7
SEE NOTE 7
C TRENCH
10000
PS 1
SEE DRAWING PS-202 & PS-203 FOR PIPE SUPPORTS PROVIDE
ADDITIONAL PIPE STATIONS AS SHOWN ON MECHANICAL PLANS.
19251
SCALE IN MILLIMETERS
PS-3
PS-3
PS-2
13210
15545
COMBINE PIPE SUPPORT FOOTINGS
C PIPE SUPP
SLOPE FLOOR 25 TO DRAINS COORD
LOCATION OF DRAINS WITH TANKS
10. CONFIRM ALL PIPE SUPPORT DIMENSIONS AND LOCATIONS WITH
PIPE SUPPLIER.
ELEVATION 0.00 EQUALS ELEVATION 7.80 MSL
8.
9.
PS-203
Reference
Number:
No.
Approved of Engineers
US Army Corps
Mobile District
Description
Date
U.S. ARMY ENGINEER DISTRICT
9400 WARD PARKWAY
BURNS AND MCDONNELL
KANSAS CITY, MISSOURI 64114
TYNDALL AIR FORCE BASE, FLORIDA
CORPS OF ENGINEERS
MOBILE, ALABAMA
UPGRADE MAINTENANCE DOCK
Solicitation Number:
Checked By:
Designed By:
Drawn By:
CADD File Name:
Date:
File No.
Supervised By:
Symb.
COPYRIGHT 2001 BURNS AND McDONNELL ENGINEERING COMPANY, INC.
XLWU003002
F22 AD/AL MAINTENANCE FACILITIES
E. KRAUS
DACA01-01-R-0002
SEE NOTE 13
SEE NOTE 13
MAINTENANCE FACILITIES.
11. REFERENCE ALL AMMENDMENTS AND SPECIFICATIONS FOR F22 ADAL
12. CONTRACTOR TO COORDINATE FOR ANY REVISED PIPING CONFIGURATIONS.
13. PROVIDE 1000x1000x100 THICK STOOP WITH #13 AT 200 MAX
AT TANK LADDER
COORDINATE FINAL LOCATIONS OF MECHANICAL PLANS WITH PUMP
SUPPLIER (SEE PM-100)
(INSIDE TANK)
(INSIDE TANK)
23%%D
14. SEE ARCH DWGS FOR DOOR LOCATIONS
NOTE 15
15. MASONRY SCREEN WALL, SEE ARCH DRAWINGS FOR LOCATION AND DETAILS.
23%%D
COR-GT-1-005-3
PROVIDE FUEL-RESISTANT SEALANT IN ALL JOINTS IN BUILDING
AS-BUILT
Sheets and Views hp5
CMU WALL PER PLANS
EXPANSION JOINT
SLAB ON GRADE PER
PLANS
CENTER UNDER WALL
ALTERNATE HOOKS
2-#16 CONT
EXTERIOR GRADE
PER CIVIL
DOWELS TO MATCH
AND LAP VERTICAL
WALL REINF
SECTION
3-#16 CONT
3-#16 CONT
2-#16 CONT
CENTER UNDER WALL
ALTERNATE HOOKS
EXPANSION JOINT
WALL REINF
AND LAP VERTICAL
DOWELS TO MATCH
PER PLAN
#13 AT 305 EW AT
SLAB CENTERLINE
DOWELS AT 406 O.C.
19 DIA x610 SMOOTH
GREASE ONE END
SLAB ON GRADE
CMU WALL AND JAMB
FOOTING PER SECTION A/PS-200
EXTERIOR PAVING
PER CIVIL
19 DIAx610 SMOOTH
DOWELS AT 310
GREASE ONE END
BASE OF DOOR
PER ARCH
FOOTING PER
SECTION A/PS-200
#13@305 EACH WAY
SEE PLAN FOR
SLAB THICKNESS
13 PREMOLDED
JOINT MATERIAL
SEE MECH
DRAWINGS
#4@305 DWLS
CHEMICAL BOND
ADHESIVE
ROUGHEN SURFACE
TO 8 AMPLITUDE
VARIES SEE MECH
DWGS 102 MIN
#3@305 EW
EQUIPMENT PADS TO BE SIZED FOR
EQUIPMENTS FURNISHED. EQUIPMENT
PADS TO EXTEND A MINIMUM 152
BEYOND EQUIPMENT BASE ON ALL SIDES.
NOTES:
TANK BOTTOM
TOP OF EL 0.03
NOTE 3 AND 4
NOTES 1 & 2
#13@406
8-#19 CONT
NOTE 2
TOC EL 0.00
TANK SHELL
1. EXCAVATE, BACKFILL AND COMPACT IN ACCORDANCE WITH PROJECT SPECIFICATIONS
2. SCARIFY, STABILIZE AND COMPACT TOP 1524 OF EXPOSED SUBGRADE PER PROJECT
SPECIFICATIONS.
3. CONTRACTOR TO COORDINATE FOUNDATION FOR CENTER POST AS REQUIRED.
NOTES:
305 THICK x 1067 SQUARE MINIMUM FOOTING WITH #4@305 EW-T&B
4. CONTRACTOR TO COORDINATE EQUIPMENT SUPPLIED.
FLAT BAR
6x51x254
@ 305
CHECKERED 6
(SECTIONS TO BE
610 LONG MAX)
63x63x6
WITH BAR 6x6
(DISCONTINUE
AT SLAB JOINTS)
75-305
75-305
DETAIL
2-#13 CONT INTERRUPTAT
#13@305
PER PLANS
TRENCH
TANK
FOUNDATION
SECTIONS & DETAILS
B. BRETTMAN
R.YOUKER
PAN-68-290
628PS200.DWG
EL 0.00
SEE NOTE 7, PS-100
SEE NOTE 7, PS-100
CLR
CLR
(COORD WITH TANK SUPPLIER)
GRADE BEAM
AT SLAB JOINTS
SLOPE 25
TO END
EL 8.00
PER ARCH
BEYOND PER PLANS
Sheets and Views hp5
PS-202
PIPE SUPPORT DETAILS
B.BRETTMAN
R.YOUNKER
PAN-68-292
628PS202.DWG
#13 TIES
@ 305
12-#16
VERT.
T/C EL 0.30
#13@305
EW TOP & BOTTOM
FOR PIPE SUPPORT
STEEL SEE THIS SHEET
T/C EL 0.30
#13@12
EW TOP & BOTTOM
SUPPORT STEEL
THIS SHEET
38 GROUT
FOR FOUNDATION
SEE THIS SHEET
W8x24
T/S EL 2.44
10 P EACH SIDE TYP
PIPE SUPPORT PS-3 (2 REQ'D)
1:10
8-19%%C TYPE 2
ANCHOR BOLTS
PIPE SUPPORT FOUNDATION
PS-3 (2 REQUIRED)
W6x25
FOR ANCHOR BOLTS
SEE THIS DRAWING
38 GROUT
%%UPIPE SUPPORT PS-2 (4 REQUIRED)
1:20
PIPE SADDLES AND SUPPORT
TYP
TYP
PER MECHANICAL PLANS
TYP EA
FLANGE
254x202x19 BASE PLATE
4-25%%C TYPE II
ANCHOR BOLTS
WEB
NOT TO SCALE
%%UNOTE
1. FINISH FLOOR ELEVATION 0.00 EQUALS
ELEVATION 7.80
8-#16 BARS
VERTICAL
#13 TIE SETS
@ 200 O.C
4-25%%C TYPE II ANCHOR BOLTS
WITH 90 PROJECTION, SEE
SECTION A/PS-202
IN 38%%C HOLES
PIPE SUPPORT FOUNDATION
PS-2 (4 REQUIRED)
%%USECTION
%%UPLAN
%%UELEVATION
(SEE DWG PS-100)
TIES
VERTICALS
PLAN
ELEVATION
2. GALVANIZE ALL EXTERIOR PIPE SUPPORT
STEEL IN ACCORDANCE WITH ASTM A123
Sheets and Views hp5
38608
%%UFIRE PUMPS
LVRNO
WATER STORAGE TANK
(250,000 GALLON)
MATERIAL
MATERIAL
45mm THICK
ALL HM DOORS
STL
D1
STL
HEAD
12 SIM
21 SIM
SILL
JAMB
NO
DOOR SIZE
FRAME
DETAILS
HARDWARE
(HW SET)
LABEL
LVRNO
%%UDAY TANKS
(126'-8")
(26'-8")
(12'-8")
LETTER
TAG
L-03
L-02
L-01
LOUVER
NO
LOUVER SCHEDULE
HEAD
WIDTH X HEIGHT
x
4 SIM
FINISH OPENING SIZE
HEAD ELEV.
JAMB
SILL
5 SIM
6 SIM
56 1/16
CJ
WALL CONTROL JOINT
BEHIND DOWNSPOUT
- TYPICAL
REFERENCE DRAWING LA-606 FOR SIMILAR LOUVER
DETAILS AND ELEVATIONS
DETAILS
REFERENCE DRAWINGS LA-602, LA-603 & LA-604
FOR DOOR TYPES, DOOR FRAMES AND SIMILAR
FINISH SCHEDULE:
INTERIOR
ALL EXPOSED STRUCTURAL ELEMENTS, MISCELLANEOUS STEEL / METAL,
ALL CONCRETE FLOORS SHALL BE SEALED.
DUCTWORK, PIPES, EQUIPMENT, SUPPORTS, CONDUITS AND CLOSURES SHALL
BE PAINTED PAINT COLOR 1055, POLAR WHITE AS MANUFACTURED BT ICI. PAINT
EXTERIOR
FOR THE WATER STORAGE TANKS AND EXTERIOR PIPES AND SUPPORTS.
FRAMES, INSULATED OVERHEAD ROLL-UP DOORS AND FRAMES SHALL
c. ALL THE ARCHITECTURAL LOUVERS, DOWNSPOUTS, H.M. DOORS
TYPE 5
SPLIT RIBBED (LIGHT TAN CREAM)
SPLIT RIBBED (LIGHT BROWN)
TYPE 4
b. ARCHITECTURAL MASONRY UNITS INTEGRAL COLOR AND PATTERN
SHALL BE:
SHALL MATCH THE LO/CRF (MEDIUM BRONZE).
EXTERIOR COLOR SCHEDULE
a. METAL ROOF AND ASSOCIATED TRIM, FLASHINGS, GUTTERS AND DOWNSPOUTS
WALL LEGEND
2 HOUR FIRE RATED MASONRY BEARING WALL ASSEMBLY
(UL DESIGN NO. U905)
REFERENCE ALL AMENDMENTS AND SPECIFICATIONS FOR F22 ADAL
ARCHITECTURAL FLOOR ELEVATION 0.00 = ACTUAL FLOOR ELEVATION 7.80
OF ANY/ALL DISCREPANCIES BEFORE START OF WORK.
AND CONVERSIONS AS THEY RELATE TO CONSTRUCTION DOCUMENTS,
BUILDING LAYOUT SYSTEMS AND MATERIAL. NOTIFY CONTRACT OFFICER
CONTRACTOR SHALL VERIFY AND COORDINATE ALL MEASUREMENTS
GENERAL NOTES:
STEEL PLATE
SEE STRUCTURAL
DRAWINGS FOR
L-04
ELEC. EXTERIOR LIGHT
RE: ELEC. DWGS
d. GRIND SPLIT FACE BLOCK AS REQUIRED AT ATTACHMENT OF GUTTER
AND GABLE TRIM FOR TRUE, STRAIGHT AND PLUMB INSTALLATION.
CONCRETE STOOP
RE: STRUCT. DWG
METAL DOWNSPOUT
W/ SPLASHBLOCK
(TYP.)
W/ SPLASHBLOCK
METAL DOWNSPOUT
FIRE PUMP HOUSE
PROVIDE AND INSTALL 5 lb "ABC" RATED DRY CHEMICAL FIRE EXTINGUISHER
LOCATION WITH CONTRACT OFFICER.
WITH WALL BRACKET ADJACENT TO DOORS 100, 101, AND 103. VERIFY
ALIGN
15849
(52'-0")
(1'-0")
HOLLOW METAL DOORS & FRAMES AND COILING DOOR TO MATCH THE ROOF COLOR.
MATCH ROOF COLOR. VERIFY PAINT COLOR WITH CONTRACTING OFFICER
PR
EEW
ABOVE DOOR
(42'-8")
(41'-4")
ALL EXTERIOR MASONRY SHALL BE SEALED.
REFERENCE MASONRY DETAILS ON DRAWINGS LA-305 AND LA-306.
203%%C CONC. FILLED
PIPE GUARDPOST
RE: TYP. GUARDPOST
DETAIL 1 ON LA-101
FIRE PUMP
CONTROLLER PAD (TYP. OF 5)
PUMP PAD
RE: STRUCT.
DWGS
(TYP. OF 5)
SUMP - RE: STRUCT.
DRAWINGS
PIPE RACK
RE: STRUCT. DWGS
EQUAL
PA-100
R. JONES
I. CHANG
RMB
PAN-68-284
628PA100.DWG
Sheets and Views layer1
38608
(126'-8")
(26'-8")
(12'-8")
PA-101
PA-200
PA-300
GABLE TRIM
METAL GUTTER
AND DOWNSPOUT (TYP.)
CONTINUOUS METAL
RIDGE COVER
FACILITIES.
REFERENCE ALL AMENDMENTS AND SPECIFICATIONS FOR F22 ADAL MAINTENANCE
/ SLEEVE - TYPICAL
SEALANT ALL AROUND
STAINLESS STEEL FLASHING
203 NOM. CMU WALL
BOTH SIDES
25 MIN
102 MIN
50 MIN
(HEAT RESISTANT INSULATION
PACK VOID W/ INSULATION
PIPE OR CONDUIT
ROOF DECK
STANDING SEAM METAL ROOF SYSTEM
OVER VAPOR BARRIER ON R-8
RIGID ROOF INSULATION AND METAL
AS REQUIRED AT ATTACHMENT
SCALE IN MILIMETERS
PRECAST CONCRETE CAP
c
6-#13
TOP & BOT.
PAVING OR GRADING
TOP OF CONC.
EL = 7.80
4-#13 E.F.
CONCRETE FOOTING
#13 @ 203 SET INTO
HORIZ. WIRE REINF.
VENEER - CAVITY
FILLED W/ CONCRETE
@ 406 O.C.
W/ 2#13 BARS
#13 @ 305 O.C.
TOP AND BOT.
#13 @ 203 O.C.
813 (SPLIT RIBBED - TYPE 4)
1625 (SPLIT RIBBED - TYPE 5)
4" NOMINAL CMU
VENT
ALL PENETRATIONS THROUGH FLAT PANEL ONLY.
BY ROOFING CONTRACTOR
FLEXIBLE FLASHING
STANDING SEAM
S.S. BAND CLAMP
VENT PIPE
TYPICAL VENT PIPE
PENETRATION DETAIL
3 : 12
CONTINUOUS SEALANT
CLOSURE EACH SIDE
2 PIECE 22 GA. MIN. METAL
HAMMED EDGES
51 MIN
51 MIN
MECH. PIPE - RE: MECH.
203 NOMINAL CMU WALL
PACK VOID W/ INSULATION
DRAWINGS FOR SIZES
AND LOCATIONS
CONTINUOUS SEALANT
PLATE @ PERIMETER
REINF.
BOND BEAM W/ HORIZ.
10 x 200 METAL
203 NOMINAL CMU
PA-PA-101
NOT OT SCALE
OF OPENING
GRIND SPLIT FACE BLOCK
OF METAL CLOSURE
(HEAT RESISTANT
SEALANT @ EXHAUST)
@ EXHAUST)
(41'-4")
SEE MECH. DWGS FOR PIPE SIZE
SEE MECH. DWGS FOR PIPE SIZE
457 MIN
SCALE IN MILIMETERS
OF METAL GUTTER
WOOD BLOCKING
SHT. METAL FLASHING
102 x 127 RECTANGULAR
METAL DOWNSPOUTS (TYP.)
REFERENCE STRUCTURAL DRAWINGS
FOR JOIST BEARING DETAILS
203 NOMINAL CMU WALL
REFERENCE DWG LA-305 AND LA-306
FOR STANDARD MASONRY DETAILS
PAN-68-285
628PA101.DWG
Sheets and Views layer1
GROUND FLOOR EL = 0.00
JOIST BEARING EL = 4.27
RIDGE LINE EL = 5.28
(EL = 100'-0")
(EL = 114'-0")
(EL = 117'-10")
(EL = 110'-10")
JOIST BEARING @ DAY TANKS EL = 3.30
AND DOWNSPOUT
SPLIT RIBBED CMU
INSULATED OVERHEAD
ROLL-UP DOOR
METAL LOUVER
HOLLOW METAL DOOR
AND FRAME
BEYOND
METAL LOUVER
(TYPE 4)
-TYPICAL
FACILITIES.
REFERENCE ALL AMENDMENTS AND SPEC'S FOR F22 ADAL MAINTENANCE
FOR MECHANICAL SILENCER
PIPE PENETRATIONS (TYP. OF 4)
(TYPE 5)
SPLIT FACED CMU
RE: TYP. GUARDPOST DETAIL 1 ON LA-101
203%%C CONC. FILLED PIPE GUARDPOST
WALL OPENINGS
-TYPICAL
100mm MIN.
OVERLAP
METAL CLOSURE
CLOSURE EACH SIDE
2 PIECE 22 GA. MIN.
2 PIECE 22 GA. MIN.
EXTERIOR ELEVATIONS
PAN-68-286
628PA200.DWG
Sheets and Views layer1
BUILDING SECTION
TOP OF CMU EL = VARIES
JOIST BEARING EL = 3.30
JOIST BEARING EL = 3.30
/JOIST BEARING EL = 4.27
AND ROOF DECK
PANELS ON RIGID INSULATION
BUILDING SECTION
TOP OF CMU EL = VARIES
CONTINUOUS METAL RIDGE COVER
203 NOMINAL
CMU WALL
CONTINUOUS METAL RIDGE COVER
PANELS ON RIGID INSULATION
AND ROOF DECK
CMU WALL
203 NOMINAL
TOP OF CMU
SPLIT RIBBED - TYPE 4
SPLIT RIBBED - TPYE 5
CONTINUOUS METAL GUTTER
W/ HORIZ. REINFORCINGS
CONCRETE SPLASHBLOCK
VAPOR BARRIER
6" GRANULAR FILL
203 NOMINAL CMU (2 HOUR
FIRE RATED CONSTRUCTION
UL DESIGN NO. U905)
CONTINUOUS METAL GUTTER
CONCRETE SPLASHBLOCK
REFERENCE STRUCTURAL
DRAWINGS FOR STEEL JOIST
SIZES AND ANCHORAGE DETAILS
CONTINUOUS 20 GA. GALV.
METAL CLOSURE EACH SIDE
FILL METAL ROOF DECK FLUTE
& VOID SPACE W/ FIRE SAFING
INSULATION
ATTACH TO ROOF DECK ONLY
PIPE PENETRATIONS (TYP. OF 4)
WALL OPENINGS FOR MECHANICAL SILENCER
REFERENCE ALL AMENDMENTS AND SPECIFICATIONS FOR F22 ADAL
MASONRY DETAILS.
REFERENCE DRAWINGS LA-305 AND LA-306 FOR STANDARD
REFERENCE DRAWINGS LA-503 AND LA-504 FOR TYPICAL/SIMILAR
WALL AND ROOF PENETRATION DETAILS.
PREFINISHED METAL LOUVER
ASSEMBLY W/ INSECT SCREEN
CONT. SEALANT ALL AROUND
BOTH SIDES
PREFINISHED SILL FLASHING
SET IN CAULK BED
SUPPORT AT PERIMETER
OF LOUVER AND DAMPER
UL DESIGN NO. U905)
FIRE RATED CONSTRUCTION
203 NOMINAL CMU (2 HOUR
FIRE PUMPS
DAY TANKS
FIRE PUMPS
SPLIT FACED CMU - TYPE 5
VARIES
6.
AT GUTTER, PROVIDE SMOOTH FACE BLOCK
(LIGHT TAN CREAM)
CUT BLOCK
(LIGHT TAN CREAM)
SMOOTH FACE BLOCK
AT GUTTER, PROVIDE
-TYP.
SUMP-RE: STRUCT.
DWGS
-TYP.
TRENCH
RE: STRUCT. DWGS
SIMILAR
OPP. HAND
OF GABLE TRIM
TO MATCH SLOPE
PIPE RACK - RE: STRUCT
DRAWINGS FOR DETAIL
CONTINUOUS ANGLE
EAVE HEIGHT EL = 3.55
EAVE HEIGHT EL = 4.55
(FIELD VERIFY)
(FIELD VERIFY)
WALL AND BUILDING
SECTIONS
PAN-68-287
628PA300.DWG
Sheets and Views layer1
'-6
14'-0" 13'-2"
30'-2"
EXTEND 90° HOOKS TO
OPPOSITE VERTICAL
REINFORCEMENT
#6 BAR IN "U" SHAPE, VERTICALLY
SPACED @ 6" C-C. EXTEND TO 8'
FROM WALL CORNER
DIAGONAL REINFORCEMENT,
#4 BAR @ 6" VERTICAL C-C
SPACING. STRING FROM OUTER
TO OUTER LONG, REINFORCEMENT
TYP STIRRUP
PLACEMENT
PATTERN
NOTE:
1 - INTERIOR BEND RADII
#3 STIRRUPS: 0.75"
#4 1.5" #5 1.8" #6 2.25"
2 - MIN. LAP SPLICE LENGTH
#5 21"
3 - PROVIDE 2" CLEAR COVER
FOR ALL REINFORCEMENT
IN FOOTING
3'-0"
3'
5' -2
24'-2"
11'-2"
15'-0" 4'-0"
6'
1" 9'
1"
12'-0"
6'-0"
6'
21'-4"
19'-0"
7'
1'-2"4"
6"
1/2" WEDGE
ANCHOR
#5 LONGITUDINAL BARS,
12" C-C FROM 6" ABOVE
FOOTING FACE
#3 STIRRUPS PLACED 6" C-C
VERTICAL SPACING. BEGIN
2' FROM FOOTING FACE, TO
4'-8" ENTIRE LENGTH OF WALL
#6 VERTICAL
REINFORCEMENT 6" C-C
#5 BAR DEFORMED
AROUND LONGITUDINAL
BARS, 12" C-C
EXTEND 90° HOOKS TO
OPPOSITE VERTICAL
REINFORCEMENT
4"x4" TREATED
POSTS
2' -6
-6
7'
1'-2" 4"
3'
12'-0"
6'-0"
1/2" WEDGE
ANCHOR
STEM WALL
4" x 4" POSTS
SAND
CONCRETE FOOTING & STEM WALL NOTES:
1 ALL FOOTINGS SHALL BE A MIN. OF 6" BELOW NEW FINISH GRADE ELEVATION
2 CONTRACTOR SHALL EXCAVATE, FORM & PLACE A 4'W x 18"D SPREAD FOOTING & 14" x 7'H STEM WALL. CONCRETE SHALL BE A MIN. OF 4000 PSI.
3 CONTRACTOR SHALL FURNISH & INSTALL RE-INFORCING STELL
4 CONTRACTOR SHALL FILL ALL VOIDS & BUFF THE STEM WALL w/MORTER &
BURLAP SACK METHOD.
5 CONTRACTOR SHALL WRECK ALL BELOW & ABOVE GROUND FRAMEWORK
6 CONTRACTOR SHALL PLACE & COMPACT CRUSHED CONCRETE AROUND FOOTING
BRINGING THE ENTIRE SITE TO FINISH GRADE. MAX. 218 YARDS OF CRUSHED CONCRETE
FINISH LUMBER NOTES:
1 CONTRACTOR SHALL FURNISH & INSTALL NOMINAL 4"x4" TREATED POST ALONG
ALL INTERIOR WALLS OF THE NEW BUNKER. POSTS SHALL EXTEND FROM THE
CRUSHED CONCRETE PAD TO THE FINISH GRADE OF THE STEM WALL.
2 POST SHALL BE ANCHORED INTO THE CONCRETE STEM WALL w/WEDGE ANCHOR
TOP & BOTTOM.
PROJ. NO.
S-1 221/2" = 1' - 0"A. BOLING
STRUCTURAL PLAN
B. ROCHA
REPLACE EOD BUNKER
31 OCT 13
8200 AREA
13-1054
APPROVED PER CE
AS BUILTSB
A 29 OCT 13
20 OCT 14 AAB
AAB
CROSS SECTION OF BUNKER
SCALE: 1/2"=1'-0" AS BUILTS
BUNKER WALL SECTION
SCALE: NTS
WALL LAYOUT