Appendix A Phase 8 Notes Per Bldg v1.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- FA481921B0003 - Tyndall AFB - Demolition Phase 8 Federal contract opportunity
- Solicitation number
- FA481921B0003
About this file
This solicitation is for demolition services at Tyndall Air Force Base as part of Phase 8 of its reconstruction efforts. The Air Force is seeking bids for the demolition of over 200 buildings and structures across multiple locations on the base. Bids are due no later than February 23, 2021 and will be opened on that date at 1:00 PM CST. The solicitation is set aside for 8(a) small businesses and offers a 60-day firm pricing period. Demolition is divided into multiple contract line items (CLINs) and bidders must provide unit pricing for all line items as well as an aggregate total price for all CLINs. Successful bidders will be expected to backfill and establish grass at demolition sites. The documents provide photos, surveys, and detailed requirements for each structure to ensure regulatory compliance and consideration of historical/environmental factors.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Demo Tracker
| Bldg | Name | Location | Map Location | Estimated SF | Year Built | Surveyed? | (PMO) Status | MilCon Overlap | Zone | Occupancy | Temp Solution | Demo No Earlier Than | Clear Site Goal | MilCon NTP Issued_Last Possible Day | Restore to? | Notes/Also Take Out? |
| 119 | alert area bathroom septic | Flightline | Alert | 500 | 1992 | yes | FDR DEMO | none | N/A | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | the intent is to remove everything in the area besides the two hangars themselves. Fencing and lights must also be taken out and removed. Light removal must be coordinated with GCEC | |||||
| 120 | alert area water supply bldg | Flightline | Alert | 100 | none | N/A | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | the intent is to remove everything in the area besides the two hangars themselves. Fencing and lights must also be taken out and removed. Light removal must be coordinated with GCEC | ||||||||
| 121 | alert area capped water well | Flightline | Alert | 36 | 1974 | yes | FDR DEMO | none | N/A | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | well abandonment permit required: https://www.nwfwater.com/Permits/Well-Permits/Permitting-Process | |||||
| 128 | alert area storage | Flightline | Alert | 500 | 1986 | yes | FDR DEMO | none | N/A | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | the intent is to remove everything in the area besides the two hangars themselves. Fencing and lights must also be taken out and removed. Light removal must be coordinated with GCEC | |||||
| 156 | HANGAR 3 | Flightline | FL West | 43787 | 1943 | yes | Future Demo | FS 1 | 2- Flightline Ops | occupied, specifically houses E9s | FY21 hangar and temp space lease based on MILCON determination - theses dates are in flux | TBD | 22-Nov-21 | 21-Jan-22 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 212 | REC PAVILION | Flightline | FL East | 462 | yes | MP DEMO | OSS | 2- Flightline Ops | used | will move with FS. Dates conflict - temp move difficult and MILCON dates flexing, further clarity post award | 1-May-21 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | ||
| 214 | Fire Station #1 | Flightline | FL East | 19299 | 1965 | yes | MP DEMO | OSS | 2- Flightline Ops | occupied; generator; tank | moving to 335 with sprungs and trailers | 1-May-21 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | tank; remnants of tower mounted to south side and its small remaining foundation below grade; pavilion (B212), dates in conflict - more info to come |
| 216 | RAPCON / AIRFLD | Flightline | FL East | 11567 | 1980 | yes | HARD | OSS | 2- Flightline Ops | occupied; generator; tank. fiber in foundations of bldgs nearby | occupants in 1285 | 1-Jul-20 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | tank |
| 217 | OSS ADMIN | Flightline | FL East | 1412 | 1961 | yes | HARD | OSS | 2- Flightline Ops | comm needs to cut/pull back cables | N/A | 1-Jul-20 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 219 | COMMAND POST/OG AND OSS SQUADRON | Flightline | FL East | 22893 | 1963 | yes | HARD | OSS | 2- Flightline Ops | ITN; generator; EMCS supports 214, too; need to splice out comm lines | ITN moved | 1-Sep-20 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 246 | WEAPONS TRAILER MAINTENANCE | Flightline | FL West | 12056 | 1959 | yes | Future Demo | Infrastructure | 4- Infrastructure | maintenace | sprung at ammo ordered, possibly admin too | 1-Jan-21 | 25-Apr-21 | 24-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 256 | DRONE SUBSCALE MX | Flightline | FL East | 26871 | 1960 | yes | MP DEMO | Infrastructure | 4- Infrastructure | occupied; tank | moving to T256 which are relocating to 258 pad | TBD | 25-Apr-21 | 24-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | tank; very precise structure removal and limits of slab demo provided |
| 262 | MXS STORAGE | Flightline | FL East | 1040 | 1969 | yes | FDR DEMO | Infrastructure | 4- Infrastructure | some storage | possibly sprung city or flightline | 1-Jul-20 | 25-Apr-21 | 24-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 266 | BASE SUPPLY | Flightline | FL East | 135247 | 1998 | yes | MP DEMO | Spc Purp Veh Maint | 2- Flightline Ops | storage and retrieval; comm needs to splice out comm lines for adj trailer | assets picked up | 1-Jul-20 | 4-Apr-21 | 3-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | loading dock in rear |
| 273 | FIRE SUPPRESSION PUMPHOUSE for 290, 295 | Flightline | FL East | 3300 | 2004 | yes | MP DEMO | OSS Parking Lot | 2- Flightline Ops | used; generator; many tanks, support 290 too | dates in flux - will remain until F-22's leave | 1-Sep-21 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 274 | DRONE MAINTENANCE | Flightline | FL East | 6532 | 2004 | yes | Future Demo | Infrastructure | 4- Infrastructure | occupied | temps at 9700 area | 1-Jan-21 | 25-Apr-21 | 24-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | infrastructure dates more flexible - awaiting full project schedule |
| 275 | 250K WATER STORAGE SUPPORTING B273 | Flightline | FL East | 1500 | 2004 | yes | MP DEMO | OSS Parking Lot | 2- Flightline Ops | using | dates in flux - will remain until F-22's leave | 1-Sep-21 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 276 | 250K GA WATER TANK SUPPORTING B273 | Flightline | FL East | 1500 | 2004 | yes | MP DEMO | OSS Parking Lot | 2- Flightline Ops | using | dates in flux - will remain until F-22's leave | 1-Sep-21 | 14-Oct-21 | 23-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 312 | AFFF SUPPORT BLDG FOR 316 | Flightline | FL East | 240 | 2001 | HARD | none | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | guidelines for disposing of AFFF must be abided by | |||||||
| 333 | VERTICAL ACFT EXTERNAL TANK STORAGE | Flightline | FL East | 11700 | 2004 | yes | Future Demo | Infrastructure | 4- Infrastructure | tank cataloguing | projected done 31Mar | 1-Dec-20 | 25-Apr-21 | 24-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | infrastructure dates more flexible - awaiting full project schedule |
| 370 | DEPLOYMENT PROCESING CENTER | Flightline | FL East | 11100 | 1994 | yes | MP DEMO | Infrastructure | 4- Infrastructure | none | N/A | 1-Jul-20 | 25-Apr-21 | 24-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | infrastructure dates more flexible - awaiting full project schedule |
| 373 | LRS RAMP - TRUCK SCALE | Flightline | FL East | 2200 | 1943 | MP DEMO | Infrastructure | 4- Infrastructure | Used | 1-Feb-21 | 25-Apr-21 | 24-Jun-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | infrastructure dates more flexible - awaiting full project schedule; includes weighing equipment encased in concrete | ||
| 546 | FLT SIM PHYSI AND COOLING TOWER (44403) | Flightline | FL West | 23917 | 1955 | yes | HARD | Infrastructure (NW corner) | 4- Infrastructure | E half occupied, mission criticial, cannot be demo'd until new FSRM complete | dates in flux - plan TBD | 1-Sep-22 | 7-Jun-21 | 6-Aug-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 745 | FAMILY SUPPORT CENTER/AIRMANS ATTIC | Support | Sup Central | 6936 | 1943 | yes | MP DEMO | Gates | 4- Infrastructure | storage; checkin post 662mod | possibly sprung city | 1-Oct-20 | 28-Aug-21 | 27-Oct-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 909 | DISASTER PREP | Support | Sup Central | 10636 | 1943 | yes | MP DEMO | Community Commons | 11- Community Commons | occupied; generator; tank | trailer through CONS by 1309, alt. ride-out and EOC CEX responsibility | 1-Mar-21 | 19-Jul-21 | 17-Sep-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 1013 | EOD TEMPORARY LOCATION: GROUNDS | Support | Sup Central | 6936 | 1943 | yes | MP DEMO | Emergency Management | 8- Admin | occupied | trailers through CONS | 1-Jan-21 | 17-Aug-21 | 16-Oct-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 1017 | SCORE BOOTH FALCON FIELD | Support | Sup Central | 432 | 1989 | yes | MP DEMO | Emergency Management | 8- Admin | none | N/A | 1-Jul-20 | 17-Aug-21 | 16-Oct-21 | SW or SP backfill with Bahia (Pensacola or Argentine for flightline side) grass established | |
| 1018 | FALCON FIELD | Support | Sup Central | 25000 | 1949 | MP DEMO | Emergency Management | 8- Admin | none | N/A | 1-Jul-20 | 17-Aug-21 | 16-Oct-21 | just remove sandy top until bare earth is reached | get rid of sandy top, bases, dugout, broken fencing, score board, benches, debris around, etc | |
| 1022 | TENNIS COURTS | Support | Sup Central | 10000 | 1949 | MP DEMO | Emergency Management | 8- Admin | none | N/A | 1-Jul-20 | 17-Aug-21 | 16-Oct-21 | SW or SP backfill with Bahia grass established | fence, nets, etc | |
| 1034 | MS DORM PAVILION | Support | Sup Central | 620 | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | walkway bridge across swale; protect swale however | ||
| 1036 | MS DORM | Support | Sup East | 31559 | 1978 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1046 | MED GP DORM | Support | Sup East | 31818 | 1978 | yes | MP DEMO | Dorms | 10- Lodging/Dorms | none | N/A | 1-Jul-20 | 17-Jun-21 | 16-Aug-21 | SW or SP backfill with Bahia grass established | |
| 1060 | DORM VAQ | Support | Sup Central | 41611 | 1984 | yes | MP DEMO | Dorms | 10- Lodging/Dorms | occupied | other dorms, time demo | 1-Jan-21 | 17-Jun-21 | 16-Aug-21 | SW or SP backfill with Bahia grass established | |
| 1126 | SCORE BOOTH FEDERAL FIELD | Support | Sup East | 648 | 1991 | yes | MP DEMO | CE/CONS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 3-Dec-21 | 1-Feb-22 | SW or SP backfill with Bahia grass established | |
| 1130 | FEDERAL FIELD | Support | Sup East | 25000 | MP DEMO | CE/CONS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 3-Dec-21 | 1-Feb-22 | just remove sandy top until bare earth is reached, then establish grass | get rid of sandy top, bases, dugout, broken fencing, score board, benches, debris around, etc | ||
| 1132 | STORAGE FOR BALLFIELDS | Support | Sup East | 1530 | 1988 | yes | MP DEMO | CE/CONS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 3-Dec-21 | 1-Feb-22 | SW or SP backfill with Bahia grass established | |
| 1149 | DORM | Support | Sup East | 38562 | 1978 | yes | MP DEMO | CE/CONS Complex | 5- Industrial | occupied | other dorms, time demo | 1-Jan-21 | 3-Dec-21 | 1-Feb-22 | SW or SP backfill with Bahia grass established | |
| 1150 | DORM | Support | Sup East | 13700 | 1987 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1151 | DORM DAYROOM QUADS | Support | Sup East | 2615 | 1987 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1152 | DORM | Support | Sup East | 12109 | 1987 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1153 | DORM DAYROOM | Support | Sup East | 3315 | 1987 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1154 | DORM | Support | Sup East | 12109 | 1987 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1155 | DORM DAYROOM | Support | Sup East | 2615 | 1987 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1156 | TECH TRAINING STUDENT HOUSING | Support | Sup East | 13700 | 1987 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | |
| 1157 | DORM PAVILION | Support | Sup East | 500 | yes | MP DEMO | LRS Complex | 5- Industrial | none | N/A | 1-Jul-20 | 1-Feb-22 | 12-Dec-21 | SW or SP backfill with Bahia grass established | ||
| 1261 | Skeet Range Towers | Support | Sup East | 1988 | none | N/A | SW or SP backfill with Bahia grass established | |||||||||
| 1263 | LATRINE AT SKEET RANGE | Sabre | Beacon Beach | 400 | 2005 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 1286 | OLD STORAGE FACILITY | Sabre | Beacon Beach | 231 | 1959 | yes | FDR DEMO | ACS doesn't want stuff | TBD | SW or SP backfill with Bahia grass established | ||||||
| 1332 | SAND DOLLAR INN BILLETING OFFICE | Sabre | Sup West | 6815 | 1943 | yes | FDR DEMO | Lodging Comm Node, no people | NAF project to move to T1332 | 1-Jan-20 | SW or SP backfill with Bahia grass established | |||||
| 1380 | VOQ | Support | Sup West | 17738 | 1959 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 1381 | VOQ | Support | Sup West | 18299 | 1970 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 1454 | O'CLUB | Support | Sup West | 21806 | 1995 | yes | FDR DEMO | none | N/A | 1-Feb-21 | slab may be descoped | |||||
| 1476 | COMM AND CTR STORAGE | Support | Sup West | 5228 | 1943 | yes | FDR DEMO | Comm storage | going to sprung - submitted to DLA | SW or SP backfill with Bahia grass established | ||||||
| 1540 | POOL | Support | Sup East | 5220 | 1965 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | have to fill in pool ditch to normal grade, damaged pool equipment, pavement around | |||||
| 1541 | POOL WATER TRMT | Support | Sup Central | 419 | 1965 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | broken fence around | |||||
| 1708 | PEST MGMT STORAGE | Support | Sup East | 2080 | 1994 | yes | Future Demo | Wastewater FY20 FSRM | storage | 1-Jul-20 | 1-Mar-21 | SW or SP backfill with Bahia grass established | ||||
| 1723 | CE SUPPORT BLDG | Support | Sup East | 1102 | 1945 | yes | FSRM execution | Wastewater FY20 FSRM | storage | GCEC being built back | 1-Jul-20 | 1-Mar-21 | SW or SP backfill with Bahia grass established | |||
| 1726 | WASTEWATER SUPPORT BLDG | Support | Sup East | 100 | 1964 | Future Demo | Wastewater FY20 FSRM | none | 1-Aug-21 | 1-Mar-21 | SW or SP backfill with Bahia grass established | |||||
| 2399 | GIRL SCOUT HUT | Sabre | Hwy 98 | 1267 | 1972 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||
| 2893 | FIRE STATION QUARTERS | Sabre | Housing | 3540 | 1958 | yes | Future Demo | generator; tank | N/A | SW or SP backfill with Bahia grass established | remove tank | |||||
| 2894 | FIRE STATION VEHICLE BLDG | Sabre | Housing | 969 | 1981 | yes | MP DEMO | none, but historic, needs form | N/A | SW or SP backfill with Bahia grass established | abide by EA and 813 requirements | |||||
| 2899 | MWR/NAF STORAGE | Sabre | Housing | 4020 | 1958 | yes | Future Demo | Comm storage | SW or SP backfill with Bahia grass established | |||||||
| 3001 | SECURITY FORCE TRAINING | Sabre | Housing | 2910 | 1960 | yes | Future Demo | storage | SW or SP backfill with Bahia grass established | |||||||
| 3002 | STORAGE | Sabre | Housing | 936 | 1960 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 3015 | GOLF CART BARN | Sabre | Golf Course | 6433 | 1999 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||
| 3017 | GOLF STORAGE | Sabre | Golf Course | 2269 | 1972 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||
| 3018 | GOLF CLUBHSE | Sabre | Golf Course | 4020 | 1987 | yes | Future Demo | interim authobby | FSRM project complete | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||
| 3027 | GOLF COUSRE STORAGE | Sabre | Golf Course | 999 | 1988 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||
| 3029 | GOLF COURSE CLUB HOUSE | Sabre | Golf Course | 9952 | 1941 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||
| 3031 | small golf course shed | Sabre | Golf Course | 50 | none | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||||||
| 3034 | GOLF STORAGE | Sabre | Golf Course | 255 | 1988 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | SHPO MOA MUST be abided by | |||||
| 3216 | YOUTH CENTER STORAGE | Sabre | Housing | 800 | 1992 | yes | Future Demo | none | Check if back in use or can be used | SW or SP backfill with Bahia grass established | ||||||
| 3285 | PAVILIONS FELIX LAKE REC AREA | Sabre | Housing | 300 | 1997 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 3351 | FELIX LAKE GAS STATION TANKS | Sabre | Housing | 500 | 1999 | yes | Future Demo | underground storage tanks | N/A | SW or SP backfill with Bahia grass established | needs 90 day notice for proper disposal | |||||
| 5013 | BONITA BAY MWR | Sabre | Bonita Bay | 4888 | 1987 | yes | HARD (possibly retain slabs/utilities) | some storage; 2 above ground storage tanks SE of bldg | removing | slab may be descoped | ||||||
| 5018 | STORAGE MWR | Sabre | Bonita Bay | 120 | 1988 | yes | MP DEMO | none | Check with Ops | SW or SP backfill with Bahia grass established | ||||||
| 5024 | STORAGE BONITA BAY MWR | Sabre | Bonita Bay | 240 | 1988 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 5033 | ATRS STORAGE | Sabre | Bonita Bay | 241 | 1992 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 6002 | LATRINE 6000 AREA REC SITE | Flightline | FL 6000 | 393 | 1993 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | must abide by SHPO | |||||
| 6003 | PAVILION AT 6000 AREA | 6000 Area | 500 | 1993 | HARD | SW or SP backfill with Bahia grass established | must abide by SHPO | |||||||||
| 6006 | EXERCISE COMMAND CENTER | Flightline | FL 6000 | 528 | 1996 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 6028 | SHOP | Flightline | FL 6000 | 1020 | 1945 | yes | HARD | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 6030 | GROUND MX SHOP | Flightline | FL 6000 | 4000 | 1962 | yes | HARD | CE/CONS Complex | 5- Industrial | none | N/A | 1-Jan-21 | 3-Dec-21 | 1-Feb-22 | SW or SP backfill with Bahia grass established | |
| 6060 | SABER CONTRACTOR STORAGE | Flightline | FL 6000 | 6360 | 1992 | yes | HARD | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 6067 | CE UTILITIES | Flightline | FL 6000 | 1500 | 1991 | yes | HARD | need to reroute comm to 6056/6070 | N/A | SW or SP backfill with Bahia grass established | ||||||
| 7027 | STORAGE | Ammo | Ammo | 5000 | 1988 | MP DEMO | 7000 Area | 7- MSA | only slab remains | 1-Sep-20 | 15-Jun-21 | 14-Aug-21 | SW or SP backfill with Bahia grass established | |||
| 7029 | MUNITIONS STORAGE | Ammo | Ammo | 5000 | 1985 | MP DEMO | 7000 Area | 7- MSA | only slab remains | 1-Sep-20 | 15-Jun-21 | 14-Aug-21 | SW or SP backfill with Bahia grass established | |||
| 7030 | STORAGE | Ammo | Ammo | 5000 | 1983 | MP DEMO | 7000 Area | 7- MSA | only slab remains | 1-Sep-20 | 15-Jun-21 | 14-Aug-21 | SW or SP backfill with Bahia grass established | |||
| 7031 | STORAGE MUNITIONS | Ammo | Ammo | 5000 | 1988 | MP DEMO | 7000 Area | 7- MSA | only slab remains | 1-Sep-20 | 15-Jun-21 | 14-Aug-21 | SW or SP backfill with Bahia grass established | |||
| 7033 | MUNITION ADMIN | Ammo | Ammo | 3220 | 1983 | yes | Future Demo | alarm hub; generator; tank | SW or SP backfill with Bahia grass established | |||||||
| 7040 | SHP MSL AS | Ammo | Ammo | 3200 | 1987 | yes | Future Demo | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 8200 | ORDNANCE DISPOSAL | Crooked Island | Crooked Island | 1000 | 1960 | HARD | retain rocket structure | SW or SP backfill with Bahia grass established | 2570 ' SE OF AMMO GATE DOWN HWY 98. TURN RIGHT ON ACCESS ROAD. RANGE IS ON WATER'S EDGE; retain rocket structure | |||||||
| 8522 | SUBSCALE DRONE MX BLDG | Subscale | Subscale | 1695 | 1961 | yes | HARD | only slab and half wall remains | N/A | definitely take out half walls, slab may be desoped | ||||||
| 9371 | PAVILIONS AT PQM LAKE FULL SCALE DRONE | Silver Flag | Silver Flag | 186 | 2016 | HARD | SW or SP backfill with Bahia grass established | |||||||||
| 9419 | CONFIDENCE COURSE SILVER FLAG | Silver Flag | Silver Flag | 1000 | 2018 | HARD | SW or SP backfill with Bahia grass established | |||||||||
| 9420 | SILVER FLAG SHOOTING RANGE | Silver Flag | Silver Flag | 1000 | 1998 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9421 | SILVER FLAG STORAGE | Silver Flag | Silver Flag | 240 | 1998 | yes | MP DEMO | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9424 | RAPPEL TRAINING TOWER | Silver Flag | Silver Flag | 1000 | 2009 | HARD | SW or SP backfill with Bahia grass established | |||||||||
| 9443 | RESEARCH FIRE EQUIPMENT STORAGE | Silver Flag | Silver Flag | 6495 | 1998 | yes | Future Demo | none | N/A | slab may be descoped | ||||||
| 9456 | VEHICLE MAINT (PROPANE TANK) | Silver Flag | Silver Flag | 10740 | 1993 | yes | HARD | SF Veh Maint | 12- Silver Flag | tank; need to pull back cabling | N/A | 1-Jul-20 | 15-Oct-21 | 15-Oct-21 | SW or SP backfill with Bahia grass established | |
| 9461 | FIRE TRAINING BLDG | Silver Flag | Silver Flag | 7785 | 2000 | yes | MP DEMO | SF Fire Station | 12- Silver Flag | need to pull back cabling | N/A | 1-Jul-20 | 15-Oct-21 | 15-Oct-21 | SW or SP backfill with Bahia grass established | |
| 9496 | MULTI PURPOSE REC BLDG | Silver Flag | Silver Flag | 733 | 1999 | yes | HARD | need to rereoute comm to 9576 | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9497 | MISC REC BLDG | Silver Flag | Silver Flag | 3288 | 1999 | yes | FDR DEMO | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9525 | METAL STORAGE BLDG @ SKY TEN | Silver Flag | Sky X | 2011 | 2008 | yes | HARD (possibly retain slabs/utilities) | none | N/A | slab may be descoped | ||||||
| 9545 | DRONE MAINT/RECOVERY BLDG | Silver Flag | Sky X | 1200 | 1996 | yes | HARD | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9704 | PAINT SHOP STORAGE | AFRL | AFRL | 409 | 1958 | yes | HARD | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9706 | AFRL ADMIN | AFRL | AFRL | 9523 | 1958 | yes | HARD | none; has pavilion | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9716 | PARACHUTE TRAINING TOWER | AFRL | AFRL | 122 | 1968 | yes | HARD | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9733 | CE SHOPS AFRL | AFRL | AFRL | 5632 | 1983 | yes | HARD | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9735 | AFCEC/DHS EXLOSIVE LAB | AFRL | AFRL | 9000 | 1983 | yes | HARD | none; tanks | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9737 | PAVEMENTS LAB STORAGE SHED | AFRL | AFRL | 1000 | 2008 | yes | HARD (Retain slabs/utilities) | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9738 | ROBOTICS LAB | AFRL | AFRL | 29797 | 1984 | yes | HARD (partial) | none; tank | N/A | most of building removed | specific demo requirements attached | |||||
| 9739 | VEHICLE PARKING SHED | AFRL | AFRL | 2200 | 2008 | yes | HARD | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9766 | STORAGE SHED | AFRL | AFRL | 2400 | 2005 | yes | HARD (possibly retain slabs/utilities) | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9768 | GAS MASK REPAIR SHOP | AFRL | AFRL | 1507 | 1991 | yes | HARD (possibly retain slabs/utilities) | none | N/A | SW or SP backfill with Bahia grass established | ||||||
| 9901 | STORAGE at Carrabelle | Carrabelle | Carrabelle | 100 | 1974 | yes | HARD | none | SW or SP backfill with Bahia grass established | 830 Marine St, address | ||||||
| 9911 | Apalachicola Antenna Bldg | Apalachicola | Apalachicola | 108 | 1974 | yes | HARD | none | SW or SP backfill with Bahia grass established | 9911 Appalachee St | ||||||
| 9912 | Apalachicola Antenna Bldg Fence | Apalachicola | Apalachicola | 100 | 1974 | HARD | none | SW or SP backfill with Bahia grass established | ||||||||
| 21381 | PAVILION AT 1381 | Support | Support West | 500 | yes | Future Demo | none | SW or SP backfill with Bahia grass established | ||||||||
| 22280 | SFS URBAN ASSAULT TRAINING RANGE on boy scout road | Sabre | Housing | 1000 | 2016 | HARD (partial) | some, specific demo requirements | SW or SP backfill with Bahia grass established | ||||||||
| 42260 | SEPTIC LAGOON by silver flag | Silver Flag | Silver Flag | 5000 | Unknown | HARD | none | N/A | level berms, remove liner to best of ability, clear and grub and fill to sufficently alleviate hazard to wildlife | 1205 Mississippi Road | ||||||
| 42275 | WASTEWATER TREATMENT LAGOON by 1700 area | Support | Support East | 10000 | HARD | none | N/A | level berms, remove liner to best of ability, clear and grub and fill to sufficently alleviate hazard to wildlife | 708 Farmdale One Rd |