RFIs 1-6 GSI Construction Corp.pdf

PDF 382 KB Posted

Attached to
FA481920R0028 - Construct Wildland Fire Center, Tyndall AFB Federal contract opportunity
Solicitation number
FA481920R0028
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains six responses to requests for information (RFIs) related to Solicitation Number FA481920R0028 for the construction of a Wildland Fire Center at Tyndall Air Force Base in Florida. The RFI responses provide clarification on several aspects of the project, including confirming that utility owners will provide allowances for their work; civil requirements such as oil water separators and soils sampling; acceptance of design changes to the building layout and foundation; and clarification that the utility provider will furnish the pad-mounted transformer and the contractor will pay for and install the service lateral. The responses aim to address contractor questions to facilitate accurate bidding on the set-aside opportunity for Service-Disabled Veteran-Owned Small Businesses, with proposals due by September 16, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to FA481920R0028 - Construct Wildland Fire Center, Tyndall AFB, newest first.
File Type Posted
Sign-in Sheet.pdf PDF
Attachment 03 Appendix B - Drawing and Site Photo - 16 Sept 2020.pdf PDF
Solicitation Amendment FA481920R00280004 SF 30.pdf PDF
Solicitation Amendment FA481920R00280003 SF 30.pdf PDF
Attachment 03 Appendix B - Drawing and Site Photo - 11 Sept 2020.pdf PDF
Solicitation Amendment FA481920R00280002 SF 30.pdf PDF
Solicitation Amendment - FA481920R00280002.pdf PDF
Attachment 02 Appendix A - Scope of Work - 11 September 2020.pdf PDF
RFIs 1-11 Paramount Construction Group.pdf PDF
RFI 1-8 ICMI.pdf PDF
RFIs 1-34 SDVE LLC.pdf PDF
RFI 1 The Lander Group.pdf PDF
Solicitation Amendment FA481920R00280001.pdf PDF
Solicitation Amendment FA481920R00280001 SF 30.pdf PDF
Attachment 05 AF Form 66.xls XLS spreadsheet
Attachment 03 Appendix B - Drawing and Site Photo.pdf PDF
Attachment 08 AF 3065.pdf PDF
Attachment 10 Other Contract Requirements.pdf PDF
Solicitation - FA481920R0028.pdf PDF
Attachment 02 Appendix A - Scope of Work - 10 January 2020.pdf PDF
Attachment 01 SOW - Construct Wildland Fire Center - 10 June 2020.pdf PDF
Attachment 07 AF 3064.pdf PDF
Attachment 09 Sample RFI.PDF PDF
Attachment 04 Wage Determination - Building - Published 21 Feb 2020.pdf PDF
Attachment 06 AF Form 3000.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI #

Date Requested: Potential Cost Impact: Yes: No:

Potential Schedule Impact: Yes: No:

Date Answered:

Request For Information Contract:

Building :

RFI Subject :

Information Requested:

Goverment Response:

Date

Contracting Officer (CO) Date

Requested by:

Answered by:

Contracting Officer Representative (COR)

ISSUE:

The base cannot set an allowance for this line item.

josho Typewritten Text FA481920R0028 - Wildland Fire Center josho Typewritten Text Wild Land Fire Center josho Typewritten Text Utility Owners josho Typewritten Text GSI Const. Corp.

josho Typewritten Text 8/25/2020 josho Typewritten Text X josho Typewritten Text X josho Typewritten Text The RFP states that the utility work will be performed by the utility owners (Base Comm, ECEC, etc), and that the contractor will contract with them. These utility owners are not easy to get a hold of, and when reached, it is difficult to obtain pricing, or the utility requires more project information in order to price. Since only the utility owners can perform their own work, and since they have existing relationships with the base already, can the cost for their work be provided by the base in an allowance?

josho Typewritten Text

Potential Schedule Impact: Yes: No:

Date Answered:

Request For Information Contract:

Building :

RFI Subject :

Information Requested:

Goverment Response:

Date

Contracting Officer (CO) Date

Requested by:

Answered by:

Contracting Officer Representative (COR)

ISSUE:

1. No oil water separator required.

2. No trench drain required.

3. No requirement for sampling for contaminated soils.

4. No requirement for wetland delineation.

5. The bays are drive thru. The driveway is not a part of this scope of work.

josho Typewritten Text FA481920R0028 - Wildland Fire Center josho Typewritten Text Wild Land Fire Center josho Typewritten Text Civil Questions josho Typewritten Text GSI Const. Corp.

josho Typewritten Text 8/27/2020 josho Typewritten Text X josho Typewritten Text josho Typewritten Text

- Is an Oil & Water separator required?

- Is a trench drain required?

- Does the project require soils sampling for contaminated soils?

- if required, is it acceptable for the contractor to provide a unit price for the removal of contaminated soils?

- is a wetland delineation required?

- At the site visit, it was discussed that vehicles should have the ability to drive straight thru the maintenance bays; is the intention to backup vehicles/equipment thru the maintenance bay or will a driveway be required on the backside of building to connect back to main service drive?

josho Typewritten Text

GSI 2

josho

X

Potential Schedule Impact: Yes: No:

Date Answered:

Request For Information Contract:

Building :

RFI Subject :

Information Requested:

Goverment Response:

Date

Contracting Officer (CO) Date

Requested by:

Answered by:

Contracting Officer Representative (COR)

ISSUE:

1. The rectangular building is acceptable in lieu of the L-shape.

2. A design soil bearing pressure will not be provided by the government.

josho Typewritten Text FA481920R0028 - Wildland Fire Center josho Typewritten Text Wild Land Fire Center josho Typewritten Text Structural Questions josho Typewritten Text GSI Const. Corp.

josho Typewritten Text 8/27/2020 josho Typewritten Text X josho Typewritten Text josho Typewritten Text

- Is it acceptable to provide a 46x120 rectangular building instead of the L-shaped structure shown in the SOW?

- Will the government provide a soil bearing design pressure to utilize while pricing foundation costs?

josho Typewritten Text

GSI 3

josho

Potential Schedule Impact: Yes: No:

Date Answered:

Request For Information Contract:

Building :

RFI Subject :

Information Requested:

Goverment Response:

Date

Contracting Officer (CO) Date

Requested by:

Answered by:

Contracting Officer Representative (COR)

ISSUE:

This is not a requirement for this project.

josho Typewritten Text FA481920R0028 - Wildland Fire Center josho Typewritten Text Wild Land Fire Center josho Typewritten Text BIM Questions josho Typewritten Text GSI Const. Corp.

josho Typewritten Text 8/27/2020 josho Typewritten Text X josho Typewritten Text josho Typewritten Text

- Per the USAF Building Information Modeling Minimum Requirements, Version 2.1 (Section D: BIM Goals, Objectives, and Uses), Construction Operations Building Information Exchange (COBie) is required for this project. Section F of the same document also requires the contractor to “deliver COBie data extract in Excel spreadsheet format.” Please confirm this requirement.

josho Typewritten Text

GSI 4

josho

Potential Schedule Impact: Yes: No:

Date Answered:

Request For Information Contract:

Building :

RFI Subject :

Information Requested:

Goverment Response:

Date

Contracting Officer (CO) Date

Requested by:

Answered by:

Contracting Officer Representative (COR)

ISSUE:

1. The parking aprons are 20x120 and 20x60 as called out in the scope.

2. The fire cache is a supply of tools and equipment assembled for use in fire suppression.

3. For purposes of this proposal, use a length of 8'-0".

4. The location of the transformer is identified on the site map in Appendix B.

5. A design analysis is required on the initial design submittal. The need for additional analysis will be based on the completeness of the initial one.

6. The Tyndall IFS is accessible online at http://www.tyndallifs.com/ josho Typewritten Text FA481920R0028 - Wildland Fire Center josho Typewritten Text Wild Land Fire Center josho Typewritten Text Architectural Questions josho Typewritten Text GSI Const. Corp.

josho Typewritten Text 8/27/2020 josho Typewritten Text X josho Typewritten Text josho Typewritten Text

- The RFP calls for concrete aprons to be 20x120 and 20x60 while the concept drawings show both to be 20x120. Please conform the correct sizes.

- Can the Gov specify what materials will be stored in fire cache?

- Will the Gov consider installing ceilings at 8" AFF instead of 9' AFF?

- Can the gov specify length of break counter/cabinetry for pricing?

- Can the Gov provide location of nearest MH/HH?

- Is a Design Analysis Required with each deliverable?

- Will the Gov please provide a copy of the Tyndall AFB Architectural Design Facility Standards?

josho Typewritten Text

GSI 5

josho

Potential Schedule Impact: Yes: No:

Date Answered:

Request For Information Contract:

Building :

RFI Subject :

Information Requested:

Goverment Response:

Date

Contracting Officer (CO) Date

Requested by:

Answered by:

Contracting Officer Representative (COR)

ISSUE:

1. Yes, GCEC will provide the pad mounted transformer.

2. The contractor will pay through this contract.

3. The contractor will install the service lateral.

josho Typewritten Text FA481920R0028 - Wildland Fire Center josho Typewritten Text Wild Land Fire Center josho Typewritten Text Electrical Questions josho Typewritten Text GSI Const. Corp.

josho Typewritten Text 8/27/2020 josho Typewritten Text X josho Typewritten Text josho Typewritten Text

- SOW 2.1.2 Electrical "The contractor shall coordinate with Tyndall AFB private utility supplier, GCEC, who will provide the electrical service."

* Will GCEC provide the pad mounted transformer?

* Who will pay for the pad mounted transformer?

* Who will install the service lateral from the pad mounted transformer to the new building?

josho Typewritten Text

GSI 6

josho

Attachment 09 Prebid RFI - utility owner allowance
Attachment 09 Prebid RFI - Civil Questions
Attachment 09 Prebid RFI - Structural Questions
Attachment 09 Prebid RFI - BIM Questions
Attachment 09 Prebid RFI - Architectural Questions
Attachment 09 Prebid RFI - Electrical Questions
2020-09-03T12:02:58-0500
JACKSON.STEVAN.F.1151007313
2020-09-03T12:03:48-0500
JACKSON.STEVAN.F.1151007313
2020-09-03T12:04:17-0500
JACKSON.STEVAN.F.1151007313
2020-09-03T12:04:50-0500
JACKSON.STEVAN.F.1151007313
2020-09-03T12:05:29-0500
JACKSON.STEVAN.F.1151007313
2020-09-03T12:06:02-0500
JACKSON.STEVAN.F.1151007313

File details come from the government source that posted it. Updated .