About this file

This document contains a request for proposal for the construction of a Wildland Fire Center at Tyndall Air Force Base in Florida. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must provide an electronic proposal by email no later than September 16, 2020. The proposal should include all information required by the RFP and be titled "Construct Wildland Fire Center FA481920R0028." A site visit will be held on August 26, 2020 for offerors to bring up to two personnel each. Questions are due by August 31, 2020 and proposals by September 16, 2020. The construction must include a maintenance bay that is not required to use a specific type of heater. All other details of the facility design are the responsibility of the offeror's designer of record.

View the file

Other files for this federal contract opportunity

Other files attached to FA481920R0028 - Construct Wildland Fire Center, Tyndall AFB, newest first.
File Type Posted
Sign-in Sheet.pdf PDF
Attachment 03 Appendix B - Drawing and Site Photo - 16 Sept 2020.pdf PDF
Solicitation Amendment FA481920R00280004 SF 30.pdf PDF
Solicitation Amendment FA481920R00280003 SF 30.pdf PDF
Attachment 03 Appendix B - Drawing and Site Photo - 11 Sept 2020.pdf PDF
Solicitation Amendment FA481920R00280002 SF 30.pdf PDF
Solicitation Amendment - FA481920R00280002.pdf PDF
Attachment 02 Appendix A - Scope of Work - 11 September 2020.pdf PDF
RFIs 1-11 Paramount Construction Group.pdf PDF
RFI 1 The Lander Group.pdf PDF
RFI 1-8 ICMI.pdf PDF
RFIs 1-6 GSI Construction Corp.pdf PDF
Solicitation Amendment FA481920R00280001 SF 30.pdf PDF
Solicitation Amendment FA481920R00280001.pdf PDF
Attachment 05 AF Form 66.xls XLS spreadsheet
Attachment 03 Appendix B - Drawing and Site Photo.pdf PDF
Attachment 08 AF 3065.pdf PDF
Attachment 10 Other Contract Requirements.pdf PDF
Solicitation - FA481920R0028.pdf PDF
Attachment 04 Wage Determination - Building - Published 21 Feb 2020.pdf PDF
Attachment 06 AF Form 3000.pdf PDF
Attachment 02 Appendix A - Scope of Work - 10 January 2020.pdf PDF
Attachment 01 SOW - Construct Wildland Fire Center - 10 June 2020.pdf PDF
Attachment 07 AF 3064.pdf PDF
Attachment 09 Sample RFI.PDF PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following RFIs were submitted in the form on an email and were transcribed directly from the email.

SSG Bracy, please see questions below pertaining to this project. Thanks!

1. What signage is to be provided for the build?

ANSWER: No job sign required.

2. Cabinet drawings?

ANSWER: This is the responsibility of the contractor’s Designer of Record.

3. Do we need to submit an erosion control plan?

ANSWER: Yes

4. Do we have to design the slab?

ANSWER: Yes

5. Wall outlet locations and quantity?

ANSWER: This is the responsibility of the contractor’s Designer of Record.

6. Distance to proposed new sewer tank?

ANSWER: Approximately 250 feet.

7. Distance to new transformer?

ANSWER: Approximately 200 feet

8. Distance to tie into water main?

ANSWER: Approximately 200 feet

9. Will roll up doors need glass in them?

ANSWER: No

10. Will there be a ft per second on speed of roll up doors (in case of fire emergency)?

ANSWER: No

11. What is the required thickness of insulation in metal building walls?

ANSWER: This is the responsibility of the contractor’s Designer of Record.

12. Will the interior doors require lite kits?

ANSWER: No

13. Will the exterior doors require lite kits?

ANSWER: Yes

14. What gauge metal is required for the metal building?

ANSWER: This is the responsibility of the contractor’s Designer of Record

15. Who will establish finish grade?

ANSWER: This is the responsibility of the contractor’s Designer of Record

16. What are the window locations?

ANSWER: Offices

17. Where will the power box be located on building?

ANSWER: This is the responsibility of the contractor’s Designer of Record

18. Other than at the roll up doors and corners of the building, where else will bollards need to be placed?

ANSWER: This is the responsibility of the contractor’s Designer of Record

19. Where will wall packs be located on the exterior of the building? Is there a spacing recommendation?

ANSWER: This is the responsibility of the contractor’s Designer of Record

20. Are bathrooms unisex?

ANSWER: Yes

21. Will bathrooms need to be ADA compliant?

ANSWER: Yes

22. How does the communication conduit to be ran? In the concrete or along the walls?

ANSWER: This is the responsibility of the contractor’s Designer of Record

23. Will there be a mop sink?

ANSWER: Yes

24. Will a shower be required?

ANSWER: Yes

25. Bathroom mirrors: type, size, number & location?

ANSWER: This is the responsibility of the contractor’s Designer of Record

26. Grab bars: type & if required?

ANSWER: This is the responsibility of the contractor’s Designer of Record

27. Toilets: type, location, auto flush?

ANSWER: This is the responsibility of the contractor’s Designer of Record

28. Bathroom sinks: type, location?

ANSWER: This is the responsibility of the contractor’s Designer of Record

29. Bathroom sink fixtures: type, automatic?

ANSWER: This is the responsibility of the contractor’s Designer of Record

30. Urinals: number & location?

ANSWER: None

31. Will storm drains be part of this contract?

ANSWER: No

32. Is there an option to price an alternate roof other than a standing seam?

ANSWER: Yes

33. Is there a required HVAC system?

ANSWER: Yes, TRANE

34. Is there a required type of heater to be installed in the maintenance bay?

ANSWER: No

JACKSON.STEVAN.F.115

1007313

Digitally signed by

JACKSON.STEVAN.F.1151007313

Date: 2020.09.03 11:02:54 -05'00'

2020-09-08T14:55:22-0500
SANDERS.MELISSA.L.1056026831

File details come from the government source that posted it. Updated .