This document contains a request for proposal for the construction of a Wildland Fire Center at Tyndall Air Force Base in Florida. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must provide an electronic proposal by email no later than September 16, 2020. The proposal should include all information required by the RFP and be titled "Construct Wildland Fire Center FA481920R0028." A site visit will be held on August 26, 2020 for offerors to bring up to two personnel each. Questions are due by August 31, 2020 and proposals by September 16, 2020. The construction must include a maintenance bay that is not required to use a specific type of heater. All other details of the facility design are the responsibility of the offeror's designer of record.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The following RFIs were submitted in the form on an email and were transcribed directly from the email.
SSG Bracy, please see questions below pertaining to this project. Thanks!
1. What signage is to be provided for the build?
ANSWER: No job sign required.
2. Cabinet drawings?
ANSWER: This is the responsibility of the contractor’s Designer of Record.
3. Do we need to submit an erosion control plan?
ANSWER: Yes
4. Do we have to design the slab?
ANSWER: Yes
5. Wall outlet locations and quantity?
ANSWER: This is the responsibility of the contractor’s Designer of Record.
6. Distance to proposed new sewer tank?
ANSWER: Approximately 250 feet.
7. Distance to new transformer?
ANSWER: Approximately 200 feet
8. Distance to tie into water main?
ANSWER: Approximately 200 feet
9. Will roll up doors need glass in them?
ANSWER: No
10. Will there be a ft per second on speed of roll up doors (in case of fire emergency)?
ANSWER: No
11. What is the required thickness of insulation in metal building walls?
ANSWER: This is the responsibility of the contractor’s Designer of Record.
12. Will the interior doors require lite kits?
ANSWER: No
13. Will the exterior doors require lite kits?
ANSWER: Yes
14. What gauge metal is required for the metal building?
ANSWER: This is the responsibility of the contractor’s Designer of Record
15. Who will establish finish grade?
ANSWER: This is the responsibility of the contractor’s Designer of Record
16. What are the window locations?
ANSWER: Offices
17. Where will the power box be located on building?
ANSWER: This is the responsibility of the contractor’s Designer of Record
18. Other than at the roll up doors and corners of the building, where else will bollards need to be placed?
ANSWER: This is the responsibility of the contractor’s Designer of Record
19. Where will wall packs be located on the exterior of the building? Is there a spacing recommendation?
ANSWER: This is the responsibility of the contractor’s Designer of Record
20. Are bathrooms unisex?
ANSWER: Yes
21. Will bathrooms need to be ADA compliant?
ANSWER: Yes
22. How does the communication conduit to be ran? In the concrete or along the walls?
ANSWER: This is the responsibility of the contractor’s Designer of Record
23. Will there be a mop sink?
ANSWER: Yes
24. Will a shower be required?
ANSWER: Yes
25. Bathroom mirrors: type, size, number & location?
ANSWER: This is the responsibility of the contractor’s Designer of Record
26. Grab bars: type & if required?
ANSWER: This is the responsibility of the contractor’s Designer of Record
27. Toilets: type, location, auto flush?
ANSWER: This is the responsibility of the contractor’s Designer of Record
28. Bathroom sinks: type, location?
ANSWER: This is the responsibility of the contractor’s Designer of Record
29. Bathroom sink fixtures: type, automatic?
ANSWER: This is the responsibility of the contractor’s Designer of Record
30. Urinals: number & location?
ANSWER: None
31. Will storm drains be part of this contract?
ANSWER: No
32. Is there an option to price an alternate roof other than a standing seam?
ANSWER: Yes
33. Is there a required HVAC system?
ANSWER: Yes, TRANE
34. Is there a required type of heater to be installed in the maintenance bay?
ANSWER: No
JACKSON.STEVAN.F.115
1007313
Digitally signed by
JACKSON.STEVAN.F.1151007313
Date: 2020.09.03 11:02:54 -05'00'
| 2020-09-08T14:55:22-0500 | |
| SANDERS.MELISSA.L.1056026831 |
File details come from the government source that posted it. Updated .