Pricing Sheet_19-8114 Repair Docks Basewide.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Repair Base Boardwalks
Solicitation number
FA481920R0021
Issued by

About this file

This document includes a pricing sheet and solicitation for a federal contract opportunity to repair base boardwalks. The solicitation requests proposals to repair boardwalks at Tyndall Beach and Crooked Island beaches on Tyndall Air Force Base. Interested women-owned small businesses should provide pricing details using the template sheet to repair and replace decking, railings, supporting structures, and related materials. Proposals are due by August 31, 2020. A site visit will be held on August 7, 2020 for interested parties to attend. The work is set aside for women-owned small businesses. The soliciting agency is the Department of the Air Force Air Combat Command. Questions are due by August 14, 2020.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TBBW

2.3.1 GENERAL CONDITIONSSECTION SUB TOTAL$ - 0
GENERAL CONDITIONSSUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1Mobilization/DemobilizationA mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.JOB$ - 0
2Equipment RentalAll costs associated with equipment rental to accomplish the work.Month$ - 0
3SuperintendenceAll costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.DAY$ - 0

2.3.1 a DESIGN & PROFESSIONAL SERVICES SECTION SUB TOTAL $ - 0

DESIGN & PROFESSIONAL SERVICESSUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1Professional ServicesAll costs associated with professional services to enable design and construction such as assessments, surveys, permitting, testing, etcJOB$ - 0
2DesignAll costs associated with professional design and construction document creationJOB$ - 0
3Project ManagementAll Costs associated with project managementJOB$ - 0

2.3.1 b DEMOLITION SECTION SUB TOTAL $ - 0

BOARDWALK, PHONE STATIONS, PAVILION (DEMOLITION)SUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1Deck (Walking Surface)Removal of the deck boards and various associated harware.SF$ - 0
2RailingRemoval of the existing railingLF$ - 0
3Deck Supporting StructureRemoval of the deck supporting structure and associated harware.SF$ - 0
4DisposalDisposal of waste materialsCY$ - 0

2.3.1 c CONSTRUCTION SECTION SUB TOTAL $ - 0

BOARDWALK, PHONE STATIONS, PAVILION (CONSTRUCTION)SUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1PT PilesProvide and install timber pilesERROR:#REF!$ - 0
2Supporting StructureProvide and Install the deck & pavilion supporting structure and associated harware.SF$ - 0
3Deck (Walking Surface)Provide and Install precast deck.SF$ - 0
4RailingProvide and Install new railing.LF$ - 0
5RoofProvide and Install new roof framing & standing seem metal roof.SQ$ - 0
6Phone StationProvide and install phone hardware and signageEA$ - 0
$ - 0

PROJECT SUBTOTAL = $ - 0

OVERHEAD, PROFIT, BONDSUB TOT:$ - 0
LINE ITEMDESCRIPTION%TOTALNotes
001OverheadOverhead Costs
002ProfitProfit
003BondActual Bond

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) = $ - 0

CONTRACTOR PERIOD OF PERFORMANCE =Days
POP Design =Days
POP Construction =Days

Pricing Schedule &"-,Bold"&20 2.3.1 TASK 1 XLWU 19-8114 Repair Base Boardwalks &"-,Bold"Tyndall Beach Boardwalk, B11300 &"-,Bold"Contractor Name: _______________________________ Date:_______________________________

&"-,Italic"PRICING SCHEDULE TASK 1 &"-,Regular"

T1

2.2.4 EQUIPMENT RENTAL ( ITEMIZED LIST )SUB TOT$0.00
RENTAL DESCRIPTIONUNITQUANTITYUNIT COSTTOTAL
ex.(Example) 40' Straight Boom Manlift (Sunbelt Rentals)MONTH12,180.00$ 2,180.00
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16$ - 0
17$ - 0
18$ - 0
19$ - 0
20$ - 0
OTHER PROJECT NOTES FOR BIDSUB TOT$ - 0
DESCRIPTIONUNITQUANTITYUNIT COSTTOTAL
ex.(Example) 40' Straight Boom Manlift (Sunbelt Rentals)MONTH12,180.00$ 2,180.00
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16$ - 0
17$ - 0
18$ - 0
19$ - 0
20$ - 0

&"-,Bold"&18PRICING SCHEDULE

2.3.1 TASK 1 &"-,Bold"&16XLWU 19-8114

Repair Base Boardwalks Tyndall Beach Boardwalk, B11300 &16

&14DATE: ______________________________&16

Note: Provide additional pages as needed

PRICING SCHEDULE TASK 1

BID CIBW (ext)

2.3.2 GENERAL CONDITIONSSECTION SUB TOTAL$ - 0
GENERAL CONDITIONSSUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1Mobilization/DemobilizationA mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.JOB$ - 0
2Equipment RentalAll costs associated with equipment rental to accomplish the work.Month$ - 0
3SuperintendenceAll costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.DAY$ - 0

2.3.2 a DESIGN & PROFESSIONAL SERVICES SECTION SUB TOTAL $ - 0

DESIGN & PROFESSIONAL SERVICESSUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1Professional ServicesAll costs associated with professional services to enable design and construction such as assessments, surveys, permitting, testing, etcJOB$ - 0
2DesignAll costs associated with professional design and construction document creationJOB$ - 0
3Project ManagementAll Costs associated with project managementJOB$ - 0

2.3.2 b DEMOLITION SECTION SUB TOTAL $ - 0

BOARDWALK, RAMPS (DEMOLITION)SUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1Deck (Walking Surface)Removal of the deck boards and various associated harware.SF$ - 0
2RailingRemoval of the existing railingLF$ - 0
3Deck Supporting StructureRemoval of the deck supporting structure and associated harware.SF$ - 0
4DisposalDisposal of waste materialsCY$ - 0

2.3.2 c CONSTRUCTION SECTION SUB TOTAL $ - 0

BOARDWALK, PHONE STATIONS, PAVILION (CONSTRUCTION)SUB TOT$ - 0
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
1PT PilesProvide and install timber pilesLF$ - 0
2Supporting StructureProvide and Install the deck supporting structure and associated harware.SF$ - 0
3Deck (Walking Surface)Provide and Install precast deck.SF$ - 0
4RailingProvide and Install new railing.LF$ - 0
$ - 0
$ - 0

PROJECT SUBTOTAL = $ - 0

OVERHEAD, PROFIT, BONDSUB TOT:$ - 0
LINE ITEMDESCRIPTION%TOTALNotes
001OverheadOverhead Costs$ - 0
002ProfitProfit$ - 0
003BondActual Bond$ - 0

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) = $ - 0

CONTRACTOR PERIOD OF PERFORMANCE =Days
Design =Days
Construction =Days

Pricing Schedule &"-,Bold"&20 2.3.2 TASK 2 XLWU 19-8114 Repair Base Boardwalks &"-,Bold"Crooked Island Beach Boardwalk &"-,Bold"Contractor Name: _______________________________ Date:_______________________________&"-,Regular"

&"-,Italic"PRICING SCHEDULE TASK 2 &"-,Regular"

T2

2.2.4 EQUIPMENT RENTAL ( ITEMIZED LIST )SUB TOT$0.00
RENTAL DESCRIPTIONUNITQUANTITYUNIT COSTTOTAL
ex.(Example) 40' Straight Boom Manlift (Sunbelt Rentals)MONTH12,180.00$ 2,180.00
1
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16$ - 0
17$ - 0
18$ - 0
19$ - 0
20$ - 0
OTHER PROJECT NOTES FOR BIDSUB TOT$0.00
DESCRIPTIONUNITQUANTITYUNIT COSTTOTAL
ex.(Example) 40' Straight Boom Manlift (Sunbelt Rentals)MONTH12,180.00$ 2,180.00
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16$ - 0
17$ - 0
18$ - 0

&"-,Bold"&18PRICING SCHEDULE

2.3.2 TASK 2 &"-,Bold"&16XLWU 19-8114

Repair Base Boardwalks Crooked Island Beach Boardwalk &16

&14DATE: ______________________________&16

Note: Provide additional pages as needed

PRICING SCHEDULE TASK 2

File details come from the government source that posted it. Updated .