Attachment 7 AF 66.pdf

PDF 284 KB Posted

Attached to
Repair Base Boardwalks
Solicitation number
FA481920R0021
Issued by

About this file

This solicitation requests proposals for the repair of base boardwalks at Tyndall Air Force Base in Florida. The opportunity is set aside for women-owned small businesses. Offerors must submit an electronic copy of their proposal and all required information by email no later than August 31, 2020. A site visit will be held on August 7, 2020 for up to two personnel from each offeror. Questions are due by August 14 and shall be submitted to the points of contact listed, who are with the 325th Contracting Organization and 325th Civil Engineering Squadron. The work includes repairing existing boardwalks as outlined in the requirement documents.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19-8114

BASE BOARDWALKS

AF FORM 66 SCHEDULE OF

MATERIAL SUBMITTALS

PROJECT NUMBER SOLICITATION/CONTRACT NO.

FA4819-20-C-XXXX

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

E

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E R

'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

A S

-B U

IL

T

D R

A W

IN

G

S

D

IS

K

D O

C U

M E

N T

A T

IO

N

A S

R E

Q U

IR

E

D

R E

Q U

IR

D

U

B M

IS

S

IO

N

D A

T E

D A

T

C

E

IV

E D

I N

C

O N

T R

A C

T

IN

G

D A

T E

T O

C

IV

IL

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

1 Design Charrette NA

2 Meeting Minutes (All Meetings) Meeting + 2

Days

3 Contractor Badging Applications Award + 14

Days

4 Project Schedule - AF Form 3064 NTP + 14 Days

5 35% Design Submittal NTP + 45 Days

6 95% Design Submittal NTP + 75 Days

7 100% Design Submittal NTP + 90 Days

Work Clearance Request / Digging Permit - AF

Form 103

10 Days Prior to Commencing

Work

9 HAZMAT Inventory Form 81 & 82 14 Days Prior to

Commencing Work

Progress Report - AF Form 3065 Weekly

Material Approval - AF Form 3000 1 1 1 1 5 Days Prior to

Order

Regulatory Permit Application

Prior to submitting to

Permitting Agency

Construction Materials Testing Reports Upon Receipt

Welding/Burn Permit - As Required Prior to

Commencing Work

Draft DD 1354 - Transfer & Acceptance of Military Real Property

NTP + 90 Days

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT TITLE

XLWU 19-8114 REPAIR BASE BOARDWALKS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

1 1

AF Form 66

PROJECT NUMBER SOLICITATION/CONTRACT NO.

FA4819-20-C-XXXX

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

E

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E R

'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

A S

-B U

IL

T

D R

A W

IN

G

S

D

IS

K

D O

C U

M E

N T

A T

IO

N

Q U

IR

E

D

R E

Q U

IR

U

B M

IS

S

IO

N

D A

T E

D A

T

C

E

IV

E D

I

C

N

T R

A C

T

IN

G

D A

T E

T O

C

IV

IL

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

T

E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT TITLE

XLWU 19-8114 REPAIR BASE BOARDWALKS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Pre-Final Inspection Report Pre-Final + 3

Days

Contractor Environmental Reporting Entry - TAFB Form 83

Prior to Final Inspection

Equipment Manuals and Parts Lists Prior to Final

Inspection

Final DD 1354 - Transfer & Acceptance of Military Real Property

At Final Inspection

Final Inspection Report Final

Inspection + 5 Days

As-Built Drawings Final

Inspection + 7 Days

Project Close Out Documents 1 Final

Inspection + 7 Days