Attachment 5 Pricing Schedule.pdf

PDF 310 KB Posted

Attached to
Repair Base Boardwalks
Solicitation number
FA481920R0021
Issued by

About this file

This document contains a pricing schedule and solicitation for a federal contract opportunity to repair base boardwalks at Tyndall Air Force Base in Florida. The pricing schedule details line items for mobilization, equipment rental, superintendence, professional services including design and project management, demolition of existing structures, construction of new decking, railings, supporting structures, and disposal. It requests unit pricing for various tasks to repair boardwalks at Tyndall Beach and Crooked Island Beach, including quantities, unit costs, and totals. The related solicitation is set aside for women-owned small businesses, with questions due by August 14th and proposals due by August 31st 2020. The site visit will take place on August 7th. The work will be awarded under solicitation number FA481920R0021 by the Department of the Air Force Air Combat Command to repair base boardwalks at Tyndall Air Force Base.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19-8114

BASE BOARDWALKS

CONTRACTOR

PRICING SCHEDULE

Pricing Schedule

2.3.1 TASK 1

XLWU 19‐8114

Repair Base Boardwalks Tyndall Beach Boardwalk, B11300

Contractor Name: _______________________________

Date:_______________________________

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 Mobilization/Demobilization JOB ‐$

2 Equipment Rental Month ‐$

3 Superintendence DAY ‐$

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 Professional Services JOB ‐$

2 Design JOB ‐$

3 Project Management ‐$

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 Deck (Walking Surface) SF ‐$

2 Railing LF ‐$

3 Deck Supporting Structure SF ‐$

4 Disposal CY ‐$

2.3.1 c CONSTRUCTION SECTION SUB TOTAL

2.3.1 b DEMOLITION SECTION SUB TOTAL

BOARDWALK, PHONE STATIONS, PAVILION (DEMOLITION)

DESCRIPTION

Removal of the deck boards and various associated harware.

Removal of the existing railing

Removal of the deck supporting structure and associated harware.

Disposal of waste materials

All Costs associated with project management

All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.

2.3.1 a DESIGN & PROFESSIONAL SERVICES

DESIGN & PROFESSIONAL SERVICES

DESCRIPTION

All costs associated with professional services to enable design and construction such as assessments, surveys, permitting, testing, etc

All costs associated with professional design and construction document creation

SECTION SUB TOTAL

All costs associated with equipment rental to accomplish the work.

2.3.1 GENERAL CONDITIONS SECTION SUB TOTAL

GENERAL CONDITIONS

DESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.

PRICING SCHEDULE TASK 1 1 of 2

XLWU 19‐8114

Repair Base Boardwalks Tyndall Beach Boardwalk, B11300

Contractor Name: _______________________________

Date:_______________________________

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 PT Piles LF ‐$

2 Supporting Structure SF ‐$

3 Deck (Walking Surface) SF ‐$

4 Railing LF ‐$

5 Roof SQ ‐$

SUB TOT:

LINE ITEM % TOTAL Notes

001 Overhead

002 Profit

003 Bond

Days

POP Design = Days POP Construction = Days

Overhead Costs

Profit

Actual Bond

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =

CONTRACTOR PERIOD OF PERFORMANCE =

PROJECT SUBTOTAL =

OVERHEAD, PROFIT, BOND ‐$

DESCRIPTION

BOARDWALK, PHONE STATIONS, PAVILION (CONSTRUCTION)

DESCRIPTION

Provide and install timber piles

Provide and Install the deck & pavilion supporting structure and associated harware.

Provide and Install precast deck.

Provide and Install new railing.

Provide and Install new roof framing & standing seem metal roof.

PRICING SCHEDULE TASK 1 2 of 2

XLWU 19‐8114

Repair Base Boardwalks

Tyndall Beach Boardwalk, B11300

DATE: ______________________________

2.2.4 EQUIPMENT RENTAL ( ITEMIZED LIST )

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 $

2 ‐$

3 ‐$

4 ‐$

5 ‐$

6 ‐$

7 ‐$

8 ‐$

9 ‐$

10 ‐$

11 ‐$

12 ‐$

13 ‐$

14 ‐$

15 ‐$

16 ‐$

17 ‐$

18 ‐$

19 ‐$

20 ‐$

OTHER PROJECT NOTES FOR BID

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 ‐$

2 ‐$

3 ‐$

4 ‐$

5 ‐$

6 ‐$

7 ‐$

8 ‐$

9 ‐$

10 ‐$

11 ‐$

12 ‐$

13 ‐$

14 ‐$

15 ‐$

16 ‐$

17 ‐$

18 ‐$

19 ‐$

20 ‐$

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

SUB TOT

RENTAL DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

Note: Provide additional pages as needed PRICING SCHEDULE TASK 1 3 of 3

2.3.2 TASK 2

XLWU 19‐8114

Repair Base Boardwalks Crooked Island Beach Boardwalk

Contractor Name: _______________________________

Date:_______________________________

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 Mobilization/Demobilization JOB ‐$

2 Equipment Rental Month ‐$

3 Superintendence DAY ‐$

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 Professional Services JOB ‐$

2 Design JOB ‐$

3 Project Management ‐$

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 Deck (Walking Surface) SF ‐$

2 Railing LF ‐$

3 Deck Supporting Structure SF ‐$

4 Disposal CY ‐$

2.3.2 b DEMOLITION SECTION SUB TOTAL

BOARDWALK, RAMPS (DEMOLITION)

DESCRIPTION

Removal of the deck boards and various associated harware.

Removal of the existing railing

Removal of the deck supporting structure and associated harware.

Disposal of waste materials

All Costs associated with project management

All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.

2.3.2 a DESIGN & PROFESSIONAL SERVICES

DESIGN & PROFESSIONAL SERVICES

DESCRIPTION

All costs associated with professional services to enable design and construction such as assessments, surveys, permitting, testing, etc

All costs associated with professional design and construction document creation

SECTION SUB TOTAL

All costs associated with equipment rental to accomplish the work.

2.3.2 GENERAL CONDITIONS SECTION SUB TOTAL

GENERAL CONDITIONS

DESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.

PRICING SCHEDULE TASK 2 1 of 2

XLWU 19‐8114

Repair Base Boardwalks Crooked Island Beach Boardwalk

Contractor Name: _______________________________

Date:_______________________________

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

1 PT Piles LF ‐$

2 Supporting Structure SF ‐$

3 Deck (Walking Surface) SF ‐$

4 Railing LF ‐$

5 Phone Station EA ‐$

SUB TOT:

LINE ITEM % TOTAL Notes

001 Overhead ‐$

002 Profit ‐$

003 Bond ‐$

180 Days

Design = 90 Construction = 90

Overhead Costs

Profit

Actual Bond

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =

CONTRACTOR PERIOD OF PERFORMANCE =

PROJECT SUBTOTAL =

OVERHEAD, PROFIT, BOND ‐$

DESCRIPTION

2.3.2 c CONSTRUCTION SECTION SUB TOTAL

BOARDWALK, PHONE STATIONS, PAVILION (CONSTRUCTION)

DESCRIPTION

Provide and install timber piles

Provide and Install the deck supporting structure and associated harware.

Provide and Install precast deck.

Provide and Install new railing.

Povide and install phone hardware & sign.

PRICING SCHEDULE TASK 2 2 of 2

XLWU 19‐8114

Repair Base Boardwalks

Crooked Island Beach Boardwalk

DATE: ______________________________

2.2.4 EQUIPMENT RENTAL ( ITEMIZED LIST )

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 $

2 ‐$

3 ‐$

4 ‐$

5 ‐$

6 ‐$

7 ‐$

8 ‐$

9 ‐$

10 ‐$

11 ‐$

12 ‐$

13 ‐$

14 ‐$

15 ‐$

16 ‐$

17 ‐$

18 ‐$

19 ‐$

20 ‐$

OTHER PROJECT NOTES FOR BID

UNIT QUANTITY UNIT COST TOTAL

ex. MONTH 1 2,180.00 2,180.00$

1 ‐$

2 ‐$

3 ‐$

4 ‐$

5 ‐$

6 ‐$

7 ‐$

8 ‐$

9 ‐$

10 ‐$

11 ‐$

12 ‐$

13 ‐$

14 ‐$

15 ‐$

16 ‐$

17 ‐$

18 ‐$

19 ‐$

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

SUB TOT

RENTAL DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

Note: Provide additional pages as needed PRICING SCHEDULE TASK 2 3 of 3

File details come from the government source that posted it. Updated .