This document contains a pricing schedule and solicitation for a federal contract opportunity to repair base boardwalks at Tyndall Air Force Base in Florida. The pricing schedule details line items for mobilization, equipment rental, superintendence, professional services including design and project management, demolition of existing structures, construction of new decking, railings, supporting structures, and disposal. It requests unit pricing for various tasks to repair boardwalks at Tyndall Beach and Crooked Island Beach, including quantities, unit costs, and totals. The related solicitation is set aside for women-owned small businesses, with questions due by August 14th and proposals due by August 31st 2020. The site visit will take place on August 7th. The work will be awarded under solicitation number FA481920R0021 by the Department of the Air Force Air Combat Command to repair base boardwalks at Tyndall Air Force Base.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19-8114
BASE BOARDWALKS
CONTRACTOR
PRICING SCHEDULE
Pricing Schedule
2.3.1 TASK 1
XLWU 19‐8114
Repair Base Boardwalks Tyndall Beach Boardwalk, B11300
Contractor Name: _______________________________
Date:_______________________________
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 Mobilization/Demobilization JOB ‐$
2 Equipment Rental Month ‐$
3 Superintendence DAY ‐$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 Professional Services JOB ‐$
2 Design JOB ‐$
3 Project Management ‐$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 Deck (Walking Surface) SF ‐$
2 Railing LF ‐$
3 Deck Supporting Structure SF ‐$
4 Disposal CY ‐$
2.3.1 c CONSTRUCTION SECTION SUB TOTAL
2.3.1 b DEMOLITION SECTION SUB TOTAL
BOARDWALK, PHONE STATIONS, PAVILION (DEMOLITION)
DESCRIPTION
Removal of the deck boards and various associated harware.
Removal of the existing railing
Removal of the deck supporting structure and associated harware.
Disposal of waste materials
All Costs associated with project management
All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.
2.3.1 a DESIGN & PROFESSIONAL SERVICES
DESIGN & PROFESSIONAL SERVICES
DESCRIPTION
All costs associated with professional services to enable design and construction such as assessments, surveys, permitting, testing, etc
All costs associated with professional design and construction document creation
SECTION SUB TOTAL
All costs associated with equipment rental to accomplish the work.
2.3.1 GENERAL CONDITIONS SECTION SUB TOTAL
GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
PRICING SCHEDULE TASK 1 1 of 2
XLWU 19‐8114
Repair Base Boardwalks Tyndall Beach Boardwalk, B11300
Contractor Name: _______________________________
Date:_______________________________
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 PT Piles LF ‐$
2 Supporting Structure SF ‐$
3 Deck (Walking Surface) SF ‐$
4 Railing LF ‐$
5 Roof SQ ‐$
SUB TOT:
LINE ITEM % TOTAL Notes
001 Overhead
002 Profit
003 Bond
Days
POP Design = Days POP Construction = Days
Overhead Costs
Profit
Actual Bond
PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =
CONTRACTOR PERIOD OF PERFORMANCE =
PROJECT SUBTOTAL =
OVERHEAD, PROFIT, BOND ‐$
DESCRIPTION
BOARDWALK, PHONE STATIONS, PAVILION (CONSTRUCTION)
DESCRIPTION
Provide and install timber piles
Provide and Install the deck & pavilion supporting structure and associated harware.
Provide and Install precast deck.
Provide and Install new railing.
Provide and Install new roof framing & standing seem metal roof.
PRICING SCHEDULE TASK 1 2 of 2
XLWU 19‐8114
Repair Base Boardwalks
Tyndall Beach Boardwalk, B11300
DATE: ______________________________
2.2.4 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY UNIT COST TOTAL
ex. MONTH 1 2,180.00 2,180.00$
1 $
2 ‐$
3 ‐$
4 ‐$
5 ‐$
6 ‐$
7 ‐$
8 ‐$
9 ‐$
10 ‐$
11 ‐$
12 ‐$
13 ‐$
14 ‐$
15 ‐$
16 ‐$
17 ‐$
18 ‐$
19 ‐$
20 ‐$
OTHER PROJECT NOTES FOR BID
UNIT QUANTITY UNIT COST TOTAL
ex. MONTH 1 2,180.00 2,180.00$
1 ‐$
2 ‐$
3 ‐$
4 ‐$
5 ‐$
6 ‐$
7 ‐$
8 ‐$
9 ‐$
10 ‐$
11 ‐$
12 ‐$
13 ‐$
14 ‐$
15 ‐$
16 ‐$
17 ‐$
18 ‐$
19 ‐$
20 ‐$
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
SUB TOT
SUB TOT
RENTAL DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
Note: Provide additional pages as needed PRICING SCHEDULE TASK 1 3 of 3
2.3.2 TASK 2
XLWU 19‐8114
Repair Base Boardwalks Crooked Island Beach Boardwalk
Contractor Name: _______________________________
Date:_______________________________
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 Mobilization/Demobilization JOB ‐$
2 Equipment Rental Month ‐$
3 Superintendence DAY ‐$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 Professional Services JOB ‐$
2 Design JOB ‐$
3 Project Management ‐$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 Deck (Walking Surface) SF ‐$
2 Railing LF ‐$
3 Deck Supporting Structure SF ‐$
4 Disposal CY ‐$
2.3.2 b DEMOLITION SECTION SUB TOTAL
BOARDWALK, RAMPS (DEMOLITION)
DESCRIPTION
Removal of the deck boards and various associated harware.
Removal of the existing railing
Removal of the deck supporting structure and associated harware.
Disposal of waste materials
All Costs associated with project management
All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.
2.3.2 a DESIGN & PROFESSIONAL SERVICES
DESIGN & PROFESSIONAL SERVICES
DESCRIPTION
All costs associated with professional services to enable design and construction such as assessments, surveys, permitting, testing, etc
All costs associated with professional design and construction document creation
SECTION SUB TOTAL
All costs associated with equipment rental to accomplish the work.
2.3.2 GENERAL CONDITIONS SECTION SUB TOTAL
GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
PRICING SCHEDULE TASK 2 1 of 2
XLWU 19‐8114
Repair Base Boardwalks Crooked Island Beach Boardwalk
Contractor Name: _______________________________
Date:_______________________________
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
1 PT Piles LF ‐$
2 Supporting Structure SF ‐$
3 Deck (Walking Surface) SF ‐$
4 Railing LF ‐$
5 Phone Station EA ‐$
SUB TOT:
LINE ITEM % TOTAL Notes
001 Overhead ‐$
002 Profit ‐$
003 Bond ‐$
180 Days
Design = 90 Construction = 90
Overhead Costs
Profit
Actual Bond
PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =
CONTRACTOR PERIOD OF PERFORMANCE =
PROJECT SUBTOTAL =
OVERHEAD, PROFIT, BOND ‐$
DESCRIPTION
2.3.2 c CONSTRUCTION SECTION SUB TOTAL
BOARDWALK, PHONE STATIONS, PAVILION (CONSTRUCTION)
DESCRIPTION
Provide and install timber piles
Provide and Install the deck supporting structure and associated harware.
Provide and Install precast deck.
Provide and Install new railing.
Povide and install phone hardware & sign.
PRICING SCHEDULE TASK 2 2 of 2
XLWU 19‐8114
Repair Base Boardwalks
Crooked Island Beach Boardwalk
DATE: ______________________________
2.2.4 EQUIPMENT RENTAL ( ITEMIZED LIST )
UNIT QUANTITY UNIT COST TOTAL
ex. MONTH 1 2,180.00 2,180.00$
1 $
2 ‐$
3 ‐$
4 ‐$
5 ‐$
6 ‐$
7 ‐$
8 ‐$
9 ‐$
10 ‐$
11 ‐$
12 ‐$
13 ‐$
14 ‐$
15 ‐$
16 ‐$
17 ‐$
18 ‐$
19 ‐$
20 ‐$
OTHER PROJECT NOTES FOR BID
UNIT QUANTITY UNIT COST TOTAL
ex. MONTH 1 2,180.00 2,180.00$
1 ‐$
2 ‐$
3 ‐$
4 ‐$
5 ‐$
6 ‐$
7 ‐$
8 ‐$
9 ‐$
10 ‐$
11 ‐$
12 ‐$
13 ‐$
14 ‐$
15 ‐$
16 ‐$
17 ‐$
18 ‐$
19 ‐$
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
SUB TOT
SUB TOT
RENTAL DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
Note: Provide additional pages as needed PRICING SCHEDULE TASK 2 3 of 3
File details come from the government source that posted it. Updated .