Solicitation Amendment FA481920R00120001.pdf
PDF 533 KB Posted
- Attached to
- Swiftship Missile Retriever Repower
- Solicitation number
- FA481920R0012
About this file
This document is an amendment to a solicitation for a federal contract. The amendment extends the response date from August 17, 2020 to August 19, 2020 at 4:00 PM CST for Solicitation Number FA481920R0012. The solicitation is for a contractor to perform Missile Retriever Repower Process requirements for three 82nd ATRS Missile Retrievers. The work includes furnishing all personnel, supervision, equipment, and services as described in the Performance Work Statement. The contracting agency is the Department of the Air Force Air Combat Command. The amendment removes inapplicable provisions, makes administrative corrections, and leaves all other terms and conditions unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA481920R00120002 SF 30.pdf | ||
| Missile Retriever Repower Site Visit Attendance Sheet.pdf | ||
| Questions and Answers for FA481920R0012.xlsx | XLSX spreadsheet | |
| Attachment 2 - Instructions to offerors.docx | DOCX document | |
| Attachment 7 - Past Performance Template.docx | DOCX document | |
| Attachment 5 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 2 - Instructions to offerors Corrected.docx | DOCX document | |
| MR Site Visit Guidelines.docx | DOCX document | |
| Attachment 5 - Past Performance Questionnaire.docx | DOCX document | |
| Solicitation - FA481920R0012.pdf | ||
| Attachment 6 - DD Form 1423 - CDRLs.pdf | ||
| Attachment 3 - Evaluation Criteria.docx | DOCX document | |
| Attachment 2 - Instructions to offerors.docx | DOCX document | |
| Attachment 4 - Missile Retriever Supplemental Schedule.xlsx | XLSX spreadsheet | |
| Attachment 1 - Missile Retriever RePower PWS.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to:The Purpose of This Amendment Is:
A) Remove provisions that are not applicable to this acquisition B) To extend the response date from 17 August 2020 by 4:00 PM CST to 19 August 2020 by 4:00 PM CST C) Make administrative corrections to Attachment 2 to state "Attachment 5" for questionnaires
All other terms and conditions remain unchanged
Contract Clauses
Additional Information/Notes
The following clauses were deleted:
FAR Clauses Incorporated by Full Text
52.232-16 - Progress Payments. Apr 2012
As prescribed in 32.502-4(a), insert the following clause:
PROGRESS PAYMENTS (APR 2012)
The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, under the following conditions:
Computation of amounts. (a) Unless the Contractor requests a smaller amount, the Government will compute each progress payment as 80 (1) percent of the Contractor's total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting Officer will consider cost of money that would be allowable under FAR 31.205-10 as an incurred cost for progress payment purposes.
The amount of financing and other payments for supplies and services purchased directly for the contract are limited to the amounts that (2) have been paid by cash, check, or other forms of payment, or that are determined due and will be paid to subcontractors-
In accordance with the terms and conditions of a subcontract or invoice; and(i)
Ordinarily within 30 days of the submission of the Contractor's payment request to the Government.(ii)
The Government will exclude accrued costs of Contractor contributions under employee pension plans until actually paid unless-(3)
The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and(i)
The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution (ii) remaining unpaid shall be excluded from the Contractor's total costs for progress payments until paid).
The Contractor shall not include the following in total costs for progress payment purposes in paragraph (a)(1) of this clause:(4)
Costs that are not reasonable, allocable to this contract, and consistent with sound and generally accepted accounting principles and (i) practices.
Costs incurred by subcontractors or suppliers.(ii)
Costs ordinarily capitalized and subject to depreciation or amortization except for the properly depreciated or amortized portion of (iii) such costs.
Payments made or amounts payable to subcontractors or suppliers, except for-(iv)
FA481920R00120001
Completed work, including partial deliveries, to which the Contractor has acquired title; and(A)
Work under cost-reimbursement or time-and-material subcontracts to which the Contractor has acquired title.(B)
The amount of unliquidated progress payments may exceed neither (i) the progress payments made against incomplete work (including (5) allowable unliquidated progress payments to subcontractors) nor (ii) the value, for progress payment purposes, of the incomplete work. Incomplete work shall be considered to be the supplies and services required by this contract, for which delivery and invoicing by the Contractor and acceptance by the Government are incomplete.
The total amount of progress payments shall not exceed 80 percent of the total contract price.(6)
If a progress payment or the unliquidated progress payments exceed the amounts permitted by paragraphs (a)(4) or (a)(5) of this clause, (7) the Contractor shall repay the amount of such excess to the Government on demand.
Notwithstanding any other terms of the contract, the Contractor agrees not to request progress payments in dollar amounts of less than (8) $2,500. The Contracting Officer may make exceptions.
The costs applicable to items delivered, invoiced, and accepted shall not include costs in excess of the contract price of the items.(9)
. Except as provided in the Termination for Convenience of the Government clause, all progress payments shall be liquidated by (b) Liquidation deducting from any payment under this contract, other than advance or progress payments, the unliquidated progress payments, or 80 percent of the amount invoiced, whichever is less. The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated progress payments accordingly. The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.
. The Contracting Officer may reduce or suspend progress payments, increase the rate of liquidation, or take a (c) Reduction or suspension combination of these actions, after finding on substantial evidence any of the following conditions:
The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (f) and (g) of this clause).(1)
Performance of this contract is endangered by the Contractor's-(2)
Failure to make progress; or(i)
Unsatisfactory financial condition.(ii)
Inventory allocated to this contract substantially exceeds reasonable requirements.(3)
The Contractor is delinquent in payment of the costs of performing this contract in the ordinary course of business.(4)
The fair value of the undelivered work is less than the amount of unliquidated progress payments for that work.(5)
The Contractor is realizing less profit than that reflected in the establishment of any alternate liquidation rate in paragraph (b) of this (6) clause, and that rate is less than the progress payment rate stated in paragraph (a)(1) of this clause.
Title. (d) Title to the property described in this paragraph (d) shall vest in the Government. Vestiture shall be immediately upon the date of (1) this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.
"Property," as used in this clause, includes all of the below-described items acquired or produced by the Contractor that are or should be (2) allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices.
Parts, materials, inventories, and work in process;(i)
Special tooling and special test equipment to which the Government is to acquire title;(ii)
Nondurable ( noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment, and other similar manufacturing (iii) i.e., aids, title to which would not be obtained as special tooling under paragraph (d)(2)(ii) of this clause; and
Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other (iv) clauses of this contract.
Although title to property is in the Government under this clause, other applicable clauses of this contract; the termination clauses, (3) e.g., shall determine the handling and disposition of the property.
The Contractor may sell any scrap resulting from production under this contract without requesting the Contracting Officer's approval, (4) but the proceeds shall be credited against the costs of performance.
To acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain (5) the Contracting Officer's advance approval of the action and the terms. The Contractor shall (i) exclude the allocable costs of the property from the costs of contract performance, and (ii) repay to the Government any amount of unliquidated progress payments allocable to the property. Repayment may be by cash or credit memorandum.
When the Contractor completes all of the obligations under this contract, including liquidation of all progress payments, title shall vest (6) in the Contractor for all property (or the proceeds thereof) not-
Delivered to, and accepted by, the Government under this contract; or(i)
Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the (ii) Government under this clause.
The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the Government (7) acquired title solely under this clause.
. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the title to which (e) Risk of loss vests in the Government under this clause, except to the extent the Government expressly assumes the risk. The Contractor shall repay the Government an amount equal to the unliquidated progress payments that are based on costs allocable to property that is lost (see 45.101).
. The Contractor shall maintain an accounting system and controls adequate for the proper administration of (f) Control of costs and property this clause.
Reports, forms, and access to records. (g) The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent (1) information (including estimates to complete) reasonably requested by the Contracting Officer for the administration of this clause. Also, the
Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's books, records, and accounts.
The Contractor shall furnish estimates to complete that have been developed or updated within six months of the date of the progress (2) payment request. The estimates to complete shall represent the Contractor's best estimate of total costs to complete all remaining contract work required under the contract. The estimates shall include sufficient detail to permit Government verification.
Each Contractor request for progress payment shall:(3)
Be submitted on Standard Form 1443, Contractor's Request for Progress Payment, or the electronic equivalent as required by agency (i) regulations, in accordance with the form instructions and the contract terms; and
Include any additional supporting documentation requested by the Contracting Officer.(ii)
. If this contract is terminated under the Default clause, (i) the Contractor shall, on demand, repay to the (h) Special terms regarding default Government the amount of unliquidated progress payments and (ii) title shall vest in the Contractor, on full liquidation of progress payments, for all property for which the Government elects not to require delivery under the Default clause. The Government shall be liable for no payment except as provided by the Default clause.
Reservations of rights. (i) No payment or vesting of title under this clause shall-(1)
Excuse the Contractor from performance of obligations under this contract; or(i)
Constitute a waiver of any of the rights or remedies of the parties under the contract.(ii)
The Government's rights and remedies under this clause-(2)
Shall not be exclusive but rather shall be in addition to any other rights and remedies provided by law or this contract; and(i)
Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any (ii) single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
The financing payments to subcontractors mentioned in paragraphs (a)(1) and (a)(2) of this clause (j) Financing payments to subcontractors.
shall be all financing payments to subcontractors or divisions, if the following conditions are met:
The amounts included are limited to-(1)
The unliquidated remainder of financing payments made; plus(i)
Any unpaid subcontractor requests for financing payments.(ii)
The subcontract or interdivisional order is expected to involve a minimum of approximately 6 months between the beginning of work (2) and the first delivery; or, if the subcontractor is a small business concern, 4 months.
If the financing payments are in the form of progress payments, the terms of the subcontract or interdivisional order concerning progress (3) payments-
Are substantially similar to the terms of this clause for any subcontractor that is a large business concern, or this clause with its (i) Alternate I for any subcontractor that is a small business concern;
Are at least as favorable to the Government as the terms of this clause;(ii)
Are not more favorable to the subcontractor or division than the terms of this clause are to the Contractor;(iii)
Are in conformance with the requirements of FAR 32.504(e); and(iv)
Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the (v) Government's right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If the financing payments are in the form of performance-based payments, the terms of the subcontract or interdivisional order (4) concerning payments-
Are substantially similar to the Performance-Based Payments clause at FAR 52.232-32 and meet the criteria for, and definition of, (i) performance-based payments in FAR part 32;
Are in conformance with the requirements of FAR 32.504(f); and(ii)
Subordinate all subcontractor rights concerning property to which the Government has title under the subcon-(iii) tract to the Government's right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If the financing payments are in the form of commercial item financing payments, the terms of the subcontract or interdivisional order (5) concerning payments-
Are constructed in accordance with FAR 32.206(c) and included in a subcontract for a commercial item purchase that meets the (i) definition and standards for acquisition of commercial items in FAR parts 2 and 12;
Are in conformance with the requirements of FAR 32.504(g); and(ii)
Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the (iii) Government's right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If financing is in the form of progress payments, the progress payment rate in the subcontract is the customary rate used by the (6) contracting agency, depending on whether the subcontractor is or is not a small business concern.
Concerning any proceeds received by the Government for property to which title has vested in the Government under the subcontract (7) terms, the parties agree that the proceeds shall be applied to reducing any unliquidated financing payments by the Government to the Contractor under this contract.
If no unliquidated financing payments to the Contractor remain, but there are unliquidated financing payments that the Contractor has (8) made to any subcontractor, the Contractor shall be subrogated to all the rights the Government obtained through the terms required by this clause to be in any subcontract, as if all such rights had been assigned and transferred to the Contractor.
To facilitate small business participation in subcontracting under this contract, the Contractor shall provide financing payments to small (9) business concerns, in conformity with the standards for customary contract financing payments stated in FAR 32.113. The Contractor shall not consider the need for such financing payments as a handicap or adverse factor in the award of subcontracts.
. Notwithstanding any other progress payment provisions in this contract, progress payments (k) Limitations on undefinitized contract actions may not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. This limitation shall apply to the costs incurred, as computed in accordance with paragraph (a) of this clause, and shall remain in effect until the contract action is definitized. Costs incurred which are subject to this limitation shall be segregated on Contractor progress payment requests and invoices from those costs eligible for higher progress payment rates. For purposes of progress payment liquidation, as described in paragraph (b) of this clause, progress payments for undefinitized contract actions shall be liquidated at 80 percent of the amount invoiced for work performed under the undefinitized contract action as long as the contract action remains undefinitized. The amount of unliquidated progress payments for undefinitized contract actions shall not exceed 80 percent of the maximum liability of the Government under the undefinitized contract action or such lower limit specified elsewhere in the contract. Separate limits may be specified for separate actions.
. The designated payment office will make progress payments on the (l) Due date [30th Contracting Officer insert date as prescribed by agency day after the designated billing office receives a proper progress payment request. In the event that the ]head; if not prescribed, insert "30th"
Government requires an audit or other review of a specific progress payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date. Progress payments are considered contract financing and are not subject to the interest penalty provisions of the Prompt Payment Act.
. The Contractor shall account for and submit progress payment requests under (m) Progress payments under indefinite-delivery contracts individual orders as if the order constituted a separate contract, unless otherwise specified in this contract.
(End of clause)
Instructions, Conditions, & Notices to Offerors or Quoters
The following clauses were deleted:
FAR Clauses Incorporated by Reference
52.232-13 - Notice of Progress Payments. Apr 1984
| IDCode: |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0001 |
| EffDate: 8/11/2020 |
| ReqNo: F4AT820100AW01 |
| ProjNo: |
| IssCode: FA4819 |
| AdmCode: |
| IssuedBy: FA4819 325TH CONTRACTING SQ |
501 AIREY AVE STE 5 BLDG 647
STOP 28 CP 850 283 8643
TYNDALL AFB, FL 32403-5526
United States Karl Deffert, Email: karl.deffert@us.af.mil Telephone: 523-8634
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA481920R0012 |
| SolDate: 7/17/2020 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: 1 |
| Require: |
| Copies: |
| Descript: |
SEE CONTINUATION PAGE
| ContNameTitle: |
| CoNameTitle: Aleatha Walker |
Email: aleatha.walker@us.af.mil Telephone: 523-0431
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .