Questions_and_Answer_Part_1.pdf
PDF 189 KB Posted
- Attached to
- Grounds Maintenance Federal contract opportunity
- Solicitation number
- FA4819-18-R-6002
About this file
Questions and Answers Part 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Part_3.pdf | ||
| PWS_Revised_29_Nov.pdf | ||
| Questions_and_Ansers_Part_2.pdf | ||
| FA481918R6002_0004.pdf | ||
| Grounds_MX_Bid_Schedule.xlsx | XLSX spreadsheet | |
| FA481918R6002_0003.pdf | ||
| FA4819-18-R-6002-0002.pdf | ||
| Attachment_2_-_Grounds_MX_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Grounds_Mx_Q&A_2.pdf | ||
| PWS_Revised_20_Nov.pdf | ||
| Grounds_Mx_Q&A_1.pdf | ||
| Attachment_8_AFCOLS_Fact_Sheet.pdf | ||
| FA481918R6002_0001.pdf | ||
| Attachment_5_PPQ_signed.pdf | ||
| Attachment_7_CBA.pdf | ||
| Attachment_6_Site_Visit_Authorization_Letter.pdf | ||
| Attachment_1_Grounds_MX_PWS.pdf | ||
| FA481918R6002.pdf | ||
| Attachment_3_Wage_Determination.pdf | ||
| Attachment_5_PPQ.pdf | ||
| Attachment_2_-_Grounds_MX_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_4_Financial_Reference_Sheet.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
54. The contractor shall upon notification by the CO or COR through the issuance of a work order, perform planting of trees, shrubs, and vegetative beds to include but not limited to: removal and disposal of trees, shrubs, or vegetative beds being replaced; and performance of maintenance after planting to include watering, pruning, and insect and disease prevention to promote survivability. Only low maintenance, indigenous shrubs/trees shall be acceptable candidates for planting.
Clarify with a list of quantity, variety types, frequency of the actual action of planting anything, & of plant est qty all that will be required in each action?
PWS Appendix A updated. Situations vary to be exact. Coordinate with the COR when the work order is issued for specifics.
Clarify what a quantity of removals needed, along with size of bed that will be removed, along with the replaced or installation of beds?
Appendix A updated
Clarify as how the contractor is to provide the government with a costing for all the above items listed above?
SubCLIN AT Planting Trees, Shrubs, and Vegetative Beds has been updated to a Not To
Exceed (NTE) CLIN. Addendum 52.212-1 and 52.212-2 have been amended to reflect these changes.
82. Will costs associated with any abnormal requirement associated with the results of the Environmental
Impact Statement be covered under IDIQ, as this is rather open-ended and could result in significant unforeseen costs to the contract?
Any abnormal requirement associated with the results of the Environmental Impact Statement will be handled on a case by case basis.
15. Could the government provide a quantity for CLIN AS, Special Cuts?
Appendix A updated. 392 acres
5. Will the government please define the unit of measure for which a “Lot” represents, i.e. Acre, Ea?
The following SubCLINs have been identified and updated as a Not To Exceed (NTE) CLIN and the unit of measures are listed below. Addendum 52.212-1 and 52.212-2 have been amended to reflect these changes.
AF Lawn Renovation - Square Feet
AT Planting Trees, Shrubs and Vegetative Beds - Each
File details come from the government source that posted it.