Questions_Posted_on_FBO__1.docx

DOCX document 16 KB Posted

Attached to
Firing Range Lead Clean-Up
Solicitation number
FA4819-13-T-0003
Issued by

View the file

Other files

File Type Posted
FBO__2.docx DOCX document
DFT2-16_Installation_and_Operation_Manual.pdf PDF
PWS_Final_19_June_13.pdf PDF
DFT2-16_Replacement_Parts_List.pdf PDF
Questions_Posted_on_FBO__1.docx DOCX document
RFQ_Amendment__2.pdf PDF
Hazardous_Waste_Management_Plan_2012.pdf PDF
RFQ_Amendment__1.pdf PDF
RFQ .pdf PDF
Attachment_2 _Wage_Determination.pdf PDF
Attachment_1 _PWS.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. How many filters are used in the lead dust collection system? What types of filters? (HEPA; Pre-filters; Intermediate)

(8)filters every (3) months, a total of (24) annually. Currently the filter part number is AD095V purchased through Action Target phone# 877-852-2418. These filters can be purchased from any vendor.

2. The USACE requires a draft and final copy of the Quality Control Plan. Is this something the AFB will implement?

The awardee will be required to submit a Quailty Control Plan, if errors are found it will need to be revised and resubmitted.

3. Tyndall AFB is classified as Large Quantity Hazardous Waste Generator. If any material is recyclable is the contractor liable or is the AFB O&M responsible for all recyclables?

The lead bullet fragments are recyclable and the contractor is responsible for transporting these to building 6035 Recycling Center on Tyndall AFB. The old filters, personnel protective equipment and any other dust/dirt/material will be transported by the contractor to building 6011 Hazardous Waste on Tyndall AFB. POC is Dan Surber 283-4780.

4. Where can we get a copy of the Tyndall AFB Hazardous Waste Management Plan?

See attached Hazardous Waste Management Plan.

5. Contractor shall propose sites for waste? …Are these determined from previous designated areas?

I would assume they could use whatever site they want as long as its approved by Dan Surber Tyndall AFB Hazardous Waste manager. They can contact him at 283-4780 with further questions. Dan stated that the current contractor brings all the hazardous materials (old filters, personnel protective equipment and any other dust/dirt/material) to him.

6. Must all vehicles that contractors use have the company name prominently displayed on both sides?

Yes. Appendix A paragraph 3 of PWS.

7. Is a Bid Bond required for this proposal submission?

No Bid Bond is required.

8. Is the proposal a Price only or is there a Technical requirement to submission?

This question refers to Page 16 of the RFQ, under evaluation. The only technical requirement is that the quote meets the standards listed in the Performance Work Statement (PWS). As long as the quote meets those standards, the contract will be awarded to the offer that is most advantageous to the Government.

9. Is the size standard $13M for 562910 or 500 employees?

There is a note under 562910 that refers to Environmental Remediation. This requirement falls under that category which is 500 emloyees as the size standard.

10. Is this an indoor or outdoor range?

It is an outdoor range.

File details come from the government source that posted it. Updated .