DFT2-16_Installation_and_Operation_Manual.pdf
PDF 5 MB Posted
- Attached to
- Firing Range Lead Clean-Up
- Solicitation number
- FA4819-13-T-0003
About this file
DFT2-16 Installation and Operation Manual
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO__2.docx | DOCX document | |
| DFT2-16_Replacement_Parts_List.pdf | ||
| PWS_Final_19_June_13.pdf | ||
| Questions_Posted_on_FBO__1.docx | DOCX document | |
| RFQ_Amendment__2.pdf | ||
| Hazardous_Waste_Management_Plan_2012.pdf | ||
| Questions_Posted_on_FBO__1.docx | DOCX document | |
| RFQ_Amendment__1.pdf | ||
| RFQ .pdf | ||
| Attachment_2 _Wage_Determination.pdf | ||
| Attachment_1 _PWS.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installation and Operation Manual
IOM-42726-00
Revision 9
Downflo® II
DFT 2-8, 2-12, 2-16, 2-24, 2-36
DFT 3-12, 3-24, 3-26, 3-48, 3-60, 3-72,
DFT 4-16, 4-32, 4-48, 4-64, 4-80, 4-96, 4-112, 4-128
Throughout this manual statements indicating precautions necessary to avoid equipment failure are referenced in a Note. Statements indicating potential hazards that could result in personal injury or property damage are referenced in a Caution! box.
Installation, Operation, and
Service Information
This manual is property of the owner. Leave with the unit when set-up and start-up are complete. Donaldson Company reserves the right to change design and specifications without prior notice.
Donaldson Company, Inc.
Data Sheet
Model Number _______________________________ Serial Number ________________________________
Ship Date ____________________________________ Installation Date ______________________________
Customer Name ____________________________________________________________________________
Address ____________________________________________________________________________
Filter Type ____________________________________________________________________________
Accessories ____________________________________________________________________________
Other ____________________________________________________________________________
Caution!
Application of Dust Control Equipment
� Combustible materials such as buffing lint, paper, wood, aluminum or steel dust, weld fume, or flammable solvents represent fire or explosion hazards. Use special care when selecting and operating all dust or fume collection equipment when combustible materials are present to protect workers and property from damage due to fire and/or explosion. Consult and comply with National and Local Codes relating to fire or explosion and all other appropriate codes when determining the location and operation of dust or fume collection equipment.
� When combustible materials are present, consult with an installer of fire extinguishing systems familiar with these types of fire hazards and local fire codes for recommendations and installation of fire extinguishing and explosion protection systems. Donaldson dust collection equipment is not equipped with fire extinguishing or explosion protection systems.
� DO NOT allow sparks, cigarettes or other burning objects to enter the hood or duct of any dust or fume control equipment as these may initiate a fire or explosion.
� For optimum collector performance, use only Donaldson replacement parts.
Warning � Improper operation of a dust control system may contribute to conditions in the work area or facility that could result in severe personal injury and product or property damage. Check that all collection equipment is properly selected and sized for the intended use.
Downflo II Dust Collector
This manual contains specific precautionary statements relative to worker safety. Read thoroughly and comply as directed. Discuss the use and application of this equipment with a Donaldson representative. Instruct all personnel on safe use and maintenance procedures.
Contents
Data Sheet Description Purpose and Intended Use Rating and Specification Information Operation Inspection on Arrival Installation Codes and Procedures Installation
Site Selection, Grade-Mounted Units Site Selection, Ceiling-Mounted Units
Unit Location Electrical Wiring Rigging Instructions
Hoisting Information Typical Installation Standard Equipment
Field Assembly Module Assembly Deflector Plate, Yoke, Venturi, and Filter Installation Hopper Installation Leg Installation Power Pack Solid-State Timer Installation
Solenoid Connection Timer and Solenoid Specifications
Delta P Control Optional Settings Delta P Control Calibration
Compressed Air Installation
Preliminary Start-Up Service Information
Operational Checklist Filter Installation and Replacement
Optional Bag-Out Filter Removal Filter Replacement Dust Disposal Compressed Air Components
Optional Equipment 55-Gallon Drum Pack Magnehelic® Gauge Photohelic® Gauge Transition and Rotary Valve Damper and Silencer, TBI
Side and Top Mount Chamber Silencer, TRB
Top Mount Inlet Collar Abrasion-Resistant Inlet Collar Extended Dirty-Air Plenum Air Management Module Platforms and Ladders Cold Climate Kit Drum Sentry, Drum-Full Indicator
Troubleshooting Service Notes Warranty
Magnehelic® and Photohelic® are registered trademarks of Dwyer Instruments, Inc.
Description
The Downflo II dust collector is a continuous-duty, modular collector with cartridge-style filters. The downward airflow design delivers high filtration efficiency while using less energy. Continuous-duty means no downtime. The filters are pulse-cleaned in sequence, one set at a time, without turning the unit off. The modular design allows flexibility in system design and adapts easily to limited space areas. Each standard module is two or three filter rows wide by two, three, or four rows high by two filters deep.
Designed to increase the versatility of the unit, standard options include abrasion-resistant inlets, extended dirty-air plenums, and air management modules. Quick-removal access covers, the Drum Sentry�, Bag-Out, cold-climate kits, and steep-sided ledge-free hoppers are among the many options available to customize the Downflo II to the specific application.
Purpose and Intended Use
Downflo II collectors are widely used on nuisance dust where the load to the collector is less than two grains per cubic foot. Some typical applications include abrasive blasting, grinding, pharmaceuticals, powder paint applications, sand handling, and welding. Each application is different and selecting the correct filter cartridge for the application and type of dust collected is important.
� For all ambient, extremely fine, and non-fibrous dust, use Ultra Web® filter cartridges which offer high efficiency and performance on fine particulate.
� For fibrous dust, use a cartridge with an open-pleat design, such as Fibra-Web®.
� Operations involving high temperature and high humidity may require special attention.
Temperature, moisture content, and chemistry issues may require custom collector design.
Appropriate cartridge options are available from Donaldson.
� Hygroscopic dust such as fertilizer, salt, and sugar should be handled under a controlled, low humidity environment. Contact Donaldson for filter cartridge selection.
� Flammable or explosive dust may require custom collector design options and special cartridges. Contact Donaldson for design assistance.
� Applications with high hydrocarbon or high oil content may require special treatment or filter media.
Caution!
� Misuse or modification of this equipment may result in personal injury.
� Do not misuse or modify.
DFT 2-24
Rating and Specification Information ledoM rebmuN sretliFfo beW-artlUZE ® II .tf.qs,aerAretliF rebmuN sevlaVfo gnippihS bl,thgieW s
4-2TFD 4 610,1 4 774
8-2TFD 8 230,2 4 318
21-2TFD 21 840,3 6 640,1
61-2TFD 61 460,4 8 843,1
42-2TFD 42 690,6 21 667,1
63-2TFD 63 441,9 81 565,2
6-3TFD 6 425,1 6 195
21-3TFD 21 840,3 6 099
42-3TFD 42 690,6 21 495,1
63-3TFD 63 441,9 81 202,2
84-3TFD 84 291,21 42 388,2
06-3TFD 06 042,51 03 194,3
27-3TFD 27 63 190,4
61-4TFD 61 460,4 8 015,2
23-4TFD 23 821,8 61 540,4
84-4TFD 84 291,21 42 506,5
46-4TFD 46 652,61 23 043,8
08-4TFD 08 023,02 04 084,9
69-4TFD 69 483,42 84 531,11
211-4TFD 211 844,82 65 560,31
821-4TFD 821 215,23 46 517,41
All Units Seismic rating............................................... Zone 4 Wind load, mph Compressed air, psi ....................................... 90-100
Housing rating, �wg ......................................... +-20 Power, valves and controls .. 120-Volt AC, 50/60 Hz
DFT 2-Models DFT 3-Models DFT 4-Models DFT Side View
Operation
During normal operation, dust-laden air enters the unit through the dirty-air inlet. Airflow is directed downward through the collector and heavier particulate falls directly into the hopper. The cartridges remove fine particulate and clean filtered air passes through the cartridges to the clean-air chamber and discharges through the clean-air outlet.
Filter cleaning is completed using pulse-jet technology. A solenoid and diaphragm valve aligned to each row of filters provides the pulse cleaning. The cleaning sequence starts at the top filter row and continues down through each row.
Remove, inspect, or change the cartridges from outside the unit by removing the filter access cover and sliding the filters out.
optional clean-air outlet filter cartridges
ExtraLife" filter cleaning system dirty-air inlet clean-air outlet diaphragm valve compressed-air supply
Normal Operation hopper
Filter Cleaning Operation
Unit Operation
Caution!
� Combustible materials such as buffing lint, paper, wood, aluminum or steel dust, weld fume, and flammable solvents represent fire or explosion hazards.
� Use special care when selecting and operating all collection equipment when combustible materials are present to protect workers and property from damage due to fire and/or explosion.
� Consult and comply with all National and Local Codes relating to fire or explosion, and all other appropriate codes when determining the location and operation of dust collection equipment.
� Donaldson equipment is not equipped with fire extinguishing or explosion protection systems.
Inspection on Arrival
1. Inspect unit on delivery.
2. Report any damage to the delivery carrier.
3. Request a written inspection report from the Claims Inspector to substantiate claim.
4. File claims with the delivery carrier.
5. Compare unit received with description of product ordered.
6. Report incomplete shipments to the delivery carrier and your Donaldson representative.
7. Remove crates and shipping straps. Remove loose components and accessory packages before lifting unit from truck.
Installation Codes and Procedures
1. Safe and efficient operation of the unit depends on proper installation.
2. Authorities with jurisdiction should be consulted before installing to verify local codes and installation procedures. In the absence of such codes, install unit according to the National Electric Code, NFPA No. 70-latest edition.
3. A qualified installation and service agent must complete installation and service of this equipment.
Installation
Site Selection, Grade-Mounted Units
1. The unit can be located on a reinforced concrete foundation or rooftop.
Caution!
OSHA may have requirements regarding recirculating filtered air in your facility.
Consult with the appropriate local authorities to ensure compliance with all codes regarding recirculating filtered air.
2. Wind, seismic zone, and other live-load conditions must be considered when selecting the location for rooftop-mounted units.
Reference the Specification and Rating Information on Page 5.
3. Provide clearance from heat sources and interference with utilities when selecting the location for grade-mounted units. Reference the Specification and Rating Information on Page 5.
4. Portable units require no special installation accommodations.
Note: Units with explosion vents are not available in portable configurations.
Site Selection, Ceiling-Mounted Units
1. The unit can be suspended or hung from overhead supports. The supports must be adequate to carry the live load of the unit and installation performed to reduce sway or vibration to the unit.
2. Provide clearance from heat sources and interference with utilities when selecting the location for suspended units. Reference the Specification and Rating Information on Page 5.
Unit Location
1. When hazardous conditions or materials are present, consult with local authorities for the proper location of the collector.
2. Foundation or roof support must be sized to accommodate the entire weight of the unit, plus the weight of the collected material, piping, and ductwork. Reference the Specification and Rating Information on Page 5.
3. Prepare the foundation in the selected location.
Install anchor bolts to extend a minimum of 1 3/4-inches above foundation unless otherwise indicated on the Specification Control drawing.
4. Locate the collector to ensure the shortest and straightest inlet- and outlet-duct length, easy access to electrical and compressed-air connections, and routine maintenance.
Electrical Wiring
1. All electrical wiring and connections, including electrical grounding, should be made in accordance with the National Electric Code, NFPA No. 70-latest edition.
2. Check local ordinances for additional requirements that apply.
3. The appropriate wiring schematic and electrical rating must be used. See unit�s rating plate for required voltage.
4. If the unit is not furnished with a factory-mounted disconnect, an electric disconnect switch having adequate amp capacity shall be installed in accordance with Part IX, Article 430 of the National Electric Code, NFPA No.
70-latest edition. Check unit�s rating plate for voltage and amperage ratings.
5. Refer to the wiring diagram for the number of wires required for main power wiring and remote wiring.
Rigging Instructions
Suggested Tools & Equipment
Clevis Pins and Clamps Lifting Slings Crane or Forklift Pipe Sealant Drift Pins Pipe Wrenches Drill and Drill Bits Screwdrivers End Wrenches Socket Wrenches Large Crescent Wrench Spreader Bars
Hoisting Information
1. Use all lifting points provided.
2. Use clevis connectors, not hooks, on lifting slings.
3. Use spreader bars to prevent damage to unit�s casing.
4. Check the Specification Control drawing for weight and dimensions of the unit, subassemblies, and components to ensure adequate crane capacity.
5. Allow only qualified crane operators to lift the equipment.
6. Refer to applicable OSHA regulations and local codes when using cranes, forklifts, and other lifting equipment.
7. Lift unit and accessories separately, and assemble after unit is in place.
8. Use drift pins to align holes in section flanges during assembly.
Caution!
� Electrical installation must be performed by a qualified electrician and comply with all applicable national and local codes.
� Lock out electrical power sources before performing service or maintenance work.
� Do not install in classified hazardous atmospheres without an enclosure rated for the application.
Caution!
� Failure to lift the collector correctly can result in severe personal injury or property damage.
� Use appropriate lifting equipment and adopt all safety precautions needed for moving and handling the equipment.
� A crane or forklift is recommended for unloading, assembly, and installation of the collector.
� Location must be clear of all obstructions, such as utility lines or roof overhang.
1. Lift cabinet.
2. Apply sealant to hopper flange.
3. Fasten hopper to cabinet.
4. Assemble legs and cross braces.
5. Lift unit and hopper into position over legs and lower slowly.
6. Fasten legs to unit securely.
7. Lift assembled unit to location.
8. Support and level unit.
9. Tighten all fasteners.
10. Remove crane.
Typical Installation
Standard Equipment
Standard equipment consists of modules, inlet deflectors, yokes, filters, hoppers, and legs. Single-module through six-module units are delivered with the inlet deflectors, yokes, and filters factory installed.
Field Assembly yoke, see Detail G inlet deflector plate see Detail E dirty-air chamber clean-air chamber outlet cover see Detail H access cover see Detail A
Module Assembly
Caution!
� Failure to lift the collector correctly can result in severe personal injury or property damage.
� Use appropriate lifting equipment and adopt all safety precautions needed for moving and handling the equipment.Field assembly of modules may be required due to truck capacity, crane capacity, or specific customer requirements. A detailed instruction drawing, shipped with each module, provides specific assembly and lifting instructions.
If unit has been shipped with fully-assembled modules, skip to Hopper Installation on Page 13.
Module Assembly
Note: Two cranes are required to lift and assemble modules.
1. Remove the protective cover from the end of each module.
2. Remove one column of access covers, filters, venturis, yokes, and deflector panels from the joint-side of each module. See Detail A.
3. Remove outlet cover from the bottom of the clean-air chamber and set aside.
Detail A
Detail B
Detail C
Detail D
C CC CD D
clean-air chamber dirty-air chamber sealant
1/2-13 x 1 1/4-in bolt
1/2-in flat washer sealant
1/2-in lock washer
1/2-13 hex nut
1/2-in flat washer
3/8-16 x 1 1/4-in bolt
3/8-in flat washer sealant module flange
3/8-in lock washer module flange
3/8-16 hex nut
3/8-in flat washer filter cartridge access cover yoke, see Detail F
4. Apply a generous amount of sealant to one module to create an airtight seal between the clean and dirty-air chambers as shown in Detail B.
5. Lift both modules into position using two cranes.
6. Use drift pins to align the bolt holes in the mating flanges.
7. Bolt the modules together using 1/2-13 and 3/8- 16 x 1 1/4-in bolts, washers, and nuts as shown Details B, C, and D. Do not tighten hardware at this time.
8. Check that all joints and flanges are flush and tighten hardware starting with the joint between the clean- and dirty-air chambers.
Deflector Plate, Yoke, Venturi, and Filter Installation
Notes: 1. Installing yokes requires two people.
2. Place blocks under assembled modules during yoke and filter installation.
Detail G
Detail H
Detail E
Detail F filter cartridge panel yoke
CL
1/4-in filter access
3/8 x 1 1/4-in bolt
3/8-in flat washer inlet deflector panel
3/8-in flat washer 3/8-in hex nut
3/8-in hex nut venturi
3/8-in flat washer
3/8-in lock washer
3/8-in hex jam nut yoke shoulder filter cartridge panel
3/8 x 1-in thread-forming screw
3/8-in flat washer outlet cover clean-air chamber
1. Thread a thin jam-nut on each of the three yoke rod ends to the shoulder. See Detail F and G.
2. Start at the bottom access port and work upward. Position the yoke as shown in Detail F.
From the filter section, have one person hold the yoke in position while another person installs the venturi and hardware from the clean-air chamber. See Detail G. Do not tighten hardware at this time.
3. Center the yoke from side-to-side horizontally and 1/4-in above center vertically. See Detail F.
Adjust jam nut against the filter cartridge panel. Have one person hold the yoke in position while another person tightens the three hex nuts from the clean-air chamber. Repeat to install all yokes.
4. Attach deflector plates to the support angles using 3/8-16 x 1 1/4-in bolts, washers, and nuts as shown in Detail E.
5. Slide the filter cartridge on the yoke gasket-end first. Replace access cover and tighten securely by hand. Repeat for all filter cartridges.
6. Replace the outlet cover on the bottom of the clean-air chamber. See Detail H.
Hopper Installation
There are four hopper styles offered for the Downflo II. A single-module wide that spans two portholes; a single-module wide that spans three portholes; a double-module wide spanning four portholes; and a taller, steeper, single-module wide module which spans two portholes. All styles transition to a single, 14-inch octagon discharge.
1. Stand the hopper on the discharge end.
2. Apply sealant around the top flange toward the inside edge of the bolt pattern.
3. Lift the collector and position over the hopper and lower slowly.
4. Use drift pins to align holes.
5. Secure collector to hopper using 3/8-16 x 1 1/4-in bolts, flat washers, and nuts. Tighten all hardware securely. See Hopper Installation.
Downflo II dual mod hopper 3/8-16 x 1 1/4-in bolt
3/8-in flat washer
3/8-in flat washer 3/8-in locâ washer 3/8-16 hex nut
3/8-16 x 1 1/4-in bolt
3/8-in flat washer 3/8-in locâ washer
3/8-16 hex nut
3/8-in flat washer
Hopper Installation sinÖle ãoÇìle spanninÖ two portÜoles sinÖle ãoÇìle spanninÖ tÜree portÜoles
Çìal ãoÇìle spanninÖ Ñoìr portÜoles steepJsiÇeÇI sinÖle ãoÇìle spanninÖ two portÜoles
Hopper Styles
Leg Installation
Leg sets are designed for standard height collectors and are rated Seismic Zone 4. Reference the drawing shown below and the leg assembly drawing shipped with the leg set for proper location and assembly.
1. Position and assemble legs and cross braces as shown in Leg and Cross Brace Assembly.
2. Lift the cabinet and hopper assembly into position over the legs and lower slowly.
3. Use drift pins to align the holes in the collector with the holes in the legs. Attach each leg with 3/4-10 x 1 3/4 or 2 1/2-in bolts, washers, and nuts. Do not tighten hardware at this time.
4. Use drift pins to align the holes in the cross braces to the bacâ of the leg set. Attach using 3/4-10 x 1 3/4-in bolts, washers, and nuts.
Do not tighten hardware at this time.
LeÖ PositioninÖ ëáåÖäÉ=ãçÇìäÉ Çì~ä=ãçÇìäÉ PJãçÇìäÉ
RJãçÇìäÉ DcT 3-60 and 4-80
TJãçÇìäÉ DcT 4-112
SJãçÇìäÉ DcT 3-T2 and 4-V6
UJãçÇìäÉ DcT 4-128
VJãçÇìäÉ for larger units supplied with extended dirty-air plenum and air management module
NMJãçÇìäÉ for larger units supplied with extended dirty-air plenum and air management module
QJãçÇìäÉ DcT 3-48 and 4-64
NNJãçÇìäÉ for larger units supplied with extended dirty-air plenum and air management module
DcT 2-8, 3-12 and 4-16
DcT 2-12 and 3-18 2-12
DcT 3-24 and 4-32
DcT 2-16 and 2-24
2-24
DcT 3-36 and 4-48 DcT 2-36
LeÖ anÇ Cross Brace Asseãbly
3/4-in hex nut 3/4-in locâ washer 3/4-in flat washer cross brace leg
3/4-in flat washer 3/4 x 1 3/4-in dr 5 hex bolt
3/4 x 1 3/4-in dr 5 hex bolt
3/4-in flat washer
3/4-in flat washer 3/4-in locâ washer 3/4-in hex nut air manifold located on bacâ of cabinet hopper leg cross brace cross brace leg
3/4-in locâ washer
3/4-in flat washer
3/4 x 1 3/4-in dr 5 hex bolt
3/4-in flat washer
3/4-in hex nut
Tighten all leg and cross brace hardware before removing crane.
Caution
5. Rechecâ the position of the leg sets and cross braces.
6. Using a crane, lift the assembled unit onto the anchor bolts. casten each leg pad to the anchor bolts using flat washers, locâ washers, and hex nuts provided by others. Do not tighten hardware at this time.
T. Level unit. Tighten all hardware on legs, cross braces, and foundation anchors.
8. Remove crane.
bolt lock washer motor mount plate blower/fan bolt blower/fan housing flat washer lock washer hex nut motor mount bracket collector
Power Pack Asseãbly anÇ Installation
Power Pack
The two types of power pacâs, Torit Bacâward Incline, TBI, and Torit Radial Blade, TRB, are installed following the same procedure. Both power pacâs are designed to fit on the top or side of the Downflo II.
Note: The use of a damper is required to control airflow through unit. Lacâ of a control damper will shorten filter life.
1. The power pacâs are shipped assembled and partial disassembly is required before installing.
2. Remove eight motor-mount bracâet fasteners and remove the motor, motor-mount bracâet, and fan wheel as an assembly as shown.
3. Turn housing over and apply sealant to the outside edge of the bolt pattern on the fan housing. Mount the fan housing to the collector using the fasteners supplied.
Note: cor a top-mounted TBI, or a TRB with a blast-gate style damper, install a spacer ring between the fan housing and the collector to provide the necessary clearance for the damper installation.
4. Apply sealant to the outside edge of the bolt pattern on the fan housing. Reinstall the motor, bracâet, and fan wheel assembly. Align the tab on the fan housing with the slot in the motor-mount bracâet.
5. Rotate fan wheel after installation to ensure proper clearance between the inlet cone and the fan wheel.
1T bolt locâ washer motor mount plate blower bolt blower housing flat washer locâ washer hex nut motor mount bracâet collectorSpacer Ring Top-Mount lnly
3.62
.50
1/4-in diameter rope-type sealant
Power Pack witÜ Spacer RinÖ Installation
Solid-State Timer Installation
The solid-state timer is an electronic timer used to control the filter cleaning system. Available options include 3, 6, 10, 20, and 32-pin solenoid valve control.
Note: The solid-state timer requires a 105 to 135- Volt customer-supplied power supply.
Do not mount the solid-state timer on the unit. Mechanical vibration can damage the control.
1. Using the wiring diagram supplied, wire the fan motor, fan-motor starter, solid-state timer, and solenoid valves. Use appropriate wire gauge for rated amp load as specified by local codes.
SoliÇJState Tiãer WirinÖ DiaÖraã
2. Plug the program lug into the pin that corresponds with the number of solenoid valves controlled.
3. With power supply lN, checâ the operation of the solenoid valves. The valves should open and close sequentially at factory set 10-second intervals.
4. If a Photohelic gauge or similar device is used to control the solid-state timer and the jumper on the pressure switch portion of the timer is removed, the solenoid valves pulse only when the differential pressure reaches the high-pressure setpoint. The valves continue to pulse until the low-pressure setpoint is reached.
Fan Starter Control BoxDisconnect
1FU
2FU
3FU
208-230V 60 Hz/3Ph
IL1
IL2
IL3
1M 1OL 1T1
1T2
1T3
230V
115V
H1 H2H3 H4
X1 X2 stop star
1M
1M
1TGS
fan motor
OFF time ON time program pins program lug pressure switch timing logic power supply control logic
4FU, 3A
105 to 135 V 50-60 Hz solenoid valves
L1 L2
COM
1 2
L1
L2
L3
Disconnect, fuses, low voltage blower starter, and 1TGS switch are customer-supplied.
Wiring by others Wiring by factory
1V
Solenoid Connection
The unit is equipped with 115-Volt solenoid valves that control the pulse-cleaning valves, which clean the filters.
lne of three types of solenoid enclosures, the weatherproof NEMA 4 with 3D2 solenoids, the explosion proof NEMA T with 5D2 solenoids, or the explosion proof NEMA V with 5D2 solenoids, is mounted near or on the unit�s compressed-air manifold.
Wire the solenoids to the solid-state timer following the wiring diagram supplied with the unit. cilter life and cleaning operation will be affected if not wired correctly.
Timer and Solenoid Specifications
Power to the solid-state timer is supplied to Terminals L1 and L2, which operate in parallel with the fan starter�s low-voltage coil. ln fan start-up, power is supplied to the timer and the preset lcc time is initiated. At the end of the lcc time, the timer energizes the corresponding solenoid valve to provide the lN time cleaning pulse for one diaphragm valve and then steps to the next until all filters have been cleaned.
To pulse when the fan is lcc, install a toggle switch as shown on the Solid-State Timer Wiring Diagram. When the toggle switch is lN, the timer receives power and energizes the solenoid valves� pulse-cleaning operation even though the fan is turned lcc.
Iåpìt 105-135V/50-60Hz/1Ph
Oìtpìt=SçäÉåçáÇë The load is carried and turned lN and lcc by the 200 watt maximum-load-per-output solid-state switch.
PìäëÉ=ON=TáãÉ cactory set at 100-milliseconds, or 1/10-second.
Note: Do not adjust pulse lN time unless the proper test equipment is available. Too much or too little lN time can cause shortened filter life.
PìäëÉ=OFF=TáãÉ cactory set at 10-seconds, adjustable from 1.5-sec minimum to maximum 30-seconds.
OpÉr~táåÖ=TÉãpÉr~tìrÉ=R~åÖÉ -20° c to 130° c
Tr~åëáÉåt=Vçät~ÖÉ=PrçtÉctáçå 50 âW transient volts for 20-millisecond duration once every 20 seconds, 1% duty cycle.
SçäÉåçáÇ=V~ävÉë 115-Volt at 1V.T watts each
CçãprÉëëÉÇJAár Set compressed-air supply at V0-psig. The timer is factory set to clean one filter or set of filters every 10-seconds.
Note: Do not set compressed-air pressure above 100-psig. Component damage will occur.
Delta P Control
When combined with a pulse timer, the Delta P control monitors the differential pressure between the clean- and dirty-air chambers, providing a visual display of the filter condition. Set the high-pressure lN and low-pressure lcc setpoints to control the filter cleaning system.
Note: The Delta P control is factory set for 115-Volts. To operate at 230-Volts, the jumper settings on the printed circuit board must be changed. See lptional Settings on Page 22.
1. Choose a location near the unit that permits access to the âeypad for adjustments and observation of the pressure drop. If possible, mount the control indoors.
2. Mount the control enclosure using four self-drilling, self-tapping screws.
Note: Use vibration isolators in high vibration areas.
3. Install conduit between the control�s enclosure, the solid-state timer, and the solenoid valve enclosure on the collector.
4. Using the wiring diagram provided with the control, maâe the wiring connections to the Delta P control, the solid-state timer, and the solenoid valves. Maâe the required connections to the motor starter�s low-voltage terminals.
Note: Use proper grounding and handling procedures to prevent permanent damage to this device. Handle the printed circuit board by the edges only.
Do not touch the socâeted E2PRlM pins.
5. Wire the auxiliary alarm circuit, if desired. This relay activates the ALARM light on the control
Caution!
� Electrical installation must be performed by a qualified electrician and comply with all applicable national and local codes.
� Turn power lcc during installation or maintenance.
� Do not install in classified hazardous atmospheres without an enclosure rated for the application.
Delta P Control Display Panel
Torit Control® P
06.5 Alarm Cleaning
"wg daPa
Low Set
High Set
Alarm Set
3-digit display alarm setpoint indicates closed cleaning relay high setpoint decrease setpoint indicates closed alarm relay low setpoint increase setpoint panel if the pressure drop reaches the alarm setpoint. The auxiliary relay can also be used to activate visual or audible alarms provided by others.
6. Thirty-five feet of plastic tubing is supplied with the control and must be cut in two sections.
Connect one section of tubing from the control enclosure�s high-pressure port to the pressure tap on the dirty-air chamber. Connect the remaining section of tubing from the control enclosure�s low-pressure port to the pressure tap on the clean-air chamber. Additional tubing can be ordered from your representative.
T. Place the program wire on the solid-state timer board pin to match the number of solenoid-valve connections used.
8. Apply power to the control. Set the high- and low-pressure setpoints to start and stop the cleaning process. Set the alarm setpoint to activate the alarm display. See Delta P Control Calibration on Page 22.
Delta P Control PrinteÇ Circìit BoarÇ
PS1
4 2 1 side view autotran
BKT1
C6
R35
U6 L3
L4
L5
C16
C17
C18
R43 R42 R41
R44 R45 R46
C3
C2
Y1 D5
J2
U1
R50
R51 C8
R27 T36 R37 R38
RA12
U7
U2
RA8
RA7
RA11
ADDRESS
SW6
C14
R33 R48 R49 low
CP1
D1 D2
CR1 CR2
TB3
Mode slave alarm
R47Q7
J5
7 8 9 10 11 12 hi/lo control alarm or auxiliary
J3
J4
NC
NC
prog disable alarm reset
3 4 5 6
R26 R28 R31 R32
R25 R39 R29 R21
R22 R23
C11
C12 TB2
3 2 1 J1 in mm
L1
L2
1 2TB1
115/230-V input
W1 W2 W3
115V 230V 115V
UPDOWN
CP4CP5
CP2
U4
U8
C15 high Alarm
C5 R34
R16 R15
R19 R14
CleaningAlarm
CP3
U3
C4
Q2
Q1
Q3
Q5
Q4
"wg mm wg
R5 R11 R6 R8 R20
Q8 Q6 R10 R4 R9 R7
LED 1 LED 2 LED 3
LED 1-3
R1R3
Q10
R13
Q9 R12
R17 R12
R30
C13 C19 C7
VR2
U5
CONN 1
R2 R40 R24
T B sensor out
13+
G N
D C10
VR1
in ou t
F1
D3 D4 C1 C9
7 9 10 12
T1
1 3 4 6
A144C
M
-0
-0
R
E V
PJ1
alarm disable units "wg or daPA voltage jumpers power connection sensor out
Delta P Control Calibration
The only user calibration is the zero adjustment of the display. Due to slight changes in electronic components over time, or pressure differentials within the plant environment, the display may read something other than 0.0 while at rest. Use the following procedure to recalibrate the operating system.
1. Turn power to the Delta P Control lN for a minimum of 30-minutes to stabilize the operating temperature.
2. Turn power to the control lcc.
P. PrÉëë=~åÇ=hçäÇ the LlW SET, HIdH SET, and ALARM SET âeys while turning power to the control bacâ lN. Continue holding the âeys as the control goes through its power-up sequence.
The number 8 is displayed in each digit, and then the display reads 0.0.
4. Release the three âeys. The new calibration is automatically stored in memory.
Caution!
� The compressed-air supply must be oil and moisture free. Contamination in the compressed air used to clean filters will result in poor cleaning, cleaning valve failure or poor collector performance.
� Purge compressed-air lines to remove debris before connecting to the unit�s compressed-air manifold.
� Turn compressed-air supply lcc and bleed lines before performing service or maintenance worâ.
1. Remove the plastic pipe plug from the unit�s air manifold and connect the compressed-air supply line. Use thread-sealing tape or pipe sealant on all compressed-air connections.
Compressed Air Installation
Optional Settings
2PMJVçät=PçwÉr=Sìppäy To operate at 230-Volt, remove two jumpers labeled W1 and W3. Reinsert one of the jumpers in position W2.
Ch~åÖÉ=frçã=EåÖäáëh=tç=MÉtrác=(SI)=Uåátë ln the J1 jumper blocâ located above the PRld DISABLE terminals, move the jumper from the center and left pins 2 and 3, to the center and right pins 1 and 2.
Dáë~bäÉ=SÉtpçáåt=AÇjìëtãÉåt To restrict setpoint changes, install a jumper wire across the PRld DISABLE terminals on Terminal Blocâ 2, TB2. The current settings can be displayed, but no changes can be made until the jumper is removed. A âey-operated, normally-closed switch installed in the enclosure door will provide temporary access to the setting functions without opening the door.
ExtÉrå~ä=Aä~rã=RÉëÉt Wire the ARM RESET terminals on Terminal Blocâ 2, TB2, to a âey-operated, normally-open switch.
Closing the switch turns the alarm lcc. If alarm conditions still exist, the alarm relay re-activates in 10 seconds.
Aä~rã=Dáë~bäÉ Remove the jumper on Jumper Blocâ J5 located on the lower-right quadrant of the circuit board, from the ALARM mode position.
1. Reinstall the jumper in the SLAVE mode position to operate the AUXILIARY relay in parallel with the HI/Ll ClNTRlL relay.
2. The AUXILIARY relay will not function if no jumper is installed.
Note: Disabling the alarm relay reduces the alarm function to visual display only.
Aå~äçÖ=Oìtpìt Locate the Sensor lut Terminal Blocâ 4, TB4, in the upper-left quadrant of the circuit board. This connector provides a 1 to 5-Volt DC output proportional to the 0-to-maximum span of the pressure sensor. This circuit requires a 10,000-ohm load minimum.
CoãpresseÇ Air anÇ Coãponent Connections dirty-air inlet ductsG hopper blower fanG
Magnehelic gauge power supply disconnect switchG
120-Volt blower motor starterG solid-state timer air regulatorG bleed-type air filterG compressed-air supply lineG automatic condensate valveG solenoid electrical connectionG air supply to manifoldsG manifold solenoid enclosure diaphragm valve clean-air chamber clean-air outletG
Notes: 1. G Not included with standard unit.
2. Sprinâler taps not shown.
2. Install a customer-supplied shut-off valve, bleed-type regulator with gauge, filter, and automatic condensate valve in the compressed-air supply line.
Note: All compressed-air components must be sized to meet the maximum system requirements of 1.T scfm at V0-psi supply pressure.
Do not increase supply pressure above 100-psi. Component damage can result.
Caution!
� Use proper safety and protective equipment when removing contaminants and filters.
� Dirty filters may be heavier than they appear.
� Use care when removing filters to avoid personal injury.
� Do not drop filters.
Preliminary Start-Up
1. Checâ all electrical connections for tightness and contact.
2. Checâ for and remove all loose items in or near the inlet and outlet of the unit.
3. Checâ that all remote controls are wired into the control system and all service switches are in the lcc position.
4. Checâ that all optional accessories are installed properly and secured.
5. Checâ that hopper discharge is open and the storage container is sealed, if equipped. Excess airflow to the fan will cause electrical failure.
6. Turn power lN at source.
T. Turn the compressed-air supply lN. Adjust pressure regulator for V0 to 100-psig.
8. Turn the fan motor lN then lcc to checâ for proper rotation by referencing the rotation arrow located on the motor�s mounting plate.
Tç=rÉvÉrëÉ=rçt~táçå,=ëáåÖäÉJph~ëÉ=pçwÉr=ëìppäy:
collow manufacturer�s instructions on the motor�s nameplate.
Tç=rÉvÉrëÉ=rçt~táçå,= thrÉÉJph~ëÉ=pçwÉr=ëìppäy:
Turn electrical power lcc at source and switch any two leads on the output-side of the fan-motor starter.
V. Adjust the fan for proper airflow by adjusting the volume control damper on the fan discharge and silencer, if equipped.
Note: Excess airflow can shorten filter life, cause electrical system failure, and fan motor failure.
Service Information
Operational Checklist
1. Monitor overall performance of the collector.
2. Monitor exhaust.
3. Monitor pressure drop across filters.
4. Monitor dust disposal.
Filter Installation and Replacement
1. Turn power to unit lcc.
2. Start at the top access port.
3. Remove access cover by turning ânob counterclocâwise.
4. Breaâ the seal between the filter cartridge and the sealing surface.
5. Slowly rotate the cartridge 1/2-turn to remove dust that may have accumulated on the top of the filter.
6. Slide the filter out the access port along the suspension yoâe.
T. Dispose of properly.
8. Clean the sealing surface with damp cloth.
Note: Clean dust from gasâet sealing area to ensure a positive filter gasâet seal.
V. Checâ for an accumulation of dust in the storage area and empty as necessary.
Caution!
Stand clear of the power pacâ exhaust area to avoid injury from exhausted debris.
filter cartridge panel yoâe filter cartridge access cover
Dçwåfäç=II,=MçÇÉä=DFT=2JN2
Filter CartriÇÖe Replaceãent cable tie not supplied
BaÖJOìt Filter Reãoval
Caution!
� Use proper safety and protective equipment when removing contaminants and filters.
� Dirty filters may be heavier than they appear.
� Use care when removing filters to avoid personal injury.
� Do not drop filters.
Optional Bag-Out Filter Removal
The bag-out filter removal option allows filter installation and removal with reduced employee exposure to the contaminant. Each cartridge is removed and installed in its own bag.
1. Turn power to unit lcc.
2. Start at the top access port and remove cover and set aside.
3. Place the mouth of a new bag over the bag collar�s inner rib.
4. Place a safety strap behind the bag collar�s inner rib and secure to prevent bag movement.
5. Using the bag as a rubber glove, reach into the bag collar and rotate the filter cartridge 1/2-turn to remove dust that may have accumulated on the top of the filter.
6. Continue to use the bag as a rubber glove and slide the first filter out of the collector and into the bag.
T. Use cable ties to close the bag.
8. Remove the safety strap and dispose of the bagged filter properly.
V. Repeat Steps 3 through 8 to remove the second filter. Use the pull-rod stored in the filter support yoâe to pull the second filter to the access opening.
10. With bag and strap removed, install new filter cartridges gasâet-end first.
11. Replace access cover and tighten securely by hand.
elastic collar safety strap bag collar bag inner rib
BaÖJOìt Detail
Filter Replacement
1. Slide the new filter cartridge onto each suspension yoke.
Note: Insert the filter with the gasket end facing the clean-air chamber.
2. Wipe cover gaskets clean and replace covers by turning the knob clockwise. Tighten securely by hand.
Note: Tighten access covers securely by hand.
Gaskets must be compressed to seal properly.
3. Turn electrical power and compressed air supply ON before starting unit.
Dust Disposal
1. Turn unit OFF and empty dust container as necessary to minimize dust in the hopper.
2. If the optional 55-gallon drum attachment is used, empty when drum is 2/3 full.
3. If optional slide gate is used, close gate before servicing drum.
4. Reinstall drum and open gate.
Compressed Air Components
1. Periodically check the compressed air components and replace compressed-air filters.
2. Drain moisture following the manufacturer�s instructions.
3. With the compressed-air supply ON, check the cleaning valves, solenoid valves, and tubing for leaks. Replace as necessary.
Caution!
Turn compressed-air supply OFF and bleed lines before performing service work.
Optional Equipment
55-Gallon Drum Pack
The drum pack is designed to fit a customer-supplied, standard 55-gallon drum and provides easy access for dust removal and disposal. A flexible hose connects the drum cover and slide gate, or drum cover and adapter. Placing a pallet under the drum allows heavier product to be moved quickly using a forklift or pallet jack. If a pallet is used, the length of flexible hose may need to be shortened.
With Slide Gate
1. Place the 1/8-in gasket spacer between the hopper flange and slide gate as shown.
2. Attach the drum pack and slide gate to the hopper flange using 3/8-16 bolts, washers, and hex nuts.
3. Attach the drum cover to the 55-gallon drum.
4. Use latches to secure the cover to the drum, if equipped.
5. Connect the flexible hose between the drum cover and slide gate. Secure with hose clamps.
hopper flange drum cover slide gate optional latch customer-supplied 55-gallon drumhose clamp flexible hose
1/8-in gasket spacer
3/8-16 bolt
3/8-in flat washer
3/8-in lock washer
3/8-16 hex nut
55-Gallon Drum Pack with Slide Gate
Without Slide Gate
1. Place the 1/4-in diameter rope-type sealant between the hopper flange and the adapter as shown.
2. Attach the adapter to the hopper flange using 3/8-16 bolts, washers, and hex nuts.
hopper flange drum cover optional latch customer-supplied 55-gallon drum hose clamp flexible hose
1/4-in diameter rope-type sealant
3/8-16 bolt
3/8-in flat washer
3/8-in lock washer
3/8-16 hex nut adapter
3. Attach the drum cover to the 55-gallon drum.
4. Use latches to secure the cover to the drum, if equipped.
5. Connect the flexible hose between the drum cover and the adapter. Secure with hose clamps.
55-Gallon Drum Pack without Slide Gate
Magnehelic Gauge
The Magnehelic is a differential pressure gauge used to measure the pressure difference between the clean- and dirty-air chambers and provides a visual display of filter change requirements. The high-pressure tap is located in the dirty-air chamber and the low-pressure tap is located in the clean-air chamber.
1. Choose a convenient, accessible location on or near the unit for mounting that provides the best visual advantage.
If unit is equipped with factory-installed pressure taps, skip to Step 5.
2. Before drilling, place a piece of non-combustible cloth over the filter opening in the clean-air chamber to protect them from drilling chips.
3. Place a piece of wood behind the drill location in the dirty-air chamber to protect the filters from damage by the drill bit. Use a .406-inch diameter bit to drill the holes as shown in Magnehelic Gauge, Detail A.
4. Mount the pressure tap hardware on the clean-air chamber panel. Mount the pressure tap with the tee inside the dirty-air chamber.
5. Plug the pressure ports on the back of the gauge using two, 1/8-in NPT pipe plugs supplied.
Install two, 1/8-in NPT male adapters supplied with the gauge into the high- and low-pressure ports on the side of the gauge. Attach the mounting bracket using three, #6-32 x 1/4-in screws supplied.
Magnehelic Gauge Installation
1/8-in NPT x 90° male elbow clean-air chamber drill location, see detail A
3/8-in flat washer 1/8-in NPT coupling mounting bracket
#6-32 x 1/4-in mounting screws support structure mounting surface
Magnehelic gauge high-pressure port low-pressure port two, 1/8-in NPT adapters plastic tubing two, 1/8-in NPT pipe plugs two, self-drilling screws
1/8-in NPT x 90° male elbow dirty-air chamber drill location, see detail A 3/8-in flat washer
1/8-in NPT adapter
1/8-in NPT x 90° elbow static pressure tee
6. Mount the gauge and bracket assembly to the supporting structure using two, self-drilling screws.
7. Thirty-five feet of plastic tubing is supplied and must be cut in two sections. Connect one section of tubing from the gauge�s high-pressure port to the pressure fitting located in the dirty-air chamber. Connect remaining tubing from the gauge�s low-pressure port to the fitting in the clean-air chamber. Additional tubing can be ordered from your representative.
8. Carefully remove the cloth protecting the filters. Close access doors and tighten securely by hand.
9. Zero and maintain the gauge as directed in the manufacturer�s Operating and Maintenance Instructions provided.
.406? dia. E2xF
6.00?
6.00?
16.00?
clean-air chamber dirty-air chamber
Magnehelic Gauge, Detail A
Photohelic Gauge
The Photohelic combines the functions of a differential pressure gauge and a pressure-based switch. The gauge function measures the pressure difference between the clean- and dirty-air chambers and provides a visual display of filter condition. The high-pressure tap is located in the dirty-air chamber and a low-pressure tap is located in the clean-air chamber. The pressure-based switch function provides high-pressure ON and low-pressure OFF control of the filter cleaning system.
Caution!
� Electrical installation must be performed by a qualified electrician and comply with all applicable national and local codes.
� Turn power OFF during installation or maintenance.
� Do not install in classified hazardous atmospheres without an enclosure rated for the application.
1. Choose a convenient, accessible location near the unit that provides the best visual advantage.
2. Mount the gauge to the remote panel or door using the mounting ring, retaining ring, and four #6-32 x 1 1/4-in screws. Do not tighten screws. Connect two, 1/8-in NPT x 1/4-in OD male adapters to the gauge�s high- and low-pressure ports. Align the adapters to the 2.375-in hole in the right-hand side of the mounting bracket. Tighten screws.
3. On the back of the gauge, remove four #6-32 x 5/16-in screws and plastic enclosure. Set aside.
Add two jumper wires supplied by customer.
Remove the jumper from the pressure switch located on the timer board, if equipped. Using the 3/4-in conduit opening, wire the gauge as shown. Reassemble and fasten the enclosure securely.
koteW For use with solid-state timer only.
All parts, except the mounting bracket shown in the Photohelic Gauge Standard Installation drawing are included with the NEMA 4, Weatherproof Enclosure.
Photohelic Gauge in Optional NEMA 4 Weatherproof Enclosure
4. Thirty-five feet of plastic tubing is supplied and must be cut in two sections. Connect one section of tubing from the gauge�s high-pressure port to the pressure fitting located in the dirty-air chamber. Connect remaining tubing from the gauge�s low-pressure port to the fitting in the clean-air chamber. Additional tubing can be ordered from your representative.
5. Zero and maintain the gauge as directed in the manufacturer�s Operating and Maintenance Instructions provided.
6. To install the Photohelic Gauge mounted in a NEMA 4, Weatherproof Enclosure, follow Steps 4 and 5.
Photohelic Gauge Wiring Diagram
Photohelic gauge solenoid valves
Delta P terminals neutral 110-V jumper wires supplied by customer timer board L1 L2 1 2 3 sol com
L2 L1
HI LO
C NO NC NC NO C
C NO NC NC NO C
Photohelic Gauge Installation
1/8-in NPT x 90° male elbow clean-air chamber
3/8-in flat washer 1/8-in NPT coupling mounting bracket
#6-32 x 1/4-in mounting screws support structure mounting surface
Photohelic gauge high-pressure port low-pressure port two 1/8-in NPT adapters plastic tubing
1/8-in NPT x 90° male elbow dirty-air chamber
3/8-in flat washer
1/8-in NPT adapter
1/8-in NPT x 90° elbow static pressure tee
Transition and Rotary Valve
The 7-inch tall transition is designed to connect a standard hopper and a rotary valve. Rotary valves are used as an airlock and a metering device in dust control applications. When used as an airlock, an airtight seal between the valve�s inlet and outlet is maintained while allowing dust or material to pass through. Comparatively, the airlock works along the same line as a revolving door on a building; an airtight seal is maintained while people are allowed to pass through.
When used as a metering device, the valve allows a specific amount of material to pass per revolution, depending on the size and speed of the valve. Sizing is determined at time of order and based on product load. Standard sizes include 8, 10, 12, and 16-in inlets.
3L8-16 bolt
3L8-in flat washer
1L4-in diameter rope-type sealant placed inside bolt pattern
3L8-in flat washer
3L8-16 heñ nut hopper flange
8, 10, 12, or 16-in transition
3L8-16 heñ nut
3L8-in flat washer
3L8-16 bolt
3L8-in flat washer
8, 10, 12, or 16-in rotary airlock
1L4-in diameter rope-type sealant placed inside bolt pattern
Transition and Rotary Valve Assembly
Transitions are not intended or capable of supporting the weight of the airlock.
Provide adequate support to prevent damage to airlock or collector.
Caution!
1. Place 1L4-in diameter rope-type sealant to the inside of the transition�s bolt pattern.
2. Use 3L8-16 bolts, washers, and heñ nuts to fasten transition to hopper.
3. Determine the proper position required for the rotary airlock. Allow clearance for electrical connections and future maintenance.
4. Place a 1L4-in diameter rope-type sealant toward the inside edge of the airlock�s top flange.
5. Fasten the airlock to the transition flange using 3L8-16 bolts, washers, and heñ nuts.
6. Electrical connections must be made by a qualified electrician. Refer to the motor�s nameplate for voltage, amp rating, cycle, and wiring sequence.
power pack damper power pack damper silencer pivoting bracket silencer páÇÉ=jçìåí qçé=jçìåí
Side and Top-Mount Silencer and Damper Installation
Damper and Silencer, TBI
Side and Top Mount
1. Install the power pack as described in Power Pack on Page 16.
2. Attach the damper to the fan eñhaust outlet using the bolts, washers, and heñ nuts supplied.
3. Attach the flange to the damper using the bolts, washers, and heñ nuts supplied.
4. Apply sealant to the flange and attach silencer to flange. Tighten all hardware.
5. Loosely assemble the silencer�s support brackets.
pìééçrí=BrackÉís,=qçé=jçìåí
a. Align the pivoting support brackets to eñtend a minimum of 30-inches from the collector and mark the drill locations.
b. Drill pilot holes with a 0.339-inch bit.
c. Secure brackets using 3L8-in thread-forming bolts.
pìééçrí=BrackÉís,=páÇÉ=jçìåí
a. Align the support bracket to the underside of the silencer, flush with the cabinet wall, and mark the drill locations.
b. Drill pilot holes with a 0.339-inch bit.
c. Secure brackets using 3L8-in thread-forming bolts.
6. Loosen the wing nut…