Attachment 2 - CLIN Schedule (Sample Project).pdf

PDF 117 KB Posted

Attached to
Modular/Mobile Trailer Leasing and Support Services BPA
Solicitation number
FA481424Q0008
Issued by

About this file

This document is a Contract Line Item Number (CLIN) Schedule for a sample project related to a federal contract opportunity. It provides details on the leasing of various modular office, storage, and restroom facilities to support 5-7 personnel, including specifications for the setup, lease duration, and teardown of each unit.

The key details include the required quantities, dimensions, and configurations of the modular facilities, as well as the associated costs and timelines for setup and teardown. The document outlines the specifications for the office, storage, and restroom structures, including features such as LED lighting, air conditioning, power systems, shelving, and climate control. The related federal contract opportunity is a Blanket Purchase Agreement (BPA) for Modular/Mobile Trailer Leasing and Support Services, solicited by the Department of the Air Force Air Mobility Command.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT LINE-ITEM NUMBER (CLIN) SCHEDULE (Sample Project)

*Note: CLIN Schedule represents a sample project and will only be used to evaluate offerors Items Description Quantity Unit Unit Cost Total Amount

Setup (12’x60’ unit)

- Within 60 days of notification 1 Job

Lease (1) Modular Office Facility (refurbished)

- Supports 5-7 personnel:

- One 12’x60’ unit

- 2-4 single-station offices

- 2-4 dual-station offices

- 1-2 quad-station offices

- 1-2 restrooms

12 Months

6 Months

3 Months Teardown (12’x60’ unit)

- Within 45 days of notification 1 Job

Setup (10’x36’ unit)

- Within 60 days of notification 1 Job

Lease (1) Modular Office Facility (new)

- Supports 3 personnel:

- One 10’x36’ unit

- 3-6 single-station offices

- 1-3 dual-station offices

- 1-2 quad-station offices

- No restrooms (separate facility leased)

12 Months

6 Months

3 Months Teardown (10’x36’ unit)

Setup (8’x40’ unit)

- Within 60 days of notification 1 Job

Lease (1) Modular Storage Facility (used)

- One 8’x40’ unit

- Storage for research & development equipment

- Climate control

12 Months

6 Months 3 Months

Teardown (8’x40’ unit)

Setup (10’x18’ unit)

- Within 60 days of notification 1 Job

Lease (1) Modular Storage Facility (used)

- One 10’x18’ unit

12 Months 6 Months 3 Months

Teardown (10’x18’ unit)

Setup

- Within 60 days of notification 1 Job

Lease (1) Modular Restrooms Facility (used)

- One 8-station Men’s and Women’s unit

12 Months 6 Months 3 Months

Teardown

Setup

- Within 60 days of notification 1 Job

Lease (1) Modular Restrooms Facility (refurbished)

- One 2-Station Men’s and Woman’s unit

12 Months 6 Months 3 Months

Teardown

Office Specifications (CLIN 0001-0002): Each office structure shall include LED overhead lighting, at least four

(4) windows, power receptacles, adequate air conditioning and electrical systems, properly labeled central power breaker panel and three (3) inch weather protected cable access pass-through. Structures shall include built-in office desk in private office(s), standard desks for dual/quad station offices (Height: 24”, Width: 48”, Depth: 24”), electronic keypad locks with one master key on each exit and exterior outdoor LED lighting and interior battery powered emergency exit sign. Structures shall have level flooring, a proper drainage system and shall be elevated to ensure no flooding. CLIN 0001 shall include private restroom with vanity, sink, mirror, and toilet. Structures shall be painted beige exterior to blend with the surroundings.

Storage Specifications (CLIN 0003-0004): Each structure shall include interior locking rods and padlock insert.

Additionally, storage units shall have forklift pockets, ISO grade and corrosion-resistant steel construction, wind and water-resistant, durable flooring, vents to reduce condensation and improve circulation, and painted beige exterior to blend with the surroundings. CLIN 0003 shall include roll-up door on one end, climate control systems, insulated, eight (four per side) 4-Tier shelving units (Width: 77in, Height: 78in, Depth: 24in), and interior lighting.

Restroom Specifications (CLIN 0005-0006): Each structure shall include ample ventilation, large water and waste holding tank, and battery for lights, flushing toilets, and running sinks. Structures shall include LED interior and exterior lighting, adequate air conditioning, and painted beige exterior to blend with the surroundings. CLIN 0005 shall include two (2) non-ADA restroom, two (2) ADA restrooms with sink/mirrors, three (3) urinals, four (4) sinks.

Structure shall also come with metal ramp for ADA restrooms. CLIN 0006 shall include private men’s and private women’s bathrooms with vanities, sinks, mirrors, and toilets. Men’s bathroom shall include urinal.

File details come from the government source that posted it. Updated .