REV 10-10 SOW-Sample Project 35 .docx

DOCX document 32 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA480910R0004
Issued by

About this file

Revised Sample Project and SOW.

View the file

Other files

File Type Posted
NOTICE.docx DOCX document
FA4809-10-R-0004 SJAFB NC Atch 5 Atch 2 Blank 3052.xls XLS spreadsheet
Questions and answers 21 Oct 10.docx DOCX document
G-1 COVERSHEET.dwt —
Bldg 3803 1st Floor.ppt PPT presentation
Survey.dwt —
Telecommunications.dwt —
3803rooff.dwg DWG drawing
Tsaec.mln —
A2.DWG DWG drawing
A1.DWG DWG drawing
E3PLAN.DWG DWG drawing
2NDFLOOR.DWG DWG drawing
934002prop2.dwg DWG drawing
Drawer4_20100716_0004.PDF PDF
Drawer4_20100716_0012.PDF PDF
Drawer4_20100716_0017.PDF PDF
Drawer4_20100716_0018.PDF PDF
Drawer4_20100716_0027.PDF PDF
Drawer4_20100716_0001.PDF PDF
Drawer4_20100716_0010.PDF PDF
Drawer4_20100716_0028.PDF PDF
934002demo2.dwg DWG drawing
Drawer4_20100716_0007.PDF PDF
Atch 5.1 pg 10 25-06-02_11.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 2.7 Wage Det - NC100009 —
Atch 5.1 pg 26 VKAG 84-1076 D-1.pdf PDF
Atch 5.1 pg 43 VKAG 84-1076 E-8.pdf PDF
Atch 5.1 pg 68 VKAG 86-1006 T-1.pdf PDF
Atch 5.1 pg 84 VKAG 96-1104 A-3.PDF PDF
Atch 5.1 pg 32 VKAG 84-1076 E-1.pdf PDF
Atch 5.1 pg 28 VKAG 84-1076 D-4.pdf PDF
Atch 5.1 pg 62 VKAG 86-1006 E-1.pdf PDF
Atch 5.1 pg 34 VKAG 84-1076 E-2.pdf PDF
Atch 5.1 pg 64 VKAG 86-1006 E-3.pdf PDF
Atch 5.1 pg 51 VKAG 84-1076 P-5.pdf PDF
FA4809-10-R-0004 SJAFB NC Appendix F - AF Form 66.xls XLS spreadsheet
FA4809-10-R-0004 SJAFB NC Atch 5.1 pg 2 25-06-02_3.pdf PDF
Atch 5.1 pg 36 VKAG 84-1076 E-3.pdf PDF
Atch 5.1 pg 61 VKAG 86-1006 A-6.pdf PDF
Atch 5.1 pg 7 25-06-02_8.pdf PDF
Atch 5.1 pg 75 VKAG 93-4002 E-4.pdf PDF
Atch 5.1 pg 87 VKAG 96-1104 A-5 AS-BUILT.PDF PDF
Atch 5.1 pg 90 VKAG 96-1104 COVER.PDF PDF
Atch 5.1 pg 78 VKAG 94-4001 C-1.pdf PDF
Atch 5.1 pg 41 VKAG 84-1076 E-6R.pdf PDF
Atch 5.1 pg 63 VKAG 86-1006 E-2.pdf PDF
Atch 5.1 pg 93 25-06-02_14.pdf PDF
Atch 5.1 pg 85 VKAG 96-1104 A-4.PDF PDF
Atch 5.1 pg 42 VKAG 84-1076 E-7.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4809-10-R-0004

Attachment 5

REVISED SAMPLE PROJECT

REPAIR BLDG. 3803 (VAQ)

Project # VKAG 96-1105 4 Oct 10

1. Project Title: Repair Bldg. 3803 (VAQ)

2. Project Number: VKAG 96-1105

3. Method of contracting - RFP (conventional design-build)

a. Bid schedule - attached

4. Favorable evaluation will be made to the Lowest Price Technically Acceptable (LPTA) offer meeting or exceeding the acceptability standards for non-cost evaluation factor(s). The non-cost evaluation factor for this award shall be the 35% design proposal submission which must meet the 35% design definition as stated in paragraph la of Statement of Work for Multiple Award Construction Contract (MACC), for a proposal to be determined technically acceptable. The 35% design proposal shall include drawings which show the main elements of work. Contractor shall submit a detailed AF Form 3052 showing all proposed costs (material, labor, ODC) associated with this project.

5. Statement of work - attached

6. Budget constraints – Magnitude is between $21M and $45M

7. Design submittals required - 35% per definition in MACC General ProvisionsStatement of Work (SOW). Contractor to submit three (3) full size sets of drawings, three (3) sets of outline specifications and a detailed construction estimate (3 copies). (1 Original and 2 copies) Paper copies only are required. Design documents are for evaluation purposes only.

8. Existing drawings – attached (the as-built drawings are of Bldgs. 3802, 3803 & 3804. Bldgs 3802 and 3803 were built the same originally so most things are the same throughout (concrete roof deck and CMU walls – assume Type II non-combustible construction for proposal). Bldg 3804 is different and is of wood construction. The contractor shall field verify 3803 features. As-built drawings should be assumed to be existing conditions.

**Facility is not clear of asbestos or low lead containing paint. Flooring is carpet over asbestos containing tile and mastic (13%-20% chrysotile) except rooms 3110 and 3134 which is carpet over concrete. Sheet rock wall and ceiling material is non asbestos containing. Pipe and elbow insulation in mechanical rooms and non-accessible areas contain 5%-15% chrysotile asbestos. The insulation on the HVAC units in mechanical rooms contains 75%-80% asbestos. Window caulking is non asbestos containing. Interior paint contains 0.011%-0.031% lead by weight. Contractor shall incorporate all required abatement in the project scope.

9. Drawings to be provided by the contractor (24" x 36")

(a) As required by the SOW 35% design definition

FA4809-10-R-0004, Revised SOW, Amendment 0007, dated 21 Oct 10, Page 2 of 6

10. A list of all engineering assumptions shall be provided with the 35% design including but limited to:

a. Primary structural components as required (foundations, walls, etc)

b. Heating and ventilating loads and system performance requirements

c. Short Circuit Calculations

d. Sizing for electrical lighting panel

e. Arc Flash requirements

f. Fire protection (single line/calculations)

g. Fire suppression (sprinkler layout/pipe sizing/hydraulic calculations)

h. If there are no engineering assumptions please state this.

11.Design criteria to be included on drawings - as noted in MACC General ProvisionSOW definitions for design percentages.
12.Specifications required: contractor shall supply an outline of the sections of specifications with the 35% proposal.

FA4809-10-R-0004, Revised SOW, Amendment 0007, dated 21 Oct 10, Page 3 of 6

Revised Statement of Work For

REPAIR BLDG. 3803 (VAQ)

Project # VKAG 96-1105

4 Oct 10 The contractor shall prepare a proposal to renovate Bldg. 3803 (VAQ). The building houses visiting airmen (billeting) to Seymour Johnson AFB. Specific requirements are as follows:

1. Repair VAQ, General

1. Design shall be in accordance with the AFSDG 4-724-01, Design: Visiting Quarters (except as noted), the Seymour Johnson AFB Architectural Standards (except as noted), Unified Facilities Criteria (UFC), National Fire Protection Association (NFPA) regulations, North Carolina Building Code, as well as those required elsewhere this document and in the MACC general requirements. For this proposal contractor shall assume that the renovation costs are less than 50% of the replacement value therefore, per the AT/FP UFC, the existing facility is not required to be brought up to current standards. The only exterior work that is required is for the veneer, site restoration, and, and utilities. Requirements for sidewalks, site furniture/amenities, vehicle/bicycle parking, etc are met and are not required to be changed. Existing building access shall be maintained. Site alterations to achieve full access from three sides will not be required.

1. Final facility interior square footage shall be as required by the regulations, requirements and standards and total identified funds. Project will not require LEED certification.

2. General requirements

1. Demolish existing floor plan ONLY as required to create new floor plan as provided in the power point slides that show “before” and “after” floor plans. Currently, the room layout has two guest rooms sharing one bathroom. There are six suites and six single rooms with private baths as well. All rooms must comply with the private bathroom guidance. ADA requirements shall be limited to one suite on the first floor. NO elevator is required for this project. All areas listed in AFSDG 4-724-01, Table 2-1, are not required. Areas currently in the existing facility and required for the proposed facility are as follows: Guest Rooms (queen size beds are standard), Mechanical Rooms, Stairways, Storage Rooms, Laundry Rooms, Janitor Rooms, Office areas, Fitness Center, and Conference Room (see power point slides). The existing exterior stairway is required to be enclosed. Provide microwave ovens and refrigerators only (no washer/dryers required). Utility preparation for all is required. Furniture or any associated deign fees are not included in this project (no FFE). Window treatments, as well as interior signage is required for this project.

1. Replace all exterior windows with fixed type windows. Replacements shall be IAW UFC 04-010-01, DoD Minimum Antiterrorism Standards for Buildings. Assume the existing structure meets window installation requirements.

1. Add a brick masonry veneer to the exterior of the existing facility and tie existing standing seam roof system into it as required. Restore and disturbed landscaping as required. The existing building has structural concrete bands around the perimeter. These bands shall be covered by the veneer and not used as any type of detailing. For proposal purposes assume that the addition of the veneer will not require a structural analysis for current code and additional structural work will not be required.

1. Replace the entire HVAC system, entire electrical system (include all conduit, wiring, light fixtures, etc), entire plumbing system (include all fixtures, enclosures, etc), all doors/

FA4809-10-R-0004, Revised SOW, Amendment 0007, dated 21 Oct 10, Page 2 of 6 frames/ hardware, and all ceiling/wall/floor finishes. There is not an existing cable tray for telecommunications in Bldg 3803. Provide small cable tray for accessible ceiling areas or

1. conduit system for non-accessible ceiling areas.

1. Interior and Exterior lighting shall be per UFC 3-530-01.

1. Install power outlets throughout facility.

1. Design temps shall be 68 (winter) and 75 (summer) degrees. The cooling capacity of the existing chiller is a nominal 100 tons and contractor shall assume it has adequate capacity to meet cooling loads for the project. The chiller was installed new in 1996 and factory overhauled in Dec 2008. Design water temperatures for the chiller are 45 degrees entering and 55 degrees leaving. Pumping arrangement for the chiller is CV primary and CV secondary within the central chiller plant, Bldg 3805, located behind Bldg 3803.

1. Ventilation per ASHRAE Standard 62

1. Heating calculations to include losses due to conduction, infiltration, and internal loads. ASHRAE 90.1-2007 and EPACT 2005 are the energy efficiency standards for the renovation design.

1. Facility (first floor only, one suite only) shall be in compliance with ADA requirements.

1. Existing roof is standing seam metal and new exterior shall tie in properly (see as-built drawings VKAG 90-1047).

1. Install a new fire protection / detection system per UFC and NFPA. Suppression system is required. A reliable power source is available therefore a generator is not required for a fire pump. Use UFC 3-600-01 instead of MIL-HDBK-1008C.

1. Add a new mass notification system, new interior signage, and new remote electric meters. For the mass notification, the MACC contractor shall provide 100% complete operable systems to include Monaco representative to do map set-up/programming as the receiving station system at the fire station.

1. Fire alarm panel to be located in mechanical room (utilize Monaco M-2 system or compatible).

1. Install cable TV and CommComm. (Telephone and Data) outlets throughout facility. Contract is to include boxes with conduits run back to the main communication entry point, including pull strings and labeling for which room and location is fed for each conduit. Include blank device plates. No devices or cable is to be included for telephone. Copper is run into the mechanical room of Bldg 3803 from Bldg 3804. Contractor shall contract with Time Warner Cable for installation of 100% complete operational Cable Television system with wiring and devices per their standards. Follow the attached SJAFB communications wiring policy and referenced standards for backboard, conduit, and box placement requirements. Contractor shall pay any associated costs to provide a complete functional system. Base Communications will wire all CommComm. (Telephone and Data).

1. New electrical panels shall be 3 phase, 280V/120V, 42 circuit. The panels shall be fed from a new 3 phase transformer (if existing does not have adequate capacity) sited by the Contractor and minimum of 25’ from the facility.

1. Install valves at water service connections to mains.

3. Support Information:

a. Existing sanitary sewer (SS) is 6” and is assumed adequate.

b. Existing water main (W) is 8" diameter with 4” and 2” services to building.

c. Natural gas is in the area.

FA4809-10-R-0004, Revised SOW, Amendment 0007, dated 21 Oct 10, Page 2 of 6

BID SCHEDULE

REPAIR BLDG. 3803 (VAQ)

Project # VKAG 96-1105 Contractor:

BaseBid: Base bid shall include all items of work as outlined in the Task Order and Statement of Work to renovate Bldg 3803.

Investigative Services : $

Design Costs: $

Construction Costs: $

*TOTAL: $

*Total must match total cost on last line on the backside of AF Form 3052 submitted with this proposal.

Proposed Period of Performance (design and construct): __________days

GOVERNMENT ESTIMATE

REPAIR BLDG. 3803 (VAQ)

Project # VKAG 96-1105

BaseBid: Base bid shall include all items of work as outlined in the Task Order and Statement of Work to renovate Bldg 3803.

Investigative Services : $138,000.00

Design Costs: $207,000.00

Construction Costs: $3,455,000.00

Total $3,800,000.00 Proposed Period of Performance (design and construct): 365 days