Amendment 0009.doc

DOC document 41 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA480910R0004
Issued by

About this file

Amendment 0009 makes changes to Section H concerning Bonds.

View the file

Other files

File Type Posted
info.pdf PDF
NOTICE.docx DOCX document
Amendment 10 and Attch 5.pdf PDF
95 ISA - 30Sep2010.pdf PDF
95 ID2 - 30Sep2010.pdf PDF
Amendment 0008.doc DOC document
Questions and answers 21 Oct 10.docx DOCX document
FA4809-10-R-0004 SJAFB NC Atch 5 Atch 2 Blank 3052.xls XLS spreadsheet
MACC SOW Revised pages 2 and 9.docx DOCX document
REV 10-10 SOW-Sample Project 35 .docx DOCX document
3803rooff.dwg DWG drawing
Tsaec.mln —
Telecommunications.dwt —
Tsaec_2_0.shx —
Architectural.dwt —
Survey.dwt —
Tsaec8-NJ.lin —
Structural.dwt —
3803elev.dwg DWG drawing
Civil.dwt —
SJAFB CADD Standards.pdf PDF
Tsaec_2_0.mln —
Electrical.dwt —
flyover.dwg DWG drawing
3803sect.dwg DWG drawing
Amendment 0007.rtf RTF text file
3803roofd.dwg DWG drawing
(CAD Standard 4_0) ERDC-ITL-TR-09-2.pdf PDF
G-1 COVERSHEET.dwt —
Bldg 3803 1st Floor.ppt PPT presentation
Tsaec_2_0.lin —
Tsaec.shx —
Fire Protection.dwt —
Plumbing.dwt —
Mechanical.dwt —
3803roofn.dwg DWG drawing
Tsaec32.lin —
Tsaec8.lin —
Bldg 3803 2nd floor.ppt PPT presentation
SJAFB wiring policy.doc DOC document
c1site.dwg DWG drawing
3803-1.dwg DWG drawing
Landscape.dwt —
3803-2.dwg DWG drawing
Tsaec4.lin —
border.dwg DWG drawing
Amendment 0006.rtf RTF text file
Amendment 0005.doc DOC document
Amendment 0004.doc DOC document
MACC_Sit.pdf PDF
Show 40 more

Latest 50 of 233 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

A. The following Special Contract Requirements from Section H have been replaced:

FROM:

H-7

BONDS

Performance and Payment Bonds/Alternative Payment Protection. Per FAR Clause 52.228-15 entitled, “Performance and Payment Bonds – Construction (Jul 2000),” the contractor shall be required to furnish a Performance Bonds (Standard Form 25) and a Payment Bond (Standard Form 25-A), each with good and sufficient surety and sureties, acceptable to the Government within 14 calendar days after award. Payment protection shall be required for task orders between $25,000 and $100,000. The Contractor may use alternate payment protection for task orders between $25,000 and $100,000.

*NOTE: A Notice to Proceed will not be issued and no work shall begin until good and sufficient surety has been received and accepted by the Contracting Officer.

TO:

H-7

BONDS

Performance and Payment Bonds/Alternative Payment Protection. The contractor shall be required to furnish a Performance Bond (Standard From 25) and a Payment Bond (Standard Form 25-A), each with good and sufficient surety or sureties, acceptable to the Government for each task order exceeding $150,000.00 within 14 calendar days after task order award. Payment protection shall be required for task orders between $30,000 .00 and $150,000.00. The contractor may use alternate payment protection for task orders between $30,000.00 and $150,000.00.

NOTE: A Notice to Proceed will not be issued and no work shall begin until good and sufficient surety has been received and accepted by the Contracting Officer.

FROM:

H-8 ALTERNATE PAYMENT PROTECTION

For task orders between $25,000 and $100,000, the Contractor shall provide one of the following alternative payment protections (IAW FAR 52.228-13):

(1) Payment Bond

(2) Irrevocable Letter of Credit (ILC)

TO:

H-8 ALTERNATE PAYMENT PROTECTION

For task orders between $30,000.00 and $150,000.00, the contractor shall provide one of the following alternative payment protections (IAW FAR 52.228-13):

(1) Payment Bond

(2) Irrevocable Letter of Credit (ILC) B. All other terms and conditions remain unchanged.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .