Amendment 0009.doc

DOC document 41 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA480910R0004
Issued by

About this file

Amendment 0009 makes changes to Section H concerning Bonds.

View the file

Other files

File Type Posted
info.pdf PDF
Civil.dwt —
SJAFB CADD Standards.pdf PDF
Electrical.dwt —
Tsaec_2_0.mln —
flyover.dwg DWG drawing
Tsaec_2_0.lin —
Plumbing.dwt —
Mechanical.dwt —
Questions and Answers 23 Jul 10.docx DOCX document
Amendment 0003 dtd 23 Jul 10.rtf RTF text file
Q A 23 Jul 10.pdf PDF
Questions and Answers 20 Jul 10.docx DOCX document
Drawer4_20100716_0024.PDF PDF
A6.DWG DWG drawing
A4.DWG DWG drawing
A7.DWG DWG drawing
A3.DWG DWG drawing
1STFLOOR.DWG DWG drawing
Drawer4_20100716_0008.PDF PDF
Drawer4_20100716_0023.PDF PDF
Drawer4_20100716_0009.PDF PDF
Drawer4_20100716_0019.PDF PDF
Drawer4_20100716_0005.PDF PDF
Amendment 0001.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 3 - Determination of Contractor Responsibility.doc DOC document
Atch 5.1 pg 108 4536ME7.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 2 Wage Det. - NC100053 —
Atch 5.1 pg 30 VKAG 84-1076 D-6.pdf PDF
Atch 5.1 pg 98 3803 FA-1.pdf PDF
Atch 5.1 pg 81 VKAG 95-4004 C-1.pdf PDF
Atch 5.1 pg 37 VKAG 84-1076 E-4.pdf PDF
Atch 5.1 pg 91 VKAG 98-1115 A-1.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 1 Appendix C - Section 01560 Summary for Contractors.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 2.5 Wage Det. - NC100004 —
Atch 5.1 pg 33 VKAG 84-1076 E-1R.pdf PDF
Atch 5.1 pg 60 VKAG 86-1006 A-5.pdf PDF
Atch 5.1 pg 44 VKAG 84-1076 M-1.pdf PDF
Atch 5.1 pg 47 VKAG 84-1076 P-1.pdf PDF
Atch 5.1 pg 73 VKAG 93-4002 E-2.pdf PDF
Atch 5.1 pg 49 VKAG 84-1076 P-3.pdf PDF
Atch 5.1 pg 72 VKAG 93-4002 E-1.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 1 Appendix D - SECTION 16721.docx DOCX document
Atch 5.1 pg 69 VKAG 86-1006 X-1.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 2.4 Wage Det. - NC100034 —
FA4809-10-R-0004 SJAFB NC Atch 1 Appendix B - Section 01560.doc DOC document
Atch 5.1 pg 89 VKAG 96-1104 A-7.PDF PDF
Atch 5.1 pg 22 VKAG 84-1060 E-14.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 5 - Request for Proposal —
FA4809-10-R-0004 SJAFB NC Atch 4 - Past Performance Questionnaire.doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

A. The following Special Contract Requirements from Section H have been replaced:

FROM:

H-7

BONDS

Performance and Payment Bonds/Alternative Payment Protection. Per FAR Clause 52.228-15 entitled, “Performance and Payment Bonds – Construction (Jul 2000),” the contractor shall be required to furnish a Performance Bonds (Standard Form 25) and a Payment Bond (Standard Form 25-A), each with good and sufficient surety and sureties, acceptable to the Government within 14 calendar days after award. Payment protection shall be required for task orders between $25,000 and $100,000. The Contractor may use alternate payment protection for task orders between $25,000 and $100,000.

*NOTE: A Notice to Proceed will not be issued and no work shall begin until good and sufficient surety has been received and accepted by the Contracting Officer.

TO:

H-7

BONDS

Performance and Payment Bonds/Alternative Payment Protection. The contractor shall be required to furnish a Performance Bond (Standard From 25) and a Payment Bond (Standard Form 25-A), each with good and sufficient surety or sureties, acceptable to the Government for each task order exceeding $150,000.00 within 14 calendar days after task order award. Payment protection shall be required for task orders between $30,000 .00 and $150,000.00. The contractor may use alternate payment protection for task orders between $30,000.00 and $150,000.00.

NOTE: A Notice to Proceed will not be issued and no work shall begin until good and sufficient surety has been received and accepted by the Contracting Officer.

FROM:

H-8 ALTERNATE PAYMENT PROTECTION

For task orders between $25,000 and $100,000, the Contractor shall provide one of the following alternative payment protections (IAW FAR 52.228-13):

(1) Payment Bond

(2) Irrevocable Letter of Credit (ILC)

TO:

H-8 ALTERNATE PAYMENT PROTECTION

For task orders between $30,000.00 and $150,000.00, the contractor shall provide one of the following alternative payment protections (IAW FAR 52.228-13):

(1) Payment Bond

(2) Irrevocable Letter of Credit (ILC) B. All other terms and conditions remain unchanged.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .