MACC SOW Revised pages 2 and 9.docx

DOCX document 19 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA480910R0004
Issued by

About this file

MACC SOW Revised pages 2 and 9

View the file

Other files

File Type Posted
95 ID2 - 30Sep2010.pdf PDF
Landscape.dwt —
SJAFB wiring policy.doc DOC document
Bldg 3803 2nd floor.ppt PPT presentation
3803-2.dwg DWG drawing
border.dwg DWG drawing
Tsaec4.lin —
3803-1.dwg DWG drawing
c1site.dwg DWG drawing
Amendment 0005.doc DOC document
E4PLAN.DWG DWG drawing
E2DEMO.DWG DWG drawing
Drawer4_20100716_0022.PDF PDF
E1DEMO.DWG DWG drawing
Drawer4_20100716_0006.PDF PDF
Drawer4_20100716_0011.PDF PDF
Drawer4_20100716_0021.PDF PDF
Drawer4_20100716_0002.PDF PDF
Atch 5.1 pg 42 VKAG 84-1076 E-7.pdf PDF
Atch 5.1 pg 100 3803 FA-5.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 5 Atch 2 Blank 3052.xls XLS spreadsheet
Solicitation No. FA4809-10-R-0004 Multiple Award Construction Contract.doc DOC document
Atch 5.1 pg 45 VKAG 84-1076 M-2.pdf PDF
Atch 5.1 pg 11 25-06-02_12.pdf PDF
Atch 5.1 pg 12 25-06-02_13.pdf PDF
Atch 5.1 pg 17 VKAG 81-0103.pdf PDF
Atch 5.1 pg 14 SJ 60-1 SHT1.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 2.8 Wage Det. - NC100022 —
FA4809-10-R-0004 SJAFB NC Appendix E - Architectural Compatability 18 Dec A2003.pdf PDF
Atch 5.1 pg 50 VKAG 84-1076 P-4.pdf PDF
Atch 5.1 pg 83 VKAG 96-1104 A-2.PDF PDF
Atch 5.1 pg 57 VKAG 86-1006 A-1.pdf PDF
Atch 5.1 pg 23 VKAG 84-1076 A-1.pdf PDF
FA4809-10-R-0004 SJAFB NC Atch 5.1 pg 3 25-06-02_4.pdf PDF
Atch 5.1 pg 19 VKAG 81-0103 3.pdf PDF
Atch 5.1 pg 52 VKAG 85-1009 1.pdf PDF
Atch 5.1 pg 59 VKAG 86-1006 A-3.pdf PDF
Atch 5.1 pg 54 VKAG 85-1009 3.pdf PDF
Atch 5.1 pg 79 VKAG 95-4004 A-1.pdf PDF
Atch 5.1 pg 56 VKAG 86-1006.pdf PDF
Atch 5.1 pg 16 SJ 60-1 SHT3.pdf PDF
Atch 5.1 pg 53 VKAG 85-1009 2.pdf PDF
Atch 5.1 pg 101 3804 COVERSHEET.pdf PDF
Atch 5.1 pg 74 VKAG 93-4002 E-3.pdf PDF
Atch 5.1 pg 38 VKAG 84-1076 E-4R.pdf PDF
Atch 5.1 pg 39 VKAG 84-1076 E-5R.pdf PDF
Atch 5.1 pg 20 VKAG 81-0103 4.pdf PDF
Atch 5.1 pg 40 VKAG 84-1076 E-6.pdf PDF
Atch 5.1 pg 21 VKAG 84-1060 E-13.pdf PDF
Atch 5.1 pg 77 VKAG 94-4001 A-2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4809-10-R-0004

Attachment 1
Page 9 of 18
FA4809-10-R-0004
Attachment 1
Page 2 of 18

INDEX

FOR

STATEMENT OF WORK

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)

1. Definitions

2. Description of Work

3. Contractor Operations

4. Commencement, Prosecution, and Completion of Work

5. Design Documents

a. Drawings

b. Specifications

c. Design Analysis

d. Perspective Drawing

6. Progress of Work

7. Material Approval Submittals

8. As-Built Drawings

9. Operation and Maintenance Manuals

10. Warranty of Construction

11. Program Management

12. Quality Control

13. Subcontracting Support Capability

14. Project Execution and Technical Support

15. Government Furnished Equipment / Materials

16. Government Equipment On Site

17. Disposal of Waste

18. Construction Site Maintenance

19. Work in Special Security Areas

20. Delays in Entering and Leaving Work Area

21. Safety and Health

22. Asbestos Requirements

23. Lead Based Paint Requirements

24. Precautions Against Hazards

25. Use of Tobacco Products in Air Force Facilities

26. Recording and Preserving Historical and Archeological Finds

Appendix A, Section 01000, General Appendix B, Section 01560, Environmental Protection Appendix C, Section 01560, Attachment: Summary for Contractors Appendix D, Section 16721, Fire Detection, Alarm, and Radio Type Reporting Systems Appendix E, SJAFB Architectural Compatibility Standards Appendix F, AF Form 66 Appendix G, Sheet G-1, Location Map

Attachment 1, Seymour Johnson AFB Communications Cabling Distibution Standards 7 Pages Attachment 2, Building 3803 1st and 2nd Floor, existing

and revised floor plan.4 Pages
Attachment 3, SJAFB CADD Standards56 Pages
Attachment 4, A/E/C CAD Standard July 2009447 Pages
(m)Details
(n)Structural Plans, Schedules, and Details
(o)Mechanical Plan and Schedules
(p)Plumbing and HVAC Riser Diagrams
(q)HVAC Controls Diagrams
(r)Electrical Site Plan
(s)Power Plan and Panel Schedule
(t)Electrical Plan and Lighting Plan with Schedule and details
(u)Fire Protection Plan
(v)Communications Plan
(w)Landscape Plan

b. Specifications:

(1) For projects not previously designed, the technical specifications to be utilized by the contractor shall be Masterspec, Short Form or Long Form versions. In the TO, the contractor will identify the specification sections, which represent major elements of work and, as a minimum, are to be included in the project. Three (3) sets (or as otherwise required by the TO) of the specifications index for those sections, as well as other specification sections appropriate to the anticipated work and added by the contractor, shall be included in the 35% design submitted with the contractor’s proposal. The TO will also identify whether the Long Form or Short Form version of Masterspec is to be used. Once awarded the TO for a specific project, the successful contractor shall electronically edit the specification sections, previously identified, to correspond with the work proposed in the project. A minimum of four (4) sets of edited specifications (or as otherwise required by the TO) shall be provided with each intermediate and final design submittal.

(2) In addition to the technical specifications described above, the latest version of the following references is to be utilized in the preparation of project designs;

Seymour Johnson AFB Architectural Design Standards (Appendix E) American Society of Testing and Materials (ASTM) Standards American National Standards Institute (ANSI) Standards National Fire Protection Code (NFPA), with particulate attention paid to:

NFPA 101, Life Safety Code
NFPA 70, National Electrical Code (NEC)
NFPA 72, National Fire Alarm and Signaling Code

Unified Facilities Criteria (UFC), ALL that apply with particulate attention paid to:

UFC 3-600-01, Fire Protection Engineering For Facilities
UFC 4-010-01, DoD Minimum Antiterrorism Standards For Buildings
UFC 4-021-01, Design and O&M: Mass Notification Systems
UFC 3-420-01, Plumbing Systems
UFC 3-530-01, Design: Interior, Exterior Lighting and Controls
UFC 3-230-01, Interior Electrical Systems
UFC 3-550-01, Exterior Electrical Power Distribution

Air Force Instructions, Handbooks, Manuals, etc; ALL that apply International Building Code & NC State Building Code ANSI C-2, National Electrical Safety Code (NESC) ANSI/ASCE 7-95, Minimum Design Loads for Buildings and Other Structures Installation Development and Design (ID2) Seymour Johnson Air Force Base, North Carolina Air Combat Command Installation Sustainability Asessment Report

As well as any applicable manufacturer or industry specifications or recommendations associated with material, supplies, or systems. If a discrepancy exists between these documents, the contractor shall bring this to the attention of the Contracting Officer and shall utilize the most stringent requirement(s) in the preparation of the project design.

During the design period of a project, there will be a Statement of Work along with all the applicable UFCs and various codes as well as Base Architectural Standards. If there is ever an ambiguity, the building codes, Architectural Standards and UFCs will take precedent over the SOW.