FA4809-10-R-0004
| Attachment 1 |
| Page 9 of 18 |
| FA4809-10-R-0004 |
| Attachment 1 |
| Page 2 of 18 |
INDEX
FOR
STATEMENT OF WORK
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
1. Definitions
2. Description of Work
3. Contractor Operations
4. Commencement, Prosecution, and Completion of Work
5. Design Documents
a. Drawings
b. Specifications
c. Design Analysis
d. Perspective Drawing
6. Progress of Work
7. Material Approval Submittals
8. As-Built Drawings
9. Operation and Maintenance Manuals
10. Warranty of Construction
11. Program Management
12. Quality Control
13. Subcontracting Support Capability
14. Project Execution and Technical Support
15. Government Furnished Equipment / Materials
16. Government Equipment On Site
17. Disposal of Waste
18. Construction Site Maintenance
19. Work in Special Security Areas
20. Delays in Entering and Leaving Work Area
21. Safety and Health
22. Asbestos Requirements
23. Lead Based Paint Requirements
24. Precautions Against Hazards
25. Use of Tobacco Products in Air Force Facilities
26. Recording and Preserving Historical and Archeological Finds
Appendix A, Section 01000, General Appendix B, Section 01560, Environmental Protection Appendix C, Section 01560, Attachment: Summary for Contractors Appendix D, Section 16721, Fire Detection, Alarm, and Radio Type Reporting Systems Appendix E, SJAFB Architectural Compatibility Standards Appendix F, AF Form 66 Appendix G, Sheet G-1, Location Map
Attachment 1, Seymour Johnson AFB Communications Cabling Distibution Standards 7 Pages Attachment 2, Building 3803 1st and 2nd Floor, existing
| and revised floor plan. | 4 Pages | ||
| Attachment 3, SJAFB CADD Standards | 56 Pages | ||
| Attachment 4, A/E/C CAD Standard July 2009 | 447 Pages |
| (m) | Details |
| (n) | Structural Plans, Schedules, and Details |
| (o) | Mechanical Plan and Schedules |
| (p) | Plumbing and HVAC Riser Diagrams |
| (q) | HVAC Controls Diagrams |
| (r) | Electrical Site Plan |
| (s) | Power Plan and Panel Schedule |
| (t) | Electrical Plan and Lighting Plan with Schedule and details |
| (u) | Fire Protection Plan |
| (v) | Communications Plan |
| (w) | Landscape Plan |
b. Specifications:
(1) For projects not previously designed, the technical specifications to be utilized by the contractor shall be Masterspec, Short Form or Long Form versions. In the TO, the contractor will identify the specification sections, which represent major elements of work and, as a minimum, are to be included in the project. Three (3) sets (or as otherwise required by the TO) of the specifications index for those sections, as well as other specification sections appropriate to the anticipated work and added by the contractor, shall be included in the 35% design submitted with the contractor’s proposal. The TO will also identify whether the Long Form or Short Form version of Masterspec is to be used. Once awarded the TO for a specific project, the successful contractor shall electronically edit the specification sections, previously identified, to correspond with the work proposed in the project. A minimum of four (4) sets of edited specifications (or as otherwise required by the TO) shall be provided with each intermediate and final design submittal.
(2) In addition to the technical specifications described above, the latest version of the following references is to be utilized in the preparation of project designs;
Seymour Johnson AFB Architectural Design Standards (Appendix E) American Society of Testing and Materials (ASTM) Standards American National Standards Institute (ANSI) Standards National Fire Protection Code (NFPA), with particulate attention paid to:
| NFPA 101, Life Safety Code |
| NFPA 70, National Electrical Code (NEC) |
| NFPA 72, National Fire Alarm and Signaling Code |
Unified Facilities Criteria (UFC), ALL that apply with particulate attention paid to:
| UFC 3-600-01, Fire Protection Engineering For Facilities |
| UFC 4-010-01, DoD Minimum Antiterrorism Standards For Buildings |
| UFC 4-021-01, Design and O&M: Mass Notification Systems |
| UFC 3-420-01, Plumbing Systems |
| UFC 3-530-01, Design: Interior, Exterior Lighting and Controls |
| UFC 3-230-01, Interior Electrical Systems |
| UFC 3-550-01, Exterior Electrical Power Distribution |
Air Force Instructions, Handbooks, Manuals, etc; ALL that apply International Building Code & NC State Building Code ANSI C-2, National Electrical Safety Code (NESC) ANSI/ASCE 7-95, Minimum Design Loads for Buildings and Other Structures Installation Development and Design (ID2) Seymour Johnson Air Force Base, North Carolina Air Combat Command Installation Sustainability Asessment Report
As well as any applicable manufacturer or industry specifications or recommendations associated with material, supplies, or systems. If a discrepancy exists between these documents, the contractor shall bring this to the attention of the Contracting Officer and shall utilize the most stringent requirement(s) in the preparation of the project design.
During the design period of a project, there will be a Statement of Work along with all the applicable UFCs and various codes as well as Base Architectural Standards. If there is ever an ambiguity, the building codes, Architectural Standards and UFCs will take precedent over the SOW.
FA4809-10-R-0004, Amendment 0007, 21 Oct 2010