This Statement of Work (SOW) details electrical infrastructure upgrades for the NDI Lab/Pen Line B1510 project at Shaw Air Force Base, South Carolina. The project, designated as VLSB 25-2502, requires the contractor to remove existing electrical wiring and install new wiring for various equipment, with specific tasks including replacing circuit breakers, installing new sub-panels, and installing new wiring for dryer and inspection equipment. The work must comply with multiple national and state codes, including the National Electrical Code (NEC), International Building Code (IBC), and Shaw Air Force Base Design and Construction Standards. The contractor is responsible for providing all management, tools, supplies, equipment, labor, and permits, and must conduct work with minimal interference to base operations. A one-year warranty against workmanship defects is required, and the contractor must provide daily reports and participate in a pre-construction meeting with government representatives.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
NDI LAB / PEN LINE B1510
13 Feb 2025 Rev. 1- 16 April 2025
PROJECT: VLSB 25-2502
SCOPE OF WORK:
Remove existing wiring from panel to equipment and install new wiring to new equipment. Ensure wiring is code compliant for new equipment.
(CLIN 0001):
• Replace circuit breaker at main panel that feeds sub-panel with 150 AMP breaker.
• Demo and install 125 AMP sub-panel with 150 AMP sub-panel.
• Demo and install wiring from main panel to sub-panel with 1/0.
• Replace circuit breaker at sub panel for dryer with 70 AMP breaker.
• Demo and install wiring to new dryer equipment with #6 wire.
• Demo and install wiring to new inspection equipment with #12 wire.
• Disconnect air and cap connection to inspection machine.
GENERAL CONSTRUCTION NOTES:
The Contractor is responsible for protection of existing facilities equipment from damage during installation and testing operations.
WARRANTY:
Contractor shall furnish a minimum one-year warranty against defects in workmanship starting on the beneficial occupancy date.
Ensure that any demolition, utility cut and capping, and debris removal service performed at Shaw AFB, South Carolina in completed in such a manner that will restore a neat and professional appearance of base areas.
The facility/area shall be cleaned in its entirety, including exterior areas, before being returned to the government.
GENERAL INFORMATION:
The contractor shall provide all management, tools, supplies, equipment, labor, and applicable licenses and permits necessary to complete the requirements within. All work shall be done in strict accordance with this Statement of Work and subject to the terms and conditions of the contract and in accordance with (UFC) Unified Facilities Criteria, Unified Facilities Guide Specifications (UFGS), the International Building Code (IBC), International plumbing code (IPC), South Carolina Department of Health and Environmental Control (SCDHEC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina Department of Transportation (SCDOT), South Carolina Department of Health and Environmental Control (SCDHEC) Shaw Air Force Base Design and Construction Standards, Change 2, 21 Aug 2018 and all other applicable codes.
A pre-construction meeting will be held at Shaw AFB to include the Contractor and Government representatives. The Government shall set up this meeting, to be held on Shaw AFB, with the Contractor and Government representatives, to discuss all remodel requirements, as well as any other construction issues the Contractor may have. All finishes shall be presented to the project inspector as one submittal for selection and approval prior to installation. All material that could be discontinued shall be on-site, i.e. carpet and tile prior to starting project so there will be no difference in color.
WORKING CONDITIONS:
The Contractor shall take all precautions to ensure that his operations are conducted in a manner as to minimally interfere with the normal operations of the base and the safety and convenience of the base personnel. The contractor shall coordinate utility outages with the Civil Engineering Squadron (CE) service call and the user.
DAILY REPORTS:
The contractor shall provide the government with an electronic copy of each dump receipt along with the daily report by 0800 the following workday.
END OF STATEMENT OF WORK