This document is a preliminary architectural drawing for a facilities repair and installation project at JB Langley-Eustis, Virginia. The project involves the repair and installation of interlinking systems between Facilities 1302 and 1308, with work designated under Air Combat Command, Department of the Air Force, contract identifier DO 50200-0203. The contractor is Midnight Sun-Centennial Kirratchiaq JV, LLC, located in Poquoson, Virginia.
The project notes specify comprehensive fire alarm, power, and equipment work including removal and disposal of existing fire alarm discovery equipment, retention of existing wiring and conduit where possible, and removal of electrical and communication plates following wall restoration. Key scope items include connecting bored conduits at the exterior facility wall, providing new asphalt patching after boring operations, installing multimode fiber between existing network access points, providing and installing new multiplexers in mesh racks, extending existing backbone cable infrastructure from Building 1302 to 1308, providing all fire alarm components necessary for system integration, installing power infrastructure including high-speed multi-mode fiber network cards and associated equipment, ensuring existing MNS signage remains in place with proper text and locks, and removing and reinstalling wall panels as required. The drawing is marked "Preliminary Not for Construction" with a date of 09 July 2024, indicating this represents preliminary design documentation prior to final construction authorization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-101
F A
C
IL
IT
IE
S
A
N D
R E
P A
IR
I
N S
T A
L L
IN
T
E R
L
IN
K
IN
G M
N S
D O
-0
D E
P A
R T
M E
N T
O F T
H E
A
IR
F O
R C
E A
IR
C
O M
B A
T C
O M
M A
N D
J B
L A
N G
L E
Y -E
U S
T
IS
V
A
M
ID
N
IG
H T
S U
N -C
E N
T E
N N
IA
L
K
IR
R A
T C
H
IA
Q J
V L L C
C
IT
Y
H A
L L A
V E
S
U
IT
E A
P O
Q U
O S
O N
V
A
PRELIMINARY
NOT FOR CONSTRUCTION
DATE: 09 JUL 2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BORE UNDERGROUND
AutoCAD SHX Text S
AutoCAD SHX Text
GFCI
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LTA BYPASS
AutoCAD SHX Text
WORLEY RD
AutoCAD SHX Text
WATTS AVE
AutoCAD SHX Text
S ROMA RD
AutoCAD SHX Text
CLARKE AVE
AutoCAD SHX Text
HELMS AVE
AutoCAD SHX Text
WEYLAND RD.
AutoCAD SHX Text
WORLEY RD
AutoCAD SHX Text
WATTS AVE
AutoCAD SHX Text
S ROMA RD
AutoCAD SHX Text
CLARKE AVE
AutoCAD SHX Text
HELMS AVE
AutoCAD SHX Text
WEYLAND RD.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NEW WORK SITE PLAN
AutoCAD SHX Text
SCALE: 1" = 30'-0"
AutoCAD SHX Text
WORK LOCATION
AutoCAD SHX Text
GRAPHIC SCALES
AutoCAD SHX Text
LAFB CIVIL ENGINEERING:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
KEYPLAN
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SHEET X OF X
AutoCAD SHX Text
MUHJ 24-4031
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
BCE DRAWING NUMBER
AutoCAD SHX Text
FY
AutoCAD SHX Text
NEW WORK
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MSCK
AutoCAD SHX Text
PM
AutoCAD SHX Text
XX
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
SUBMITTED BY
AutoCAD SHX Text
XX
AutoCAD SHX Text
09 JUL 2024
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MUHJ 24-4031 F1302 F1308 E-101.DWG
AutoCAD SHX Text
09 JUL 2024
AutoCAD SHX Text
PLOT DATE:
AutoCAD SHX Text
PLOT SCALE:
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
XX
AutoCAD SHX Text
REV
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
APPRVD
AutoCAD SHX Text 1" = 30'-0"
AutoCAD SHX Text 30'
AutoCAD SHX Text
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
AutoCAD SHX Text
PROJECT NOTES
AutoCAD SHX Text DESCRIPTION OF PROJECT: INSTALLING UPGRADED MODULES TO ALLOW FOR COMMUNICATIONS BETWEEN F1302 AND F1308 FOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS.
AutoCAD SHX Text
1. FIRE ALARM, POWER, AND EQUIPMENT: FIRE ALARM, POWER, AND EQUIPMENT: DEMOLITION 1.1. REMOVE AND DISPOSE OF THE POWER AND FIRE ALARM CIRCUITRY FOR THE REMOVE AND DISPOSE OF THE POWER AND FIRE ALARM CIRCUITRY FOR THE EXISTING MNS PANEL. RETAIN EXISTING RACEWAY AND CIRCUITRY TO THE GREATEST EXTENT POSSIBLE FOR REUSE. TO INCLUDE ROOM 112. 1.2. REMOVE ALL ELECTRICAL AND COMM PLATES AS NECESSARY FOR THE WALL REMOVE ALL ELECTRICAL AND COMM PLATES AS NECESSARY FOR THE WALL PAINTING AND REINSTALL ONCE THE PAINTING IS COMPLETED. 1.3. REMOVE EXISTING WALL MOUNTED STROBE AND REINSTALL ONCE PAINTING IS REMOVE EXISTING WALL MOUNTED STROBE AND REINSTALL ONCE PAINTING IS COMPLETED. NEW WORK 1.4. EXCAVATE AND BORE AS NECESSARY TO EXTEND (2) 1" RACEWAYS FROM FACILITY EXCAVATE AND BORE AS NECESSARY TO EXTEND (2) 1" RACEWAYS FROM FACILITY 1302 TO FACILITY 1308 AS DISCUSSED AT THE SITE VISIT. POTHOLE AS NECESSARY AND ASPHALT PATCHING MAY BE REQUIRED. PROVIDE MULE TAPE IN EACH LINE. ONE LINE IS A SPARE FOR POSSIBLE FUTURE WORK. 1.5. AT BOTH FACILITIES CONNECT THE BORED CONDUITS ON THE EXTERIOR FACILITY AT BOTH FACILITIES CONNECT THE BORED CONDUITS ON THE EXTERIOR FACILITY WITH RIGID CONDUIT AND DRILL INTO THE FACILITY TO EXTEND THE RACEWAY INTO THE FACILITY. INSTALL ALL RACEWAY AND SUPPORTS AS NECESSARY TO EXTEND THE RACEWAY TO THE MAIN FACP IN BOTH FACILITIES. RACEWAY MUST MATCH EXISTING, AND BOXES PAINTED PROPERLY AND LABELED ACCORDINGLY. NO ANTENNA, EXISTING WILL REMAIN. MSN MESSAGES NEED TO BE UPGRADED TO THE MOST RECENT. 1.6. PROVIDE AND INSTALL MULTIMODE FIBER BETWEEN THE EXISTING MAIN FACP'S. PROVIDE AND INSTALL MULTIMODE FIBER BETWEEN THE EXISTING MAIN FACP'S. CONNECT AND COMPLETE TEST. TEST RESULTS WILL BE TURNED IN FOR APPROVAL. 1.7. RELOCATE THE EXISTING ANNUNCIATOR NEXT TO THE FRONT DOOR AS DISCUSSED. RELOCATE THE EXISTING ANNUNCIATOR NEXT TO THE FRONT DOOR AS DISCUSSED. 1.8. PROVIDE AND INSTALL A NEW AMPLIFIER IN THE MECH ROOM NEXT TO THE PROVIDE AND INSTALL A NEW AMPLIFIER IN THE MECH ROOM NEXT TO THE EXISTING FACP IN FACILITY 1308. INSTALL RACEWAY AND CONNECT THE NEW AMPLIFIER INTO THE EXISTING FACP. 1.9. PROVIDE AND INSTALL ALL MATERIALS AS NECESSARY TO EXTEND THE RACEWAY PROVIDE AND INSTALL ALL MATERIALS AS NECESSARY TO EXTEND THE RACEWAY AND CIRCUITRY FROM THE OLD MNS PANEL LOCATION TO THE NEW AMPLIFIER TO EXTEND ALL SPEAKER CIRCUITS TO THE NEW AMP. A JUNCTION BOX WILL BE INSTALLED ABOVE THE CEILING AND NEW CONDUITS WILL EXTEND FROM THERE WITH EXISTING WIRING BEING REUSED AND TERMINATED ON TERMINAL BLOCKS. 1.10. PROVIDE AND INSTALL ALL FIRE ALARM COMPONENTS AS NECESSARY TO ENSURE PROVIDE AND INSTALL ALL FIRE ALARM COMPONENTS AS NECESSARY TO ENSURE WE HAVE A COMPLETE AND OPERATIONAL SYSTEM. INSTALLATION TO INCLUDE, HIGH SPEED MULTI-MODE FIBER NETWORK CARDS, DVC VOICE EVAC MNS PANEL, NCA-2, AMP, REMOTE MIC, ACM-24, BATTERY CABINET AND BATTERIES. SHOP DRAWINGS, SUBMITTALS, PROGRAMMING, TESTING AND FINAL CERTIFICATIONS ARE INCLUDED. THE DESIGN WILL BE DONE BY A NICET LEVEL 4 DESIGNER. 1.11. EXISTING MONACO WILL REMAIN IN PLACE. TEXT SIGNS AND LOC’S ARE NOT EXISTING MONACO WILL REMAIN IN PLACE. TEXT SIGNS AND LOC’S ARE NOT S ARE NOT REQUIRED AS PART OF THIS PROJECT. 1.12. REPAIR, PATCH, FINISH TO A LEVEL 4 THE WALL WHERE THE PANEL IS REMOVED REPAIR, PATCH, FINISH TO A LEVEL 4 THE WALL WHERE THE PANEL IS REMOVED IN ROOM 112 AND PAINT ENTIRE BACK WALL TO MATCH EXISTING. THE REMAINDER OF THE ROOM WALLS WILL NOT BE PAINTED. 1.13. REMOVE AND REPLACE CEILING TILES THROUGHOUT BUILDING 1308 (NTE 180SF) REMOVE AND REPLACE CEILING TILES THROUGHOUT BUILDING 1308 (NTE 180SF) AS RELATED TO THE INSTALLATION OF CONDUIT, BOXES AND WIRE ABOVE THE CEILING. 1.14. PROVIDE LANGLEY BUFF CONCRETE AS REQUIRED IF CONCRETE MUST BE PROVIDE LANGLEY BUFF CONCRETE AS REQUIRED IF CONCRETE MUST BE REPLACED OUTSIDE OF THE BUILDINGS. 1.15. PROVIDE ASPHALT PATCHING AS REQUIRED AFTER BORINGS ARE EXCAVATED AND PROVIDE ASPHALT PATCHING AS REQUIRED AFTER BORINGS ARE EXCAVATED AND FILLED AND COMPACTED. 1.16. PROVIDE TOPSOIL & SOD IN EFFECTED AREAS ONLY, WHERE BORING EXCAVATIONS PROVIDE TOPSOIL & SOD IN EFFECTED AREAS ONLY, WHERE BORING EXCAVATIONS ARE REQUIRED TO BE RESTORED TO ORIGINAL ELEVATION AND GRADE.
AutoCAD SHX Text 50200-0203
AutoCAD SHX Text 90'
AutoCAD SHX Text 120'
AutoCAD SHX Text 1.1
AutoCAD SHX Text 1.2
AutoCAD SHX Text 1.3
AutoCAD SHX Text 1.4
AutoCAD SHX Text 1.5
AutoCAD SHX Text 1.7
AutoCAD SHX Text 1.8
AutoCAD SHX Text 1.5
AutoCAD SHX Text 1.13
AutoCAD SHX Text 1.12
AutoCAD SHX Text 1.16
AutoCAD SHX Text 1.16
AutoCAD SHX Text 1.14
AutoCAD SHX Text 1.15
AutoCAD SHX Text 1.14
| Sheets and Views |
| E-101 |
File details come from the government source that posted it. Updated .