4. F1302_1303 MNS project fiber run.pdf

PDF 304 KB Posted

Attached to
Repair of CCTV Fiber Connection
Solicitation number
FA480026Q0097
Issued by

About this file

This document is a preliminary architectural drawing for a facilities repair and installation project at JB Langley-Eustis, Virginia. The project involves the repair and installation of interlinking systems between Facilities 1302 and 1308, with work designated under Air Combat Command, Department of the Air Force, contract identifier DO 50200-0203. The contractor is Midnight Sun-Centennial Kirratchiaq JV, LLC, located in Poquoson, Virginia.

The project notes specify comprehensive fire alarm, power, and equipment work including removal and disposal of existing fire alarm discovery equipment, retention of existing wiring and conduit where possible, and removal of electrical and communication plates following wall restoration. Key scope items include connecting bored conduits at the exterior facility wall, providing new asphalt patching after boring operations, installing multimode fiber between existing network access points, providing and installing new multiplexers in mesh racks, extending existing backbone cable infrastructure from Building 1302 to 1308, providing all fire alarm components necessary for system integration, installing power infrastructure including high-speed multi-mode fiber network cards and associated equipment, ensuring existing MNS signage remains in place with proper text and locks, and removing and reinstalling wall panels as required. The drawing is marked "Preliminary Not for Construction" with a date of 09 July 2024, indicating this represents preliminary design documentation prior to final construction authorization.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E-101

F A

C

IL

IT

IE

S

A

N D

R E

P A

IR

I

N S

T A

L L

IN

T

E R

L

IN

K

IN

G M

N S

D O

-0

D E

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E A

IR

C

O M

B A

T C

O M

M A

N D

J B

L A

N G

L E

Y -E

U S

T

IS

V

A

M

ID

N

IG

H T

S U

N -C

E N

T E

N N

IA

L

K

IR

R A

T C

H

IA

Q J

V L L C

C

IT

Y

H A

L L A

V E

S

U

IT

E A

P O

Q U

O S

O N

V

A

PRELIMINARY

NOT FOR CONSTRUCTION

DATE: 09 JUL 2024

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BORE UNDERGROUND

AutoCAD SHX Text S

AutoCAD SHX Text

GFCI

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LTA BYPASS

AutoCAD SHX Text

WORLEY RD

AutoCAD SHX Text

WATTS AVE

AutoCAD SHX Text

S ROMA RD

AutoCAD SHX Text

CLARKE AVE

AutoCAD SHX Text

HELMS AVE

AutoCAD SHX Text

WEYLAND RD.

AutoCAD SHX Text

WORLEY RD

AutoCAD SHX Text

WATTS AVE

AutoCAD SHX Text

S ROMA RD

AutoCAD SHX Text

CLARKE AVE

AutoCAD SHX Text

HELMS AVE

AutoCAD SHX Text

WEYLAND RD.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NEW WORK SITE PLAN

AutoCAD SHX Text

SCALE: 1" = 30'-0"

AutoCAD SHX Text

WORK LOCATION

AutoCAD SHX Text

GRAPHIC SCALES

AutoCAD SHX Text

LAFB CIVIL ENGINEERING:

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

KEYPLAN

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SHEET X OF X

AutoCAD SHX Text

MUHJ 24-4031

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

BCE DRAWING NUMBER

AutoCAD SHX Text

FY

AutoCAD SHX Text

NEW WORK

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 1.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MSCK

AutoCAD SHX Text

PM

AutoCAD SHX Text

XX

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

REVIEWED BY

AutoCAD SHX Text

SUBMITTED BY

AutoCAD SHX Text

XX

AutoCAD SHX Text

09 JUL 2024

AutoCAD SHX Text

FILE NAME:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MUHJ 24-4031 F1302 F1308 E-101.DWG

AutoCAD SHX Text

09 JUL 2024

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

PLOT SCALE:

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

XX

AutoCAD SHX Text

REV

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

APPRVD

AutoCAD SHX Text 1" = 30'-0"

AutoCAD SHX Text 30'

AutoCAD SHX Text

AutoCAD SHX Text 30'

AutoCAD SHX Text 60'

AutoCAD SHX Text

PROJECT NOTES

AutoCAD SHX Text DESCRIPTION OF PROJECT: INSTALLING UPGRADED MODULES TO ALLOW FOR COMMUNICATIONS BETWEEN F1302 AND F1308 FOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS.

AutoCAD SHX Text

1. FIRE ALARM, POWER, AND EQUIPMENT: FIRE ALARM, POWER, AND EQUIPMENT: DEMOLITION 1.1. REMOVE AND DISPOSE OF THE POWER AND FIRE ALARM CIRCUITRY FOR THE REMOVE AND DISPOSE OF THE POWER AND FIRE ALARM CIRCUITRY FOR THE EXISTING MNS PANEL. RETAIN EXISTING RACEWAY AND CIRCUITRY TO THE GREATEST EXTENT POSSIBLE FOR REUSE. TO INCLUDE ROOM 112. 1.2. REMOVE ALL ELECTRICAL AND COMM PLATES AS NECESSARY FOR THE WALL REMOVE ALL ELECTRICAL AND COMM PLATES AS NECESSARY FOR THE WALL PAINTING AND REINSTALL ONCE THE PAINTING IS COMPLETED. 1.3. REMOVE EXISTING WALL MOUNTED STROBE AND REINSTALL ONCE PAINTING IS REMOVE EXISTING WALL MOUNTED STROBE AND REINSTALL ONCE PAINTING IS COMPLETED. NEW WORK 1.4. EXCAVATE AND BORE AS NECESSARY TO EXTEND (2) 1" RACEWAYS FROM FACILITY EXCAVATE AND BORE AS NECESSARY TO EXTEND (2) 1" RACEWAYS FROM FACILITY 1302 TO FACILITY 1308 AS DISCUSSED AT THE SITE VISIT. POTHOLE AS NECESSARY AND ASPHALT PATCHING MAY BE REQUIRED. PROVIDE MULE TAPE IN EACH LINE. ONE LINE IS A SPARE FOR POSSIBLE FUTURE WORK. 1.5. AT BOTH FACILITIES CONNECT THE BORED CONDUITS ON THE EXTERIOR FACILITY AT BOTH FACILITIES CONNECT THE BORED CONDUITS ON THE EXTERIOR FACILITY WITH RIGID CONDUIT AND DRILL INTO THE FACILITY TO EXTEND THE RACEWAY INTO THE FACILITY. INSTALL ALL RACEWAY AND SUPPORTS AS NECESSARY TO EXTEND THE RACEWAY TO THE MAIN FACP IN BOTH FACILITIES. RACEWAY MUST MATCH EXISTING, AND BOXES PAINTED PROPERLY AND LABELED ACCORDINGLY. NO ANTENNA, EXISTING WILL REMAIN. MSN MESSAGES NEED TO BE UPGRADED TO THE MOST RECENT. 1.6. PROVIDE AND INSTALL MULTIMODE FIBER BETWEEN THE EXISTING MAIN FACP'S. PROVIDE AND INSTALL MULTIMODE FIBER BETWEEN THE EXISTING MAIN FACP'S. CONNECT AND COMPLETE TEST. TEST RESULTS WILL BE TURNED IN FOR APPROVAL. 1.7. RELOCATE THE EXISTING ANNUNCIATOR NEXT TO THE FRONT DOOR AS DISCUSSED. RELOCATE THE EXISTING ANNUNCIATOR NEXT TO THE FRONT DOOR AS DISCUSSED. 1.8. PROVIDE AND INSTALL A NEW AMPLIFIER IN THE MECH ROOM NEXT TO THE PROVIDE AND INSTALL A NEW AMPLIFIER IN THE MECH ROOM NEXT TO THE EXISTING FACP IN FACILITY 1308. INSTALL RACEWAY AND CONNECT THE NEW AMPLIFIER INTO THE EXISTING FACP. 1.9. PROVIDE AND INSTALL ALL MATERIALS AS NECESSARY TO EXTEND THE RACEWAY PROVIDE AND INSTALL ALL MATERIALS AS NECESSARY TO EXTEND THE RACEWAY AND CIRCUITRY FROM THE OLD MNS PANEL LOCATION TO THE NEW AMPLIFIER TO EXTEND ALL SPEAKER CIRCUITS TO THE NEW AMP. A JUNCTION BOX WILL BE INSTALLED ABOVE THE CEILING AND NEW CONDUITS WILL EXTEND FROM THERE WITH EXISTING WIRING BEING REUSED AND TERMINATED ON TERMINAL BLOCKS. 1.10. PROVIDE AND INSTALL ALL FIRE ALARM COMPONENTS AS NECESSARY TO ENSURE PROVIDE AND INSTALL ALL FIRE ALARM COMPONENTS AS NECESSARY TO ENSURE WE HAVE A COMPLETE AND OPERATIONAL SYSTEM. INSTALLATION TO INCLUDE, HIGH SPEED MULTI-MODE FIBER NETWORK CARDS, DVC VOICE EVAC MNS PANEL, NCA-2, AMP, REMOTE MIC, ACM-24, BATTERY CABINET AND BATTERIES. SHOP DRAWINGS, SUBMITTALS, PROGRAMMING, TESTING AND FINAL CERTIFICATIONS ARE INCLUDED. THE DESIGN WILL BE DONE BY A NICET LEVEL 4 DESIGNER. 1.11. EXISTING MONACO WILL REMAIN IN PLACE. TEXT SIGNS AND LOC’S ARE NOT EXISTING MONACO WILL REMAIN IN PLACE. TEXT SIGNS AND LOC’S ARE NOT S ARE NOT REQUIRED AS PART OF THIS PROJECT. 1.12. REPAIR, PATCH, FINISH TO A LEVEL 4 THE WALL WHERE THE PANEL IS REMOVED REPAIR, PATCH, FINISH TO A LEVEL 4 THE WALL WHERE THE PANEL IS REMOVED IN ROOM 112 AND PAINT ENTIRE BACK WALL TO MATCH EXISTING. THE REMAINDER OF THE ROOM WALLS WILL NOT BE PAINTED. 1.13. REMOVE AND REPLACE CEILING TILES THROUGHOUT BUILDING 1308 (NTE 180SF) REMOVE AND REPLACE CEILING TILES THROUGHOUT BUILDING 1308 (NTE 180SF) AS RELATED TO THE INSTALLATION OF CONDUIT, BOXES AND WIRE ABOVE THE CEILING. 1.14. PROVIDE LANGLEY BUFF CONCRETE AS REQUIRED IF CONCRETE MUST BE PROVIDE LANGLEY BUFF CONCRETE AS REQUIRED IF CONCRETE MUST BE REPLACED OUTSIDE OF THE BUILDINGS. 1.15. PROVIDE ASPHALT PATCHING AS REQUIRED AFTER BORINGS ARE EXCAVATED AND PROVIDE ASPHALT PATCHING AS REQUIRED AFTER BORINGS ARE EXCAVATED AND FILLED AND COMPACTED. 1.16. PROVIDE TOPSOIL & SOD IN EFFECTED AREAS ONLY, WHERE BORING EXCAVATIONS PROVIDE TOPSOIL & SOD IN EFFECTED AREAS ONLY, WHERE BORING EXCAVATIONS ARE REQUIRED TO BE RESTORED TO ORIGINAL ELEVATION AND GRADE.

AutoCAD SHX Text 50200-0203

AutoCAD SHX Text 90'

AutoCAD SHX Text 120'

AutoCAD SHX Text 1.1

AutoCAD SHX Text 1.2

AutoCAD SHX Text 1.3

AutoCAD SHX Text 1.4

AutoCAD SHX Text 1.5

AutoCAD SHX Text 1.7

AutoCAD SHX Text 1.8

AutoCAD SHX Text 1.5

AutoCAD SHX Text 1.13

AutoCAD SHX Text 1.12

AutoCAD SHX Text 1.16

AutoCAD SHX Text 1.16

AutoCAD SHX Text 1.14

AutoCAD SHX Text 1.15

AutoCAD SHX Text 1.14

Sheets and Views
E-101

File details come from the government source that posted it. Updated .