1. STATEMENT OF WORK - Fiber Connection.pdf

PDF 131 KB Posted

Attached to
Repair of CCTV Fiber Connection
Solicitation number
FA480026Q0097
Issued by

About this file

This is a Statement of Work (SOW) for repair of a CCTV fiber optic connection at Langley Air Force Base.

The contractor shall repair the fiber optic connection between Building 1308 (Security Office) and Building 1302 (CCTV Camera System) to support the 497th Intelligence, Surveillance, and Reconnaissance Group (ISRG) and the 24/7 mission operations of Distributed Ground System-1 (DGS-1). The scope includes: (1) furnishing and installing one 12-strand single-mode armored fiber from the telecommunications room outside Building 1308 to the Security Office Telecom Cabinet in Building 1302 using existing pathways; (2) terminating both fiber ends with LC SM (single mode) connections in existing or new rack mount fiber enclosures; (3) installing a fiber patch cable to the existing CCTV switch; (4) testing and certifying the new fiber with test reports meeting TIA/EIA Standards; and (5) clearing the work area post-maintenance. The contractor must complete all work within 10 business days from the start date (upon contract award with Government coordination) and provide test reports within 5 business days after completion. Work shall be performed at 586 Weyland Road, JBLE Langley Air Force Base, VA 23665, during normal business hours (0800–1700 EST, Monday–Friday, excluding federal holidays), with all on-site activities coordinated through the Project Manager and Chief of Security Mr. Keith Johnson or the Contracting Officer Representative (COR). Contractor personnel must be escorted by Government representatives at all times. Project completion and acceptance will be determined upon final walk-through with 497 ISRG Inspectors, based on successful operational testing of the CCTV feed and delivery of required fiber certification test reports.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) FOR REPAIR OF CCTV FIBER CONNECTION

1.0 Description of Services

The contractor shall provide all labor, materials, equipment, and management to repair the CCTV fiber connection between Building 1308 (Security Office) and Building 1302 (CCTV Camera System) at Langley Air Force Base (LAFB). The goal of this project is to restore the functionality of the CCTV feed, and involves troubleshooting the current fiber connection, and if necessary, installing new fiber infrastructure to ensure the reliable transmission of CCTV data between the two buildings.

2.0 Scope of Work

The contractor shall repair the fiber optic connection between Building 1308 and Building 1302 to directly support the 497th Intelligence, Surveillance, and Reconnaissance Group (ISRG) and the 24/7 mission operations of Distributed Ground System-1 (DGS-1), providing a comprehensive inspection, clearing of debris, and operational verification of the CCTV.

The desired outcome of this effort is to guarantee the continuous, uninterrupted operational readiness of the facility's CCTV systems. The magnitude of this requirement encompasses the day-to-day use of the CCTV by all security personnel on duty in the multi-story facility. To meet the required standard of quality, the contractor must ensure high-reliability maintenance that prevents hardware-related security breaches, minimizes downtime, and allows for safe, rapid access and departure.

The scope of work includes the following:

2.1 Fiber Installation:

2.1.1 If required, the contractor will furnish and install (1) 12-strand single-mode armored fiber from the telecommunications room (TR) just outside the main entrance of Building 1308 to the Security Office Telecom Cabinet in Building 1302 using the existing pathways.

2.1.2 The contractor will terminate both ends of the fiber with LC SM (single mode) connections and land them in existing/new rack mount fiber enclosures.

2.2 Testing & Certification:

2.2.1 Upon installation, the contractor will test and certify the new fiber, ensuring its functionality, and will provide test reports that meet TIA/EIA Standards to confirm successful installation.

2.3 Fiber Patch Cable Installation:

2.3.1. The contractor will install a fiber patch cable to the existing CCTV switch. Programming of the

CCTV system, if required, is the responsibility of the End User or the CCTV installer.

2.4 Performance Requirements

2.4.1 The contractor will ensure the fiber system is tested and operational, providing all necessary documentation for performance verification.

2.4.2 The contractor shall clear the work area of any tools or materials post-maintenance, ensuring the workspace is as it was before starting the work.

2.4.3 The installation of fiber will follow established industry standards for network cabling and fiber optic systems.

2.5 Timeline

2.5.1 Start Date: Upon contract award with coordination with Government representative.

2.5.2 Completion Date: The work must be completed within 10 business days from the start date, to

STATEMENT OF WORK (SOW) FOR REPAIR OF CCTV FIBER CONNECTION

include troubleshooting findings and any required new fiber installation. Test report must be provided within 5 business days after completion date.

3.0 Coordination

3.1 The contractor must coordinate all on-site activities, including scheduling and access, through the Project Manager and Chief of Security Mr. Keith Johnson or COR.

3.2 Contractor personnel will be escorted at all times by Government representatives while inside the facility.

4.0 General Information

4.1 Hours of Operation: Normal hours of operation are 0800 to 1700 Eastern Standard Time (EST), Monday – Friday, excluding federal holidays. If the contractor wishes to perform services outside of these hours, they must coordinate with the Contracting Officer Representative (COR) and Contracting Officer (CO) no later than one week prior.

4.2 Place of Performance: The work shall be performed at 586 Weyland Rd, JBLE Langley Air Force Base, VA 23665.

4.3 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.

4.4 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office.

The Contractor shall cooperate in any resulting safety investigation.

4.5 Contract Management & Administration

4.6 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

4.7 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

4.8 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

5.0 Inspection and Acceptance: Project will be considered completed upon a final walk-through with 497 ISRG Inspectors. Acceptance will be based on the successful operational test of the CCTV feed and the delivery of the required fiber certification test reports.

File details come from the government source that posted it. Updated .