Solicitation Amendment FA480025B00010003 SF 30.pdf

PDF 1 MB Posted

Attached to
Joint Base Langley - Eustis (JBLE), Virginia - Repair Dormitory, Facility 130 Federal contract opportunity
Solicitation number
FA480025B0001
Issued by
Department of the Air Force Air Combat Command

About this file

This is a Solicitation Amendment (SF 30) for a small business set-aside construction project at Joint Base Langley - Eustis (JBLE) in Virginia. The amendment extends the period of performance for the repair and renovation of Dormitory 130 from 570 to 660 calendar days. The project involves comprehensive upgrades to an unoccupied facility, including demolition and replacement of interior and exterior elements, HVAC system, fire alarm and suppression systems, electrical and telecommunications infrastructure, and structural repairs. The estimated project value exceeds $10 million, with key dates including a pre-bid site visit on 30 June 2025 and a second site visit on 8 July 2025, and pre-bid questions due by 8 July 2025 at 5:00 PM ET. The solicitation is issued by the Department of the Air Force Air Combat Command, with contact emails for antonio.palmer@us.af.mil and michael.costlow@us.af.mil.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base Langley - Eustis (JBLE), Virginia - Repair Dormitory, Facility 130, newest first.
File Type Posted
Solicitation Amendment FA480025B00010004 SF 30.pdf PDF
Atch 12 - Bidder Questions and Government Answers.pdf PDF
Atch 13 - Revised Specifications (15 July 2025)_MUHJ 19-4055 Repair Dorm 130.pdf PDF
Atch 14 - Landscape Drawings_MUHJ 19-4055 Repair Dorm 130.pdf PDF
Atch 15 - Pre-Bid Site Visits Sign-In Sheets_MUHJ 19-4055 Repair Dorm 130.pdf PDF
Solicitation Amendment FA480025B00010002 SF 30.pdf PDF
Solicitation Amendment FA480025B00010001 SF 30.pdf PDF
Atch 10 - AF 3052 Construction Cost Estimate Breakdown (3 April 2025).xlsx XLSX spreadsheet
Solicitation - FA480025B0001_MUHJ 19-4055 Repair Dormitory Facility 130.pdf PDF
Atch 2_Specifications_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 4_ Drawings_Part 2 of 2_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 6_ Calculations_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 3_Drawings_ Part 1 of 2_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 5_ Cutsheets_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 10_AF 3052 Construction Cost Estimate Breakdown (3 April 2025).xlsx XLSX spreadsheet
Atch 1_Statement of Work_MUHJ 19 4055 Repair Dormitory_ Facility 130.pdf PDF
Atch 7_AF Form 66 Submittal Register_MUHJ 19 4055 Repair Dormitory_Facility 130.xlsx XLSX spreadsheet
Solicitation - FA480025B0001_MUHJ 19-4055 Repair Dormitory_Facility 130.pdf PDF
Atch 8 - General Decision Number VA20250022 Revision Number 4 - Building.pdf PDF
Atch 9_ Geotechnical Report_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 11 - Door Replacement Schedule_MUHJ 19-4055 Repair Dorm 130.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following modifications were made:

Information From To

Party to receive Proposal

FA4800

FA4800 633 CONS PKP

ADMIN ONLY NO REQTN CP 757 764 7707, 14 BURRELL

ST BLDG 67

LANGLEY AFB, VA 23665

UNITED STATES

Party to receive Solicitation

FA4800

FA4800 633 CONS PKP

ADMIN ONLY NO REQTN CP 757 764 7707, 14 BURRELL

ST BLDG 67

LANGLEY AFB, VA 23665

UNITED STATES

Section I - Contract Clauses

Additional Regulation or Supplemental Clauses Incorporated by Full Text

The following Clause modifications were made:

52.211-10 Commencement, Prosecution, and Completion of Work. Mar 1984 hereby reads as follows:

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to proceed, (b) 10 prosecute the work diligently, and (c) complete the entire work ready for use not later than .* The time stated for completion shall include final 660 calendar days cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

FA480025B00010003

SUMMARY OF CHANGES
Solicitation/Contract Form
Contract Clauses
IDCode: J
Page: 1
Pages: 2
AmendNo: 0003
EffDate: 17 Jul 2025
ReqNo:
ProjNo: MUHJ 19-4055
IssCode: FA4800
AdmCode:
IssuedBy: FA4800 633 CONS LGCP

14 BURRELL ST BLDG 67, CP 757 225-1669

LANGLEY AFB, VA 23665

UNITED STATES

Antonio Palmer, Email: antonio.palmer@us.af.mil Telephone: 764-5388 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA480025B0001
SolDate: 23 Jun 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment required to extend the Period of Performance for the repair and renovation of Dormitory 130.

a. The period of performance for this solicitation is hereby changed from five hundred-seventy (570) calendar days to six hundred-sixty (660) calendar days.

b. All other terms and conditions of this solicitation remain unchanged.

ContNameTitle:
CoNameTitle: Michael J. Costlow
ContDate:
CODate: 17 Jul 2025

File details come from the government source that posted it. Updated .