Atch 11 - Door Replacement Schedule_MUHJ 19-4055 Repair Dorm 130.pdf

PDF 225 KB Posted

Attached to
Joint Base Langley - Eustis (JBLE), Virginia - Repair Dormitory, Facility 130 Federal contract opportunity
Solicitation number
FA480025B0001
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a detailed Door Replacement Schedule for the MUHJ-19-4055 Repair Dorm project at Joint Base Langley-Eustis (JBLE) in Virginia. The schedule comprehensively lists door replacements across three floors (First, Second, and Third), specifying door numbers, dimensions (3'-0" wide by 7'-0" high), material types (Hollow Metal - HM), and replacement instructions. Key specifications include full door replacements with components such as door, frame, jamb, lockset, closer, and threshold, with a general instruction to re-use existing hardware where possible.

The door schedule notes that this is a supplemental document to be included with other construction documents, with instructions to match existing specifications for most door characteristics. The project is part of a larger facility upgrade estimated to cost over $10 million, involving comprehensive repairs to Building 130, including system replacements, energy-efficient upgrades, and infrastructure improvements. The document is specifically part of a Total Small Business Set-Aside solicitation (FA480025B0001) for the Department of the Air Force Air Combat Command, with a pre-bid site visit scheduled for 30 June 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base Langley - Eustis (JBLE), Virginia - Repair Dormitory, Facility 130, newest first.
File Type Posted
Solicitation Amendment FA480025B00010004 SF 30.pdf PDF
Solicitation Amendment FA480025B00010003 SF 30.pdf PDF
Atch 12 - Bidder Questions and Government Answers.pdf PDF
Atch 15 - Pre-Bid Site Visits Sign-In Sheets_MUHJ 19-4055 Repair Dorm 130.pdf PDF
Atch 13 - Revised Specifications (15 July 2025)_MUHJ 19-4055 Repair Dorm 130.pdf PDF
Atch 14 - Landscape Drawings_MUHJ 19-4055 Repair Dorm 130.pdf PDF
Solicitation Amendment FA480025B00010002 SF 30.pdf PDF
Solicitation Amendment FA480025B00010001 SF 30.pdf PDF
Atch 10 - AF 3052 Construction Cost Estimate Breakdown (3 April 2025).xlsx XLSX spreadsheet
Solicitation - FA480025B0001_MUHJ 19-4055 Repair Dormitory Facility 130.pdf PDF
Atch 2_Specifications_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 4_ Drawings_Part 2 of 2_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 6_ Calculations_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 1_Statement of Work_MUHJ 19 4055 Repair Dormitory_ Facility 130.pdf PDF
Atch 7_AF Form 66 Submittal Register_MUHJ 19 4055 Repair Dormitory_Facility 130.xlsx XLSX spreadsheet
Atch 3_Drawings_ Part 1 of 2_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 5_ Cutsheets_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Atch 10_AF 3052 Construction Cost Estimate Breakdown (3 April 2025).xlsx XLSX spreadsheet
Solicitation - FA480025B0001_MUHJ 19-4055 Repair Dormitory_Facility 130.pdf PDF
Atch 8 - General Decision Number VA20250022 Revision Number 4 - Building.pdf PDF
Atch 9_ Geotechnical Report_MUHJ 19 4055 Repair Dormitory_Facility 130.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

EXTERIOR

HOLLOW

METAL

KICK PLATE

DOOR SCHEDULE NOTES

1.

2.

3.

PROVIDE A FULL REPLACEMENT, INCLUDING BUT NOT LIMITED TO: DOOR, FRAME, JAMB,

LOCKSET, CLOSER, AND THRESHOLD.

PROVIDE NEW CLOSER.

RE-USE EXISTING HARDWARE.

DOOR SCHEDULE GENERAL NOTES

1.

2.

3.

THIS SHEET IS TO BE CONSIDERED SUPPLEMENTAL INFORMATION, TO BE INCLUDED IN

ADDITION TO THE OTHER PROVIDED CONSTRUCTION DOCUMENTS.

IF THIS SHEET AND THE CONSTRUCTION DOCUMENTS CONFLICT, CEN TO

PROVIDE CLARIFICATION.

U.O.N RE-USE EXISTING HARDWARE ON ALL NEW DOORS WHERE POSSIBLE.

N 1st

W

E RT

I G F

H I

G

AMMO

R

A

I

T C

BM

CO

A

N

D

D E

S C

R

IP

TI

O

N

C H

E C

K E

D B

Y

A P

P R

V D

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

R E

V

IE

W E

D B

Y

S U

B M

IT

TE

D B

Y

D A

TE

FI

LE

N A

M E

P

LO

T D

A

TE

P

LO

T S

C A

LE

PROJECT NUMBER

D E

P A

R T

M E

N T

O F

T H

E A

IR

F

O R

C E

A

IR

C O

M B

A T

C O

M M

A N

D

L A

N G

L E

Y A

F B

V A

C

IV

IL

E

N G

IN

E

E R

IN

G

O F

F

IC

E R

E V

D A

TE

MUHJ-19-4055

R E

P A

IR

D

O R

M , 6

C

E S

FA

C

IL

IT

Y

JB

LE

LA

N

G

LE

Y , V

IR

G

IN

IA

J

U N

1:

DO

O

R

SC

HE

DU

LE

, D

O O

R

AN

D

FR

AM

E

TY

PE

S

AN

D

EL

EV

AT

IO

NS

SK-001

DOOR SCHEDULE

D

OO

R

NO

DOOR FRAME

FI

RE

R

AT

IN

G

H

AR

DW

AR

E

SE

T

R

EM

AR

KS

TY

PE

SIZE

M

AT

ER

IA

L

TY

PE

M

AT

ER

IA

L

DETAILS

W

ID

TH

H

EI

GH

T

TH

IC

KN

ES

S

HEAD JAMB SILL

FIRST FLOOR

102 3'-0"

SCALE: 1/4" = 1'-0"

DOOR TYPES

1/4" = 1' - 0" 0 5' 10' 15'1'

3" = 1' - 0" 0 3" 6" 1'

GRAPHIC SCALE(S)

A 7'-0" 1-3/4" HM HM MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

103 A MATCH

EXISTING

HM MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

104 A MATCH

EXISTING

105 A MATCH

EXISTING

106 A MATCH

EXISTING

107 A MATCH

EXISTING

HM MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

108 A MATCH

EXISTING

HM MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

111 2A

115 A

116 A

118 A

119 1A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

120 A

121 A

122 A

123 2A MATCH

EXISTING

124 A

126 A

128 A

136 A

137 1A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

138 A

140 1A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

SECOND FLOOR

216 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

217 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

218 A

219 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

220 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

221 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

223 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

224 A 2

236 A

237 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

238 A

239 A

240 A

241 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

244 A

246 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

247 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

248 A MATCH

EXISTING

250 A MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

251 A MATCH

EXISTING

252 A MATCH

EXISTING

MATCH

EXISTING

253 A MATCH

EXISTING

257 A 2

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

ETR

MATCH

EXISTING

ETR 3

DOOR SCHEDULE

D

OO

R

NO

DOOR FRAME

FI

RE

R

AT

IN

G

H

AR

DW

AR

E

SE

T

R

EM

AR

KS

TY

PE

SIZE

M

AT

ER

IA

L

TY

PE

M

AT

ER

IA

L

DETAILS

W

ID

TH

H

EI

GH

T

TH

IC

KN

ES

S

HEAD JAMB SILL

THIRD FLOOR

324 A

333 A

346 A MATCH

EXISTING

1MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

3'-0" 7'-0" 1-3/4" HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

ETR

ETR ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR

ETR

ETRETR

ETRETRETRETRETR

ETRETR ETR ETR

HM

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR

3'-0" 7'-0" 1-3/4" HM HM

3'-0" 7'-0" 1-3/4" HM HM

3'-0" 7'-0" 1-3/4" HM HM

3'-0" 7'-0" 1-3/4" HM HM

3'-0" 7'-0" 1-3/4" HM

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR

3'-0" 7'-0" 1-3/4" HM HM

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .