Tab_1a_-_OSP_Cable_Specification_Jul_17.docx

DOCX document 805 KB Posted

Attached to
Cable Re-Route Bldg 641 Federal contract opportunity
Solicitation number
FA4800-17-Q-0019
Issued by
Department of the Air Force Air Combat Command

About this file

Cable Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Cable Re-Route Bldg 641, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS-Rev1.docx DOCX document
Engineering_Technical_Letter_02-12.pdf PDF
QUESTIONS_AND_ANSWERS.docx DOCX document
Langley_AFB_Telecommunications_Building_Cabling_Systems_Standards.docx DOCX document
Bldg_641_Cable_Reroute_Plan_(101)_(002).pptx PPTX presentation
Combined_Synopsis1.docx DOCX document
Bldg_641_Cable_Reroute_Plan.pptx PPTX presentation
Bldg_641_Cable_SOO_(revised_).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification For Outside Plant Telecommunications Cable Installation At Langley AFB VA

Jul 2017

1.0 DESCRIPTION OF SERVICES…………………………………………………………...2

2.0 CONSTRUCTION REQUIREMENTS...………………………………………………….2

2.1 General Construction Requirements

2.2 Maintenance hole and Duct Specifications

2.3 Maintenance hole and Conduit Installation

3.0 CABLE INSTALLATION.………………………………………………………………….6

3.1 Cable Requirements

3.2 Terminal Installation

3.3 Copper Splice and Closure Specifications

3.4 Bonding and Grounding

3.5 Cable Tagging and Terminal Stenciling

3.6 Testing

4.0 FIBER OPTIC CABLE INSTALLATION……………………………………………….10

4.1 Maintenance hole Duct Support

4.2 FO Cable Placement

4.3 Fiber Splicing and Splice Closure

4.4 Fiber Termination

4.5 FO Cable Tagging and Terminal Stenciling

4.6 FO Testing

5.0 DRAWINGS……………………………………………………………………………

6.0 APPLICABLE DOCUMENTS, INSTALLATION STANDARDS, SITE

DRAWINGS……………………………………………………………………………

7.0 CONTRACTOR PERSONNEL…………………………………………………………..17

ATTACHMENT 1 - GEOSPATIAL INFORMATION ……………………………………..18

1.0 DESCRIPTION OF SERVICES

1.1 Provide Outside Plant cabling and infrastructure for all Langley AFB users

2.0. SUPPORTING CONSTRUCTION REQUIREMENTS AND SPECIFICATIONS.

2.1. General Construction Requirements

2.1.1. The contractor shall remove asphalt, concrete, and other material/debris IAW with applicable Base Civil Engineers (BCE) codes. Disposition of any excess dirt will be in compliance with BCE codes. Any material used for fill (dirt/aggregate, etc.) and compaction of fill will be in compliance with BCE codes. Contact 633 CS Plans and Programs Office (SCXP) for applicable codes and instructions regarding this requirement.

2.1.2. Any asphalt, concrete curb or sidewalk replacement will be in compliance with BCE codes. Contact 633 CS/SCXP for applicable codes and instructions regarding this requirement.

2.1.3. Coordinate with 633 CS/SCXP to determine if lab testing of removed soil is required.

2.1.4. The contractor will coordinate with BCE to determine the best method (trench, bore, etc.) to install buried ducts. Contact 633 CS/SCXP for applicable codes and instructions regarding this requirement.

2.1.5. The contractors’ bed down area (work storage area) shall be kept clean and orderly and will be free of debris per BCE standards. Contact 633 CS/SCXP for applicable codes and instructions regarding this requirement.

2.1.6. The contractor shall restore all work area sites to its original conditions IAW BCE codes (contact 633 CS/SCXP for applicable codes and instructions regarding this requirement). All grass areas where excavation occurs shall be restored to the same or better conditions by using seed or sod and appropriate fill dirt.

2.1.7. The contractor shall coordinate site restoration requirements with 633 CS/SCXP and 633 CS/Quality Assurance Evaluator (QAE) prior to any site excavations.

2.2. General Maintenance Hole Construction Specifications

2.2.1. Maintenance holes to be connected to or added to the Langley Communications Maintenance hole and Duct System shall have a 10” frame and maintenance hole lid that will not exceed 31¾” (approx.) diameter and will have the word “TELEPHONE” or “COMMUNICATION” on the cover in 2” block letters (See Sketch 2).

2.2.2. All maintenance holes shall be grounded, bonded and racked IAW with applicable standards identified in Section 6.0 and Sketch 4.

2.2.3. Standard maintenance hole dimensions, unless otherwise stated in the specification, shall have a minimum width of 6’, a minimum length of 10’, and a minimum height of 7’ (6’W x 10’L x 7’H).

2.2.4. Smaller maintenance hole (hand hole) dimensions, unless otherwise stated in the specification, shall have a minimum width of 4’, a minimum length of 6’, and a minimum height of 4’ (4’W x 6’L x 4’H).

2.2.5. The contractor may use either a 3”or 6” riser to obtain the correct grade for the final maintenance hole lid elevation (See Sketch 2).

2.2.6. All maintenance hole seams (i.e. neck of maintenance hole, 2-piece pre-cast maintenance holes, duct holes, etc.) shall be sealed to prevent unnecessary ground water from entering maintenance holes (See Sketch 2).

2.2.7. Maintenance holes shall be placed level and plumb in relationship to the ground elevation and the ceiling shall have a minimum 12-18 inches of ground cover, not including the riser and maintenance hole ring (See Sketch 2).

2.2.8. Ground rods shall be installed in all new maintenance holes; use a 3/4" x 10' copper ground rod. The ground rod shall be sealed to prevent unwanted ground water entrance into the maintenance hole. Ground rods shall extend 4” to 6” above the maintenance hole floor (See Sketch 4).

2.2.9. Maintenance holes shall include boding ribbon attached to walls completely around the maintenance hole and attached to the ground rod.

2.2.10. Maintenance holes shall include one (1) 12-inch drain opening and one (1) 1-inch ground rod opening in the base, not less than 6 inches or greater than 12 inches from the wall. All maintenance holes shall have cable-pulling irons installed in the floor opposite each duct entry; a 7/8 inch diameter steel bar forming a triangle of 9 inches per side when set. Galvanize to ANSI/ASTM A153 for irregular shaped articles (See Sketch 4 and 5).

2.2.11. Maintenance holes shall include a metal ladder with steps at 16 inches on center and bolted to maintenance hole neck.

2.2.12. Maintenance holes shall include 36in ladder racks with 3in offsets on all walls spaced 18 inches from walls and 18 inches between racks.

2.2.13. Asphalt type sealant shall be used to seal all joints in maintenance holes.

2.2.14. The contractor shall use a 4” to 6” gravel or other aggregate fill to form a base prior to setting maintenance holes to minimize maintenance hole or handhole settlement after installation.

2.2.15. Four conduits shall be provided between maintenance holes.

2.2.16. Two conduits shall be provided from the maintenance hole to the facility.

2.2.17. Maintenance hole penetrations shall be provided in the corners of the maintenance hole (not the center of the maintenance hole).

2.2.18. All conduits shall penetrate maintenance holes perpendicular to the wall surface plane and have bell-ends. The contractor shall use pre-drilled knockouts or use core drill method to establish holes for placement of ducts into all maintenance holes. Chipping or using a jack hammer method to establish holes for conduit placement into the maintenance hole is unacceptable (See Sketch 7 and 8).

2.2.19. Exact placement of all maintenance holes shall be determined by 633 CS Cable Maintenance (SCOW) and/or 38 EIG/GC based on the contractors recommended solution. Distance between maintenance holes shall not exceed 500’ wall-to-wall for this project.

2.2.20. The contractor shall notify 633 CS/SCXP or the 633 CS/QAE NLT 10-days prior to inspection of the new maintenance hole and duct system proposed under this SPECIFICATION. No cables shall be installed until all maintenance holes have been inspected by 633 CS/QAE.

2.3. General Duct/Conduit Construction Specifications

2.3.1. Grade of PVC conduit (Schedule 40, Schedule 80, etc.) to be used for ducts and/or concrete encasement of ducts will be in compliance BCE codes (See Sketch 6). Contact 633 CS/SCXP for applicable codes and instructions regarding this requirement.

2.3.2. Conduits may be installed by open trench method or by directional boring. The government prefers the most cost effective method.

2.3.3. Conduits shall be buried to allow for a minimum of 36” of select backfill over the top of the proposed duct bank.

2.3.4. Conduits across roads, sidewalks, parking areas, etc. shall be installed a minimum of 42" below grade.

2.3.5. The inside diameter for all conduits shall be 4” (See Sketch 6). Unless otherwise stated, all 4” PVC or HDPE conduits referenced in this specification shall have an inside diameter measurement of 4 inches.

2.3.6. Spacers shall be used where more than one conduit is installed and shall be the standard product of the duct manufacturer for the type and size duct. They shall be located at five-foot intervals, secured to the ducts with #16 gauge iron wire (See Sketch 6).

2.3.7. Conduits shall be joined in such a way as to prevent solid matter from entering the joints. Joints shall form a continuous smooth interior surface between joining conduit sections so that cable will not be damaged when pulled past the joint.

2.3.8. An orange warning tape shall be installed 12”above new conduits. The warning tape shall be of inert plastic film 4 mils thick specifically formulated for prolonged use underground, resistant to alkalis and acids found in soil. It shall have a tensile strength of 30 pounds per 3 inch wide strip. The tape shall bear a continuous printed message repeated every 36 inches. “WARNING COMMUNICATIONS CABLE” or any other suitable warning ribbon approved by 633 CS/QAE.

2.3.9. The contractor shall install suitable duct caps in all new conduits to protect against entrance of dirt and moisture.

2.3.10. Conduits between maintenance holes shall enter and be straight “in-line” so the pattern is identical in each structure (i.e. left top duct in one maintenance hole appears as the right top duct in the other maintenance hole) without any twists along the entire conduit run (See Sketch 7 and 8).

2.3.11. When communication conduits cross either power duct or buried power cable, maintain a minimum separation of 3 inches of concrete or 12 inches of well-tamped earth between the two.

2.3.12. Conduit penetrations into buildings or through above ground foundations, shall be sealed with duct seal or conduit sealer to prevent gas or water entry.

2.3.13. 1800 pound mule tape shall be installed in all new conduits.

2.3.1.4. Contractor shall provide and install a minimum of two 3-cell, 3” multi-cell, collapsible, mesh type innerduct in empty conduits to separate and protect installed cables in the conduits.

2.3.15. Conduits shall be verified serviceable with a test mandrel (non -flexible) or slug that is approximately 12-inches (300 mm) in length and 1/2 inch (13 mm) less than the duct inside diameter to ensure that the conduits diameter is intact and ready for the installation of cables. The 6-inch (300 -mm) test mandrel shall be used to test conduit runs with 90-degree sweeps.

2.3.16. Measurements provided in this specification are approximate only. Contractors shall plan accordingly to anticipate possible changes in measurements depending on exact placement of all maintenance holes. The government is not responsible for material shortfalls due to contractors not performing their own detailed survey to include gathering exact measurements prior to ordering conduit, cables, and/or other project related materials.

2.3.17. The contractor shall notify 633 CS/SCXP or the 633 CS/QAE NLT 10-days prior to inspection of the new maintenance hole and duct system proposed under this SPECIFICATION. No ducts shall be covered with backfill until 633 CS/QAE performs a sample inspection of the installed duct bank. No cables shall be installed until all ducts have been inspected by 633 CS/QAE.

2.4. Interior Pathways

2.4.1. The contractor shall determine the best method of penetration into the facility and location of the demarcation devices using Langley Communications Standards and BCE code as guidance and seek 633 CS/QAE concurrence unless otherwise provided in the specification.

2.4.2. The contractor shall engineer, furnish, and install all hardware and required pathways (EMT conduit, innerduct, cable tray, etc.) once the duct is installed to the building to complete the pathway for cable placement to the Telecommunications Room and on the appropriate demarcation device.

3.0. CABLE INSTALLATION.

3.1. Cable Requirements. The contractor shall install all hardware, ladder racking system, backboard, and other support hardware to facilitate the cable installation. The stubbed tails on the Main Distribution Frame (MDF) connectors shall be installed so the tip cables are feed from the top of the MDF. The tip cables shall be neatly formed on suspended ladder racks and secured IAW applicable Air Force 31W series technical orders.

3.1.1. New MDF connectors shall match the existing connectors.

3.1.2. Form and secure the cable up the backboard to the ladder rack system allowing enough space for the splice while resting on the cable ladder racking system.

3.1.3. For splice closures in the main cable vault, seal the splice using a vault-type re-enterable splice closure with no encapsulant.

3.1.4. All cables larger than 1200-pair shall be 26 American Wire Gauge (AWG). Cables 1200-pair and smaller shall be 24 AWG. All cables shall be pic-filled IAW standards identified in Section 6 of this specification.

3.2. Terminal Installation.

3.2.1 The contractor shall furnish and/or install building entrance terminals (BET) that are Underwriters Laboratory approved for use inside telecommunication rooms and provide the necessary protection IAW applicable commercial and industry standards identified in section of this SPECIFICATION All terminals shall have the three element plug-in gas tube protection modules that meet the requirements in RUS Bulletin 345-83. The plug-in gas tube protector modules shall be provided to protect against transient over voltages and sneak currents.

3.2.2. The BET shall terminate, protect, and distribute metallic cable pairs to within the facility.

3.2.3. Install R355 Space Saver series Central Office Protector Terminals, stubbed, top fed on the MDF on verticals. The contractor shall install similar terminals to insure the MDF is populated with “like kind” terminals. 633 CS/QAE and the 38th Contractor will determine the proper terminals to be installed.

Note: Prior to ordering MDF connectors, the contractor will determine, along with 633 CS QAE, appropriate location for proposed tip splice.

3.3. Copper Splice and Closure Specifications

3.3.1. Only Preformed line products stainless steel re-enterable splice closures specifically designed for underground applications shall be used in this installation. Install following only manufactures directions

3.3.2. The splice closure shall be suitable for pressure encapsulation and shall provide a rigid end plate (plastic or resin laminate) to provide a seal against the cable sheath under pressure for applications at locations where the possibility of immersion exists.

3.3.3. The underground closure shall be sealed, and suitable for enclosing straight, butt, and branch splices in a protective housing. The closure shall be of stainless steel material and shall protect the splice and maintain cable shield electrical continuity in a cable vault, maintenance hole, or hand hole environment.

3.3.4. Filled splice closures shall comply with RUS Bulletin 345-72. The vault closure shall be sealed, non-filled, and suitable for enclosing a straight splice in a closure designed for use in cable vaults.

3.3.5. The closure shall be of a suitable stainless steel or fire retardant material and shall protect the splice and maintain cable shield electrical continuity in a cable vault environment. The number of cable ports in and out of the closure, along with any necessary washers or any plugs for unused ports, shall be suitable for the particular application.

3.3.6. Splices (greater than 100 pair), in which all cables entering the splice is new, will be made with filled 710 modular connectors. Splices 100 pair or less may be made with pic-a-bond connectors. Where pic-a-bond connectors are used, they will be filled. All new splices will utilize the fold-back method.

3.3.7. Splices where existing branch cable is to be transferred in an existing splice use the type connector (710 modular or pic-a-bond) that is in the splice. That is, do not mix 710 modules and pic-a-bond connectors in the same splice.

3.3.8. Dead complements in cables will not be designated as “DD”, “DP”, “XDD” or any variation thereof. Identify dead complements with the appropriate “A” (or B, etc) count.

3.3.9. Splices will be sealed with appropriately sized stainless steel splice cases.

3.3.10. Buried splice cases will be filled with re-enterable encapsulant,

3.3.11. The contractor shall notify the 633 CS QAE NLT 10-days prior to sealing any splice closures so the government can perform a post inspection of the splices.

3.3.12. All splice closures shall be supported using racking clips, cable racks, and cable hooks.

3.3.13. Splicing connectors, both modular and discreet, shall be IAW RUS Bulletin 345-54.

3.3.14. All unspliced pairs in a splice shall be clear capped using the appropriate splice connector.

3.4. Bonding and Grounding.

3.4.1 In existing maintenance holes, bond the splice case to bonding ribbon, where it exists. The contractor shall furnish and install ground and bonding ribbon in existing maintenance holes and hand holes where none exists.

3.4.2. At proposed buried distribution pedestal locations, install a ¾”x10’ copper clad ground. Ground the cable shield, terminal and pedestal to the ground rod. Use corrosion preventive compound on ground connections.

3.4.3. Ground all new MDF connectors and stub cable shields to the MDF buss bar using the appropriate grounding harness and connectors.

3.4.4. At all BET locations where new cable is installed, ground cable shield to the terminal and ground terminal to the Telecommunications Main Grounding Bus bar (TMGB) or Telecommunications Grounding Bar (TGB). Use #6AWG green insulated wire. Use corrosion preventive compound on ground connections.

3.4.5. Shield bonding connectors, bond bars, braids, ribbons, clamps, etc., shall be used to maintain cable shield continuity at splices and at ground connections. Bonding connectors used shall be IAW RUS Bulletin 345-65. Shields shall be grounded and continuous throughout the cable distribution system as specified by RUS TE&CM 451.2.

3.4.6. Hardware such as corrosion resistant grounding rods, wire, clamps, etc. necessary to properly ground the cable distribution system shall be used. Grounding will have a measured grounding potential value of 10 ohms or less and be IAW MILSTD188-124B.

3.4.7. For new maintenance holes install grounding rods at the bottom of the floor inside the maintenance hole near or adjacent to one of the interior corners. The ground rod should extend 6”-8” above the finished floor. Seal the area around the ground rod so no ground water is able to enter the maintenance hole.

3.4.8. Grounds and bonding shall consist of a solid bonding ribbon installed in a closed loop half way between the floor and ceiling of the maintenance holes. Bonding ribbon shall be secured by clamps every 18-24 inches and shall be attached to a ground rod and 6 AWG ground wire.

3.5. Cable Tagging & Terminal Stenciling.

3.5.1. Tags shall be made of plastic corrosion resistive material suitable for submersion under water and stamped with the applicable cable information identified in this SPECIFICATION (refer to EXAMPLE B). Tags will be provided by 633CS/SCOW. (Note 633CS/SCOW will need two week notice for tag manufacturing)

3.5.2. Tag new cables and retag existing cables that is to be re-used. In the cable vault, tag each tip cable. In maintenance holes place a tag on each cable on each side of the splice. In Communication Rooms, tag cable near cable entry point and at the terminal. Tag cables as they pass through a pull box or an LB. Tag cables where they are exposed in basements. Tag to include cable type, cable number, and count.

Example: P9-24FF 26, 1501-2400+ A, 601-900

3.5.3. Stencil new terminals and re-stencil existing terminals to be retained. Stencil all terminals as determined acceptable by 633 CS/QAE. Cable Terminal Covers shall be marked with terminal number, cable number, and terminal count.

Example: T-945

CA 26

1501-2400

3.6. Testing. All test results will be required as applicable to this project. Test results will be required 10 days after completion of all testing. 3 copies will be submitted. One copy will be sent to the identified POC at Langley. 2 copies will be provided to the 38th Contracting Office.

3.6.1. Existing Cables. Prior to splicing, test existing pairs to be spliced into the new cable. The contractor’s tests shall check for cable faults (grounds, shorts, crosses, opens), splicer’s errors (splits, reverses, transpositions), shield continuity and insulation resistance (insulation resistance on existing cables is accomplished on spare pairs only). The contractor shall not be responsible for correcting existing cable faults, splicer’s errors, open shield continuity or low insulation resistance; however, the 633 CS QAE must be notified of such conditions immediately upon identification so the government can correct the deficiencies.

3.6.2. New Cables. After splicing and terminating new cable and prior to splicing any new cable into existing cable, the new cable will be tested and documented to be free of cable faults (grounds, shorts, crosses, and opens) and splicer’s errors (splits, reverses, and transpositions).

3.6.3. After splicing and terminating new cable and prior to splicing new cable into existing cable, insulation resistance as tested on a minimum of three conductors in each 25 pair group of the new cable against all other conductors of the cable and the shield, shall be documented to be of a value that is satisfactory for the length and type cable being tested.

3.6.4. After splicing and terminating new cable and prior to splicing new cable into existing cable, test to ensure the cable shield is continuous from the MDF to each distant termination point.

3.6.5. After splicing new cable into existing cable test the cable for end-to-end cable faults (grounds, shorts, crosses, and opens) and splicer’s errors (splits, reverses, and transpositions). Any cable faults or splicer’s errors not documented on existing cable test shall be cleared by the contractor, if caused by the new cable installation.

3.6.6. Insulation resistance as tested on a minimum of three non-working conductors in each 25 pair group of the cable shall be documented to be of a value that is satisfactory for the length and type cable being tested.

3.6.7. Loop Resistance Tests: After all splicing and terminating is complete, make a D.C. loop resistance measurement on all affected (non-working) cable pairs. Measure from all terminals back to the cable origin or central office

3.6.8. Cable Shield Continuity. Test to ensure the cable shield is continuous from the MDF to each distant termination point.

3.6.9. Test results may be recorded on locally developed test sheet.

3.6.10. Where the contractor uses an existing ground point, it shall be tested prior to being connected to the system. Even though the National Electrical Code calls for a resistance to ground not to exceed 25 ohms, Military Handbook 419A, paragraph 2.2.2.2 states that 25 ohms is not low enough. In order to protect personnel and equipment, MIL-HDBK 419A recommends a design goal of 10 ohms for communications systems where practical. If the ground point proves unsuitable, the contractor shall notify the 633 CS QAE in writing of the defective ground. The tests to be performed on the grounds shall measure the ground potential (ability to dissipate voltage through the ground point to the earth).

4.0. FIBER OPTIC (FO) CABLE INSTALL

4.1. Maintenance hole Duct Support

4.1.1. The government mandates the use of three, 3-inch, 3 cell Maxcell cloth, collapsible, mesh type inner duct with tracer wirer to be used during this installation. Each mesh type innerduct shall be provided with a different colored pull cord. If needed, the 633 CS/QAE shall assist the contractor in identifying sources where this specific type of inner duct may be acquired.

4.1.2. All inner ducts shall be secured in maintenance holes and hand holes. The inner duct needs to be secured to prevent the inner duct from creeping back into the 4” ducts during cable placement.

4.1.3. All FO cables shall be racked IAW applicable standards identified in this specification.

4.2. FO Cable Placement

4.2.1 All FO cables will be installed as homeruns to the nearest ITN designated by 633 CS/SCXP. No splices will be present for any new fiber optic installs.

4.2.1.1 The contractor shall provide for a 50-ft maintenance loop of FO cables in maintenance holes IAW applicable standards identified in Section 6 of this specification.

4.3. Fiber Splicing and Splice Closures

4.3.1 Splices will only be present if exception is approved by 633 CS/SCXP. All FO cables will be homeruns to nearest ITN.

4.3.2. All splice closures shall meet the same specifications identified in Section 3 of this specification as relative to fiber optic cable splices in maintenance hole applications.

4.3.3. All cables shall be spliced by fusion method and sealed in an air tight closure with encapsulation.

4.4. Fiber Terminations

4.4.1. All terminations shall be the “SC” type connectors.

4.5. FO Cable Tagging & Terminal Stenciling.

4.5.1. The contractor shall tag FO cables the same as for copper cables identified in Section 3 of this specification (refer to EXAMPLE B). See the example below for maintenance holes:

Example: 72L8.3F

FO 1025/945, 1-24

4.5.2. The contractor shall stencil the FODP for each facility the same as for copper terminals identified in Section 3 of this specification. See the example below for building applications:

Example: FO 1025/945, 1-24

4.6 Testing FO Cables

4.6.1. The contractor shall test all FO cables using Power meter and light source for the following as a minimum:

a. End-to-End to obtain distance

b. Power loss measurements (dB loss as compared to distance)

Note: 633 CS/QAE shall determine preferred method of testing IAW applicable standards for Langley AFB.

4.6.2. The contractor shall provide documentation reflecting all measurements and test results the same as identified in Section 3 of this specification.

5.0. Drawings.

5.1.1. The contractor shall provide all drawings in either AutoCAD or Microstation formatted drawings to 633 CS/SCXP. The contractor shall contact 633 CS/SCXP for information regarding software requirements to accomplish all CSIR updates identified in this SPECIFICATION.

5.1.2. The contractor shall provide field drawn maintenance hole detail (butterfly drawing) as a preliminary drawing before submitting the official as-built drawings (refer to EXAMPE A).

6.0. APPLICABLE DOCUMENTS, INSTALLATION STANDARDS, SITE DRAWINGS.

6.1.1 The Contractor shall comply with all federal laws, codes, regulations, and statutes applicable to performance of this contract, including but not limited to those specified in the tables below. The following tables provide locations where some documents may be obtained. It is the Contractor's responsibility to obtain and adhere to all applicable federal standards. The Government will identify and provide the location to the contractor to obtain equipment-unique technical documentation to support Government Furnished Property (GFP).

6.1.2. The federal, state, commercial, and military standards listed below were used to develop and engineer this proposed installation. The contractor shall have a working knowledge and apply these standards to complete the tasks identified in this specification. All standards that are applicable to this installation will be used by government representatives for final acceptance of this project.

6.2. Federal.

NUMBER
TITLE
WEBSITE OR LOCATION
OSHA
Occupational Safety and Health Administration (OSHA)
http://www.osha.gov
EPA
Environmental Protection Agency (EPA)
http://www.epa.gov/
EPA
EPA Rules, Regulations, and Legislation
http://www.epa.gov/epahome/rules.html
FAA
Federal Aviation Authority (FAA) Regulation and Certification
http://www.faa.gov/avr/index.cfm
RUS Bulletin 1753F-150
Rural Utility Services (RUS) Form 515a - Specifications and Drawings for Construction of Direct Buried Plant
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-151
RUS Form 515b - Specifications and Drawings for Construction of Underground Plant
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-153
RUS Form 515d - Specification and Drawings for Service Installation at Customer Access Locations
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-401
Standards for Splicing Copper and Fiber Optic Cable PC-2)
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-302
Specifications for Outside Plant Housings and Serving Area Interface System (PE-91)
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Regulation 1755.900
Specification for Filled Fiber Optic Cables
http://www.usda.gov/rus/telecom/publications/publications.htm
RUS Bulletin 345-29
Self Supporting Cable (PE-38)
USDA/RUS/PDRA, Attn: Adam Miller, 1400 Independence Ave., Room 4028-S, Washington DC 20256
RUS Bulletin 345-65
Shield Bonding Connectors (PE-33)
USDA/RUS/PDRA, Attn: Adam Miller, 1400 Independence Ave., Room 4028-S, Washington DC 20256
RUS Bulletin 1753F-205
Specification for Filled Telephone Cable (PE-39)
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-801
Service Installations at Customer Access Locations (PC-5A)
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 345-54
REA Specification for Telephone Cable Splicing Connectors (PE-52)
USDA/RUS/PDRA, Attn: Adam Miller, 1400 Independence Ave., Room 4028-S, Washington DC 20256
RUS Bulletin 345-72
Specifications for Filled Splice Closures, PE-74
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 345-83
Specification for Gas Tube Surge Arresters, PE-80
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-207
Specifications for Terminating Cables (PE-87)
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-208
Specifications for Filled Telephone Cables with Expanded Insulation (PE-89)
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1753F-601
Specifications for Filled Fiber Optic Cables (PE-90)
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1751F-640
Design of Buried Plant, Physical Considerations
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1751F-641
Construction of Buried Plant
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1751F-642
Construction Route Planning Of Buried Plant
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1751F-643
Underground Plant Design
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1751F-644
Underground Plant Construction
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1751F-805
Electrical Protection at Subscriber Stations
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS Bulletin 1751F-815
Electrical Protection of Outside Plant
http://www.usda.gov/rus/telecom/publications/bulletins.htm
RUS TE&CM, Section 825
Situations Requiring Special Protection
USDA/RUS/PDRA, Attn: Adam Miller, 1400 Independence Ave., Room 4028-S, Washington DC 20256
RUS TE&CM 451.2
Specifications for Installation, and Shield Continuity
USDA/RUS/PDRA, Attn: Adam Miller, 1400 Independence Ave., Room 4028-S, Washington DC 20256
DODD 5220.22
DOD Industrial Security Program Directive
http://www.dtic.mil/whs/directives/corres/html/522022.htm
DoD JTA ver. 4
Department of Defense Joint Technical Architecture
http://www-jta.itsi.disa.mil/jta/JTA40_071702.pdf
AFI 33-133
Joint Technical Architecture – Air Force
http://www.e-publishing.af.mil/pubfiles/af/33/afi33-133/afi33-133.pdf
FAA Handbook OA P 8200.1
United States Standard Flight Inspection Manual
http://avnwww.jccbi.gov/icasc/PDF/82001a.pdf

6.3. Air Force Standard Installation Practices Technical Orders.

NUMBER
TITLE
31-10-2
Fanning and Forming Conductors for Ground C-E Equipment
31-10-6
Cable Racks, Troughs and Their Supports
31-10-7
Terminating and soldering Electrical Connections
31-10-9
Marking Site Layouts
31-10-10
Anchoring Devices for Ground C-E Equipment
31-10-11
Cross-connections and Strapping of Fixed Ground C-E Components
31-10-12
Metal Ducts and Conduits
31-10-13
Cabling for Fixed Ground C-E Equipment
31-10-24
Grounding, Bonding, and Shielding
31-10-27
Equipment Designations
31-1-141
Basic Electronics Technology
31R-10-5
Antenna Systems Maintenance, Repair, and Testing
31S9-2GSS42-1
Exterior Intrusion Detection System (EIDS)
31-10-34
Standard Installation Practices – Fiber Optic Communication Cables And Connectors
31W3-10-12
AF Communication Command (E-1 Standard) -- Standard Installation Practices -- Outside Plant Cable Placement
31W3-10-13
AF Communications Service (Engineering- Installation Standard) -- Standard Installation Practices -- Outside Plant Cable Splicing
31W3-10-15
Air Force Communications Command (E-I Standard) - Outside Plant Cable Testing
31W3-10-22
Telecommunications Engineering, Outside Plant Telephone

(Copies of the above documents may be obtained from SM-ALC/MMEDTD, McClellan AFB, CA 95652 - 5609.)

6.4. Military Standards.

NUMBER
TITLE
MIL-HDBK-419A
Grounding Bonding and Shielding for Electronic Equipment and Facilities
MIL-STD-188-124B
Grounding Bonding and Shielding
MIL-HDBK-1857
Grounding, Bonding and Shielding Design Practices
MIL-HDBK-454A
General Guidelines for Electronics Equipment

(Copies of the above documents may be obtained from the Naval Publications and Forms Center (NPFC 105), 5801 Tabor Ave, Philadelphia PA 19120.)

6.5. State, Local, and Site-specific Regulations. The Contractor shall comply with all applicable state, local, and site-specific codes, regulations, and statutes related to the specific task order.

6.6. Commercial Standards and Manuals. The Contractor shall comply with the following commercial standards where applicable. Other commercial standards may apply to individual projects and will be stated in individual task orders. It is the Contractor's responsibility to identify and obtain applicable standards.

NUMBER
TITLE
WEBSITE OR LOCATION
NFPA 70
National Fire Protection Association (NFPA)
http://www.nfpa.org/
ANSI
American National Standards Institute (ANSI) and Internet Standards Resources
http://www.ansi.org/
ANSI/ASTM A153
Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
http://www.ansi.org/
EIA/TIA
Engineering: EIA/TIA Standards

See Commodity Specific Appendices and Individual Task Orders http://www.eia.org/ http://www.tiaonline.org/

TIA/EIA-526-7
Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant – OFSTP-7
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-526-14
Optical Power Loss Measurement of Installed

Multimode Fiber Cable Plant – OFSTP-14 http://www.eia.org/ http://www.tiaonline.org/

TIA/EIA-568-B.1
Commercial Building Telecommunications Cabling Standard Part 1: General Requirements
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-568-B.2
Commercial Building Telecommunications Cabling

Standard Part 2: Balanced Twisted-Pair Cabling Components http://www.eia.org/ http://www.tiaonline.org/

TIA/EIA-568-B.3
Commercial Building Telecommunications Cabling Standard Part 3: Optical Fiber Cabling Components Standard
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-569
Commercial Building Standards for Telecommunications Pathways and Spaces
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-570
Residential Telecommunications Cabling Standard
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-598
Optical Fiber Cable Color Coding
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-606
Administration Standard for the Telecommunications Infrastructure of Commercial Buildings
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-607
Commercial Building Grounding and Bonding Requirements for Telecommunications
http://www.eia.org/

http://www.tiaonline.org/

TIA/EIA-758
Customer-Owned Outside Plant Telecommunications Cabling Standard
http://www.eia.org/

http://www.tiaonline.org/

EIA-310
Racks, Panels and Associated Equipment
http://www.eia.org/

http://www.tiaonline.org/

EIA SP-2840-A
Commercial Building Telecommunications Cabling Standard
http://www.eia.org/

http://www.tiaonline.org/

ICEA S-80-576
Telecommunications Wire and Cable for Wiring of Premises
Insulated Cable Engineer Association, Inc., P.O. Box P, South Yarmouth MA 02664; Telephone (508) 394-4424
GR-409
Generic Requirements for Premises Fiber Optic Cable
http://telecom-info.telcordia.com/site-cgi/ido/index.html
GR-20
Generic Requirements for Optical Fiber and Optical Fiber Cable
http://telecom-info.telcordia.com/site-cgi/ido/index.html
NEMA TC 2
Electrical Polyvinyl Chloride (PVC) Tubing and Conduit
http://www.nema.org/index_nema.cfm/1260/
NEMA TC 6&8
PVC Plastic Utilities Duct for Underground Installations
http://www.nema.org/index_nema.cfm/1260/
NEMA TC 9
Fittings for PVC Plastic Utilities Duct for Underground Installation
http://www.nema.org/index_nema.cfm/1260/

6.7. Specification Drawings:

Sketch 1, Maintenance Hole/Duct Installation Specifications

Sketch 2, Maintenance Hole and Ring Specifications

Sketch 3, Maintenance Hole Racking and Bonding Specifications

Sketch 4, Maintenance Hole Racking and Bonding Specifications

Sketch 5, Duct/Trench Configuration

Sketch 6, Duct/Trench Configuration

Sketch 7, Duct/Trench Configuration

Sketch 8, Maintenance Hole Duct/Cable Assignment

6’W x 12’L x 7’H Typical Manhole Butterfly Figure 5.1

Notes:

1.1. Ducts shall be flush and perpendicular to the manhole wall and shall have a 2” separation between ducts.

1.2. Ducts shall have a minimum 24” of separation from the manhole ceiling and 4” from the wall. All measurements are from inside the manhole.

1.3. The contractor should use the specifications in section of this SOW for exact details for manhole and duct installation

= existing = proposed

Manhole and Duct Placement Figure 1.2 24” to 36” from manhole ceiling (inside).

6’W x 12’L x 7’H 24” to 36” from manhole ceiling (inside).

Typical duct diagram Figure 1.3 4” from manhole wall/ceiling (inside). See note 2.

2” between ducts (see note 1)

= existing ducts = new ducts

LANGLEY AFB VA

MANHOLE/DUCT INSTALLATION SPECIFICATIONS

SKETCH 1

NOT TO SCALE 7 JUL 17

Notes:

2.1. The pre-cast manhole depicted in Figure 2.1 is intended to provide general specifications. The contractor shall provide manholes that meet all specifications identified in this S.O.W.

2.2. “Communications” may be substituted with “Telephone” but must be as depicted in Figure 2.2 and 2.3. Letters shall be a height of 2”.

2.3. The sump hole shall be 10”-12” in diameter and shall be centered directly below the manhole cover

LANGLEY AFB VA

MANHOLE RING AND LID

SKETCH 2

NOT TO SCALE 7 JUL 17

10 “ 31 ¾ ”

COMMUNICATIONS

2 “ Manhole Lid and Ring (Typical) Figure 2.2 Letters for Manhole Lid (Typical) Figure 2.3 Pre-cast Manhole (Typical) Figure 2.1

3.1. The pre-cast hand hole depicted in Figure 3.1 is intended to provide general specifications. The contractor shall provide hand holes that meet all specifications identified in this S.O.W.

3.2. The sump hole shall be 10”-12” in diameter and shall be centered directly below the manhole cover

LANGLEY AFB VA

HAND HOLE SPECIFICATIONS (TYPICAL)

SKETCH 3

NOT TO SCALE 7 JUL 17

Figure 3-1 Notes:

4.1. Racks installed from wall-to-wall centerline and floor to ceiling centerline on 18”- 24” centers

4.2 Use 37-hole cable racks

4.3. Install bonding ribbon 360 degrees around the interior wall 8-12” from manhole centerline. Secure bonding ribbon every 18’ - 24” with bonding ribbon clamps. Attach bonding ribbon to the manhole ground rod.

4.4. All racks shall be attached to the manhole walls using the standoff brackets as depicted in figure 4.1 to 4.6 Manhole Racking Diagram Side View (Typical) Figure 4.6 Cable Rack Standoffs, Handholes (Typical) Figure 4.4 Cable Rack Standoffs, Manhole (Typical) Figure 4.5

LANGLEY AFB VA

MANHOLE RACKING AND BONDING (TYPICAL)

SKETCH 4

NOT TO SCALE 7 JUL 17

Centerline Centerline Manhole Racking Diagram (Typical) Figure 4.1 18” 18” 18” Cable Rack (Typical) Figure 4.2 Cable Rack Standoff/Support ½” x 2 ½” galvanized bolt with ½” concrete insert 18 or 37-hole Rack Manhole Bonding Ribbon and Clamps (Typical) Figure 4.3 8-12” 4-6” ¾” x 10’ Ground Rod

5.1. All manholes shall have corner racks installed (4 ea) to support cables entering manholes

5.2. Manhole/hand hole sump pump holes shall be 10-12” in diameter and a minimum depth of 4”

LANGLEY AFB VA

MANHOLE CORNER RACKING (TYPICAL)

SKETCH 5

NOT TO SCALE 7 JUL 17

12” Manhole Corner Racking Diagram (Typical) Figure 5.1 Manhole Corner Racking Diagram

Figure 5.2

6.1. Ducts installed by open trench method shall have spacers as depicted in figure 6.1.

6.2. Ducts shall be even and level perpendicular to the ground and shall have a minimum 36” of backfill.

6.3. Concrete encase all ducts in all areas where backfill is less than 36”

6.4. For non-concrete encased ducts, use 36” of filled dirt compacted to final grade Duct/Trench Diagram (Typical) Figure 6.1 4” Separation

EARTH

TRENCH WALL

EARTH

EARTH

EARTH

4” PVC Ducts Plastic Stack/Spacers Slurry to Asphalt/Concrete if trenching in road/walkway Concrete Slurry Cover Min 36” Ground Surface to top of duct bank Min 6” Slurry Cover

UNPAVED OR DIRT

DIRT FILL – COMPACT TO MATCH

SURROUNDING GRADE

ASPHALT/CONCRETE SURFACES

LANGLEY AFB VA

DUCT/TRENCH CONFIGURATION (TYPICAL)

SKETCH 6

Duct/Trench Diagram

Figure 7.2 Duct/Trench Diagram (Typical) Figure 7.1

EARTH

COMMON TRENCH

CONTAINING DUCT STACKS

FOR PARTIAL SWEEP ANGLES, 20 FOOT SECTIONS SHALL

BE USED TO PRODUCE THE DESIRED BEND. HOWEVER, THE

TOTAL SWEEP RADIUS SHALL BE DETERMINED BY THE MAXIMUM

NATURAL BENDING CAPABILITY OF A 20 FOOT SECTION OF CONDUIT

DUCT STACKS HAVE A MINIMUM 10 FEET OF STRAIGHT

DUCT PERPENDICULAR TO THE CORED ENTRANCE OF THE

MANHOLE OR HANDHOLE. SWEEPS WILL NOT BEGIN WITHIN 10 FEET

MANHOLE OR HANDHOLE.

TYPICAL 6’ X 7’ X 10’ MANHOLE

COMMON TRENCH

CONTAINING DUCT STACKS

PRIOR TO BACKFILLING TRENCH:

1. INSURE PVC END BELL IS IN PLACE

2. INSURE DUCT PENETRATIONS ARE SEALED

EARTH

15 FOOT MINIMUM RADIUS IN ANY GIVEN SECTION

OF THE 90DEGREE DUCT SWEEP. DUCT SWEEPS SHALL

BE ASSEMBLED FROM THE FACTORY PRODUCED 20 FOOT

OF 4” PVC CONDUIT.

COMMON TRENCH

CONTAINING DUCT STACKS

Notes:

7.1. Ducts installed by open trench method shall have spacers as depicted in figure 7.1.

7.2. Ducts shall be even and level perpendicular to the ground and shall have a minimum 36” of backfill.

7.3. Concrete encase all ducts in all areas where less than 36” of select backfill can be obtained

7.4. Prior to final acceptance of duct work insure mandrel test of each duct is completed.

7.5. PVC ducts shall not be heated to produce larger bend radius.

LANGLEY AFB VA

DUCT/TRENCH CONFIGURATION (TYPICAL)

SKETCH 7

Duct/Trench Diagram

Figure 8.2 Top of manhole Ducts flush and perpendicular to the manhole wall. Each duct shall have a 45 degree bell end installed flush with the inside wall of the manhole.

Ducts shall be back filled with a minimum 24” to 36” of ground cover

LANGLEY AFB VA

DUCT/TRENCH CONFIGURATION (TYPICAL)

SKETCH 8

NOT TO SCALE 7 JUL 17

10 feet 10 feet Duct/Trench Diagram (Typical) Figure 8.1 Notes:

8.1 Ducts shall extend straight and perpendicular to the manhole and/or handhole walls for 10 feet prior to cored entrances as depicted in figure 8.1

8.2 Concrete encase all ducts in all areas where backfill is less than 36”

8.3 Install bell ends at manhole penetrations or cores as depicted in Figure 8.2

15 FOOT MINIMUM RADIUS IN ANY GIVEN SECTION

OF THE 90DEGREE DUCT SWEEP. DUCT SWEEPS SHALL

BE ASSEMBLED FROM THE FACTORY PRODUCED 20 FOOT

SECTIONS OF 4” PVC CONDUIT.

31¾ ”

7.0. CONTRACTOR PERSONNEL.

7.1.1. Program Manager. The contractor shall provide a Program Manager (PM) and alternate(s) responsible for contract performance and continuity.

7.1.2. The contractor shall identify the Program Manager or alternate's range of authority to act for the contractor relating to daily contract operation.

7.1.3. The Contractor shall designate the Contractor's on-site team leader and alternate(s) as the Site POC for individual projects in their Site Visit Request Letter.

7.1.4. The Site POC or alternate(s) shall be on site during duty hours until project completion. The Site POC shall be the interface for all work site communications with the government, including quality, safety, and discrepancy matters. The Site POC shall provide 633 CS/SCXP and 633 CS/QAE with their contact information (i.e. phone number, e-mail, etc.).

7.1.5. The Contractor Program Manager shall provide the following while performing any tasks associated with this SPECIFICATION to the Base Communication Officer’s designee, 633 CS/SCXP Plans and Programs Office:

7.1.5.1. Weekly project status report to 633 CS/SCXP.

7.1.5.2. A project timeline that illustrates critical milestones and/or other significant points of interest (i.e. road closures, facility access, etc.).

7.1.5.4. Changes in schedule or delays that will cause a change in the project timeline.

7.1.5.5. Submit all work order clearance requests (digging permits) to 633 CS/SCXP NLT 2 weeks in advance of schedule excavations.

7.1.6. The Program Manager, Site POC, and respective alternate(s) shall be able to read, write, speak, and understand English. The Site Visit Request Letter shall be submitted to the 1st Communications Squadron’s Plans and Programs Flight not later than two weeks prior to base visit or as negotiated on individual task orders. The Visit Request Letter shall be IAW AFFARS 5352.242-9000.

7.1.7. The Contractor shall contact 633 CS/SCXP 10-days in advance to obtain electronic copies of the CSIRS. 633 CS/SCXP shall provide two (2) copies of the base CSIRS in electronic format.

8.0. GEOSPATIAL INFORMATION

8.1.1 Format (see Attachment 1). The contractor shall provide geospatial information identified in attachment 1 of the specification.

8.1.2. Data Delivery. The contractor shall provide the geospatial information in electronic format to each of the following:

633 CS/SCXP,

240 Smythe Road.

Langley AFB, Va. 23665

38 EIG/GCA, Attn: Langley AFB STEM-B 4064 Hilltop Rd.

Tinker AFB, OK 73145

ATTACHMENT 1

GEOSPATIAL INFORMATION

1.0 General Global Positioning System Service Requirements

1.1. The Contractor shall use GPS equipment supplemented with land surveying equipment and electronic underground cable locating equipment needed to locate direct buried cable, necessary to collect required Communication Feature Location Data (CFLD) following the “Geospatial Positioning Accuracy Standards, Part 4: Architecture, Engineering, Construction, and Facilities Management,” (FGDC)-STD-007.4-2002 published by the Federal Geographic Data Committee.

This standards document can be found at http://www.fgdc.gov/standards/projects/FGDC-standards-projects/accuracy/part4/FGDC-endorsed-standard . Coordinates of communication features shall be located to within one foot spatial accuracy in the horizontal plane at the 95% confidence level. The methodology used for testing and reporting accuracy shall be in accordance with the Geospatial Positioning Accuracy Standards, Part 3: “National Standard for Spatial Data Accuracy”, (FGDC)-STD-007.4-2002) This standards document can be found at: http://www.fgdc.gov/standards/projects/FGDC-standards-projects/accuracy/part3/chapter3

1.2. Geospatial data shall overlay on the installation’s most current orthorectified imagery provided by 633CES/CEG Langley AFB, Virginia. The collected data will incorporate the coordinate and projection system of the imagery, NAD 83 Virginia State Plane South, FIPS 4502.

1.3. Required Attribute Data and Metadata for CFLD Population

1.3.1. The contractor shall use GPS to determine horizontal position of communication features and shall record all required CFLD.

1.3.2. Entity naming convention, attribute fields, and domain values used for data entry in Appendix A are derived from the 38th EIG Communications Mission Data Set Schema.

1.3.3. The contractor shall complete all metadata elements marked mandatory and mandatory-if-applicable as defined by the FGDC Content Standards for Digital Geospatial Metadata for each set of CFLD collected. This standards document can be found at: http://www.fgdc.gov/standards/projects/FGDC-standards-projects/metadata/base-metadata/v2_0698.pdf

1.3.4. Metadata must include an NSSDA accuracy statement at the 95% confidence level. “Geospatial Positioning Accuracy Standards, Part 3: National Standard for Spatial Data Accuracy,” published by the Federal Geographic Data Committee (FGDC), dated July 1998. This standards documentation can be found at: http://www.fgdc.gov/standards/projects/FGDC-standards-projects/accuracy/part3/chapter3

1.4. Quality Control: The contractor shall utilize a topology build and clean routine and assure the CFLD has the following:

· No erroneous overshoots, undershoots, dangles or intersections in the line work.

Features shall be snapped where applicable, for example, Comm_Dbsplice snapped to Comm_Path_Segment.

· Lines should all be continuous. Pseudo-nodes should only exist where the attributes of a line change.

· No sliver polygons.

· All polygons completely close and have a single unique centroid.

· Digital representation of the common boundaries for all graphic features must be coincident, regardless of feature layer.

1.5. Spatial coordinates for the location of maintenance holes and cable vaults shall be recorded for the center of the maintenance hole lid. Spatial coordinates for the location of handholes, pedestals, and buried splices shall be recorded for the top center of the feature. Spatial coordinate data for the location of cable installation pathways shall be recorded at a minimum every 50 feet and each offset, turn, or bend in a cable installation pathway must also be recorded so that the coordinates for any point along the turn pathway will fall within the allowable accuracy.

1.6. The Contractor shall be responsible for providing all required GPS, land surveying equipment, data loggers and other equipment including computer software, hardware, and any other tools, labor, and materials necessary to provide the CFLD electronically on CD-ROM storage media.

2.0 Requirements for CFLD Deliverables

2.1. The CFLD attribute and location information shall be stored and submitted in an Environmental Systems Research Institute (ESRI) Shape File format. The shape files must be compatible with the current software used by the 633CES/CEG Langley AFB, Virginia. Its format shall be within a folder named the same as the prefix of the shape file.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .