Attch 18-Additional Question.pdf

PDF 102 KB Posted

Attached to
Protective Coating Services - Ellsworth AFB Federal contract opportunity
Solicitation number
FA4690-20-R-0002
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Protective Coating Services - Ellsworth AFB, newest first.
File Type Posted
Attch 2-KTR-Bid Schedule, Rev3.xls XLS spreadsheet
Solicitation Amendment 0003.pdf PDF
Attch 2-KTR Bid Schedule-Rev2.xls XLS spreadsheet
Attch 1-Paint IDIQ Ellsworth SOW-Rev 2.pdf PDF
Solicitation Amendment 0002.pdf PDF
Attch 16-Questions and Answers.pdf PDF
Attch 2- KTR Bid Schedule-Rev1.xls XLS spreadsheet
Attch 1 Paint IDIQ Ellsworth SOW-Rev1.pdf PDF
Solicitation Amendment 0001.pdf PDF
Attch 17-Amend 1-Pre-proposal meeting.pdf PDF
Attch 11-Past Performance Questionnaire-PPQ.docx DOCX document
Solicitation - FA469020R0002.pdf PDF
Attch 5-WD SD 20190029 Building-Pennington-30 Aug 19.pdf PDF
Attch 3-WD SD 20190003 Residential-Meade-30 Aug 19.pdf PDF
Attch 4-WD SD 20190027 Building-Meade-30 Aug 19.pdf PDF
Attch 8-Paint History.pdf PDF
Attch 1-Paint IDIQ Ellsworth SOW 12 Dec 19.pdf PDF
Attch 13-Consent Form.docx DOCX document
Attch 2-KTR-Bid Schedule 2020-9 Jan 20.xls XLS spreadsheet
Attch 6-WD SD 20190001 Heavy Highway Statewide-4 Jan 19.pdf PDF
Attch 10-FACTS Sheet.docx DOCX document
Attch 12-PPQ Transmittal Letter.docx DOCX document
Attch 9-Client Authorization Letter.docx DOCX document
Attch 7-WD SD 20190002 Residential-Pennington-4 Jan 19.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer

• Reference CLIN 0001BW Removal of lead based paint and coatings by a certified remediation contractor….is this to perform a basic “wet scrape” with ground containment of areas where paint is peeling for the purpose of preparing the surface for painting, or could this be used for a complete lead removal/abatement? For example, a hanger ceiling with lead painted beams where the paint is not peeling, but 100% removal is required. If the latter is the intention of this CLIN, then we feel the government should incorporate additional Clins and revise the SOW to identify the method(s) required i.e. chemical, power tool, abrasive blast, etc. and the degree of containment with consideration of negative air requirements.

Answer: This refers to the removal of LBP by manual chipping or scraping, either wet or dry. It does not include sanding or abrasive blasting methods that would cause paint dust or airborne particulates during the paint removal process. The intent is for only LBP that is flaking or bubbled up to be removed prior to receiving a coating to encapsulate the remaining paint that is still adhering. This is not a line item for abatement or complete removal. As with all wastes, this will also need to be disposed of in a proper container to the correct facility in accordance to regulations.