Solicitation Amendment 0001.pdf

PDF 559 KB Posted

Attached to
Protective Coating Services - Ellsworth AFB Federal contract opportunity
Solicitation number
FA4690-20-R-0002
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Protective Coating Services - Ellsworth AFB, newest first.
File Type Posted
Attch 2-KTR-Bid Schedule, Rev3.xls XLS spreadsheet
Solicitation Amendment 0003.pdf PDF
Attch 2-KTR Bid Schedule-Rev2.xls XLS spreadsheet
Attch 1-Paint IDIQ Ellsworth SOW-Rev 2.pdf PDF
Solicitation Amendment 0002.pdf PDF
Attch 18-Additional Question.pdf PDF
Attch 16-Questions and Answers.pdf PDF
Attch 17-Amend 1-Pre-proposal meeting.pdf PDF
Attch 2- KTR Bid Schedule-Rev1.xls XLS spreadsheet
Attch 1 Paint IDIQ Ellsworth SOW-Rev1.pdf PDF
Attch 11-Past Performance Questionnaire-PPQ.docx DOCX document
Solicitation - FA469020R0002.pdf PDF
Attch 5-WD SD 20190029 Building-Pennington-30 Aug 19.pdf PDF
Attch 3-WD SD 20190003 Residential-Meade-30 Aug 19.pdf PDF
Attch 4-WD SD 20190027 Building-Meade-30 Aug 19.pdf PDF
Attch 8-Paint History.pdf PDF
Attch 10-FACTS Sheet.docx DOCX document
Attch 12-PPQ Transmittal Letter.docx DOCX document
Attch 9-Client Authorization Letter.docx DOCX document
Attch 7-WD SD 20190002 Residential-Pennington-4 Jan 19.pdf PDF
Attch 1-Paint IDIQ Ellsworth SOW 12 Dec 19.pdf PDF
Attch 13-Consent Form.docx DOCX document
Attch 2-KTR-Bid Schedule 2020-9 Jan 20.xls XLS spreadsheet
Attch 6-WD SD 20190001 Heavy Highway Statewide-4 Jan 19.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The Purpose of This Amendment Is: to make the following changes:

1. Remove Attch 1, Statement of Work and replace with attached SOW, Rev 1, dated 27 Jan 2020.

Changes are highlighted in yellow.

2. Remove Attach 2, Bid Schedule and replace with attached Bid Schedule, Rev 1, dated 27 Jan 2020. Changes are highlighted in yellow.

3. Remove Section L pages 28-39 and replace with the attached section L below located on pages 2-11 of this amendment. Changes are highlighted in yellow.

4. Add Attach 16, Questions and Answers, dated 27 Jan 2020.

5. Add Attach 17, Pre-Proposal meeting minutes, dated 27 Jan 2020.

6. Attachments 14 and 15 will not be used for this solicitation.

Section J - List of Attachments

The following attachments were added:

SOW Rev1

Bid Schedule Rev1

Amend 1-Pre-proposal meeting

Questions and Answers

The following attachments were deleted:

Paint IDIQ Ellsworth SOW 12 Dec 19

KTR-Bid Schedule 2020-12 Dec 19

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

L-1. INSTRUCTIONS TO OFFERORS

I. Proposal Format

A. General: The following instructions cover the preparation and submittal of the offeror's proposal for this solicitation. Offerors must follow the instructions contained herein. Offerors are cautioned that any noncompliance with the terms and conditions of the RFP may cause their proposal to be determined to be not eligible for award. If a joint venture arrangement exists for this acquisition, the offeror shall provide a copy of the joint venture agreement that is signed and dated by all joint venture members as part of the proposal submission. Offerors shall submit only one proposal for the Ellsworth AFB Protective Coatings contract as the Government will review only one proposal per offeror. Proposals must be received by 28 CONS/PKB, 1000 Ellsworth St, Suite 1200, Ellsworth AFB, SD 57706, Attn: Keith Garner, no later than the date and time specified in Block 13 on the face page of the RFP. However, offerors are requested to submit Volume IV, Past Performance Information, so that it is received ten (10) calendar days prior to the required due date for proposals. Failure to submit Volume IV by the earlier date will not result in offeror disqualification.

B. Communications: Exchanges of source selection information after submission of the initial proposal packages between the Government and offerors will be controlled by the Contracting

FA469020R00020001

1095539439C Highlight

1095539439C Highlight

Officer. Email may be used to transmit such information only if the email can be sent encrypted, and must include "Source Selection Information - See FAR 2.101 and 3.104" in the subject line of the email. Otherwise, source selection information will be transmitted via direct mailing or facsimile.

In order to facilitate the sending and receiving of encrypted emails, offerors must use MS Outlook email configured to support encryption or a different email product that is S/MIME compatible and configured to support encryption. If you intend to submit your source selection information via encrypted email, you will need to contact the Buyer/Contracting Officer indicated on the face page of the solicitation prior to that first submittal in order to exchange certificates used for encryption. To ensure the process is working correctly, send a test encrypted message first (without including any source selection information). Otherwise, source selection information will be transmitted via direct mailing or DoD Secure Access File Exchange (SAFE) at https://safe.apps.mil/. When submitting source selection information via email, file suppression utilities, to include but not limited to zip files, will not be accepted.

II. Volume Organization

A. General: Proposals shall be submitted to the Government in four separate volumes as set forth below:

Volume Page Limit Number of Copies Description

I N/A 1 Completed RFP

II 5 1 Technical Factor - Performance and Payment Bond Capacity

III N/A 1* Price Proposal/Bid Schedule

IV N/A 1 Past Performance

*Bid Schedule shall be submitted in both hard copy and electronic form in either CD-R or DVD-R (write once/read only) (1 copy) that is "closed" so that no further writes can be made to the media.

CD-R/W or DVD-R/W media types are not acceptable. Media must be virus scanned by the offeror prior to submitting to the Government.

In addition to the page limitations set forth above, proposal volumes shall comply with the following format:

1. The sealed package used to submit the proposal package must show the time and date specified for receipt. Each volume shall be marked with the RFP number and the offeror's name and address, and the number of the Volume, i.e. I, II, III, etc. Proposals shall be in the English language and all monies shall be proposed in United States dollars.

2. Print shall be no smaller than a font size of 12. Paper size shall be 8 1/2" X 11", excluding any drawings, diagrams, and/or supporting illustrations, spreadsheets, etc. Charts, graphs, drawings, diagrams, supporting illustrations, or spreadsheets shall not be greater than 11" x 17". Each volume within the proposal notebook shall be separately tabbed and identified. Margins shall be no smaller than 1 inch and each page within a volume shall be numbered consecutively. Elaborate formats, bindings, or color presentations are not desired or required.

3. The page limitation for Volume II, Technical Factor-Performance and Payment Bond Capacity, is 5 pages.

4. Page limitations may be placed on responses to Evaluation Notices (ENs), if issued. The specified page limits for EN responses will be identified in the letters forwarding the ENs to offerors or on the EN form itself.

5. Each page containing proprietary information should be so marked.

6. Each page should contain the following legend at the bottom of each sheet:

SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

7. Submission of the initial proposal packages via electronic mail will NOT be accepted. Initial proposal packages may be mailed or hand-delivered. Offerors are cautioned that Ellsworth AFB has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. Some delay should be anticipated when hand-delivering proposal packages.

Offerors should allow for sufficient time to obtain a visitor pass and arrive at the specified office PRIOR to the time specified for receipt of proposals.

FA469020R00020001

B. Volume I, Completed RFP

Volume I, Completed RFP shall consist of:

-The completed and signed SF1442 (blocks 14-20c);

-Acknowledgement of all amendments issued; (Sign Block 20b. of SF1442 or by signing and returning 1 copy of the SF30 for each amendment)

-Proposed prices in the Schedule, Section B;

-Completed provisions from Section K with required "fill in" information; and

-A cover letter delineating any exceptions taken to the RFP terms and conditions with accompanying rationale.

However, offerors are cautioned that any noncompliance with the terms and conditions of the RFP may cause their proposal to be determined unacceptable and therefore not considered eligible for award.

C. Volume II, Technical Factor -Performance and Payment Bond Capacity

The technical factor is performance and payment bond capacity. The contractor shall provide proof from a surety whose names appear on the list contained in Treasury Department Circular 570, that the offeror has a single contract performance and payment bonding capacity at least $175,000 and an aggregate performance and payment bonding capacity of at least $350,000.

FAR 52.228-15 (d)-Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of the Treasury, Financial Management, Service Surety Bond Branch, 3700 East West Highway, Room 6 F01, Hyattsville, MD 20782.

Or via the internet at http://www.fms.treas.gov/c570

D. Volume III, Bid Schedule

The offeror shall submit the completed Bid Schedule, Attachment 2, in electronic version. The offeror is cautioned to submit the most current version if the document is revised during the solicitation process. The offeror shall ensure formulas where used, are correct and not changed from those provided by the Government. Offerors are required to propose unit prices for each contract line item number (CLIN) included in the Bid Schedule, Attachment 2. Failure to propose on all CLINs will result in an incomplete proposal and is not eligible for award. Offerors are to base their proposed amount on the estimated quantities provided. The estimated quantities are based on actual quantities used in FY 2016-2019 that are then projected into known future needs. Offerors shall enter a unit price for each CLIN which will be multiplied by the estimated quantity to produce a total price for each CLIN.

The sum of each CLIN total price will be added to determine the Total Evaluated Price (TEP) for each offeror. Offerors are cautioned against submitting an unbalanced offer. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or understated as indicated by the application of cost or price analysis techniques. Unbalanced pricing increases performance risk and could result in payment of unreasonably high prices. Any offer determined to be unbalanced may be rejected if the award of a contract will result in paying unreasonably high prices for contract performance.

E. Volume IV, Past Performance

1. General: The offeror shall submit Present and Past Performance Information for itself and any joint venture member, as well as each proposed critical subcontractor in accordance with the following paragraphs. A critical subcontractor is defined as an entity (subcontractor and/or teaming contractor), other than the offeror itself that will perform airfield painting and/or pavement painting.

Each offeror may submit up to six (6) unique contracts they have completed. Any submissions by teaming members/joint venture members/critical subcontractor counts against the offeror's limit of

6 (six) submissions. In order to earn the highest possible confidence assessment rating, they must include 2 unique instances for each of the 3 painting disciplines structures, pavements, and airfield.

The evaluation of the offeror's/joint venture member's present/past performance SHALL NOT include the present/past performance of any predecessor companies, affiliates, other divisions or corporate management, even though they may perform major or critical aspects of this requirement.

2. Past Performance Format: The requested present and past performance information shall be provided in a separate folder titled "Volume IV - Past Performance". A summary page shall be provided for this acquisition, describing the proposed role(s) of the offeror, any joint venture member and critical subcontractor (nature of work and percentage of overall work). Summary page information must clearly communicate that proposed critical subcontractor(s) meet the definition of a critical subcontractor established above. Efforts submitted for proposed critical subcontractors not meeting the established definition will not be evaluated. Each offeror/joint venture member/ critical subcontractor shall complete a separate FACTS Sheet for active or completed contracts in the past three (3) years from the issuance date of the RFP, that the offeror/joint venture member considers relevant in demonstrating its ability to perform the proposed effort. If the total number of such contracts exceeds six (6), each offeror/joint venture member shall address its six (6) most relevant contracts. The FACTS Sheet shall clearly indicate the division or corporate organization that performed or is presently performing the contract. Contracts listed may include those with the Federal Government, state and local governments or their agencies, and commercial customers.

3. Ordering Type Contracts Submission: If the contract you are submitting is an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery "D" type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. Given this, an individual order (or series of orders) under the basic ordering contract shall be submitted, in lieu of just the basic contract itself. All information provided to the Government, for an ordering type contractual vehicle, shall be at the order level (i.e. a delivery/task order). Basic Contract level information will not be evaluated because it does not include performance.

When determining what order to submit for evaluation, please reference Section M, Paragraph III.B.

for details on how the Government will evaluate each submitted effort for recency, relevancy, and quality. It is important to submit orders that cover painting structures, pavements (roads and parking lots), and airfield (parking ramp, taxiway and runways) in order to get the highest possible past performance rating.

When submitting an individual order under an ordering type contractual vehicle, it is important that the offeror's past performance information be accurate, complete, and in the correct format. If the information is not submitted in the correct format, the Government will not be able to evaluate the effort for recency, relevancy, and quality. There are specific places for submission of this information in the FACTS Sheet RFP Attachment 10. Please ensure the information submitted, in the FACTS Sheet RFP Attachment 10, is for each order, in lieu of just the basic ordering contract itself. This includes but is not limited to information such as the dollar value, period of performance, quantity and type of painting (structures, pavements or airfield) performed for each order.

4. Subcontractor/Teaming Member Consent Form: In addition to the information provided in the FACTS Sheet (RFP Attachment 10) for each entity as required above, the offeror must submit a consent letter executed by each of its proposed teaming member(s) and/or critical subcontractors authorizing release of adverse past performance information to the prime offeror to allow the prime offeror an opportunity to respond. A sample Subcontractor/Teaming Partner Consent Form is attached to this RFP (see RFP Attachment 13). The consent form shall be completed by the team member(s) and/or critical subcontractors identified in your proposal. The completed consent forms shall be submitted as part of your Past Performance Volume IV.

5. FACTS Sheet: The offeror/joint venture member or critical subcontractor, if applicable, shall focus its FACTS Sheet responses so that they clearly correlate present and past performance with the requirements of this RFP. The FACTS Sheet responses must clearly describe the relevance of the effort to the work proposed. The answering space on the FACTS Sheet may be expanded so that the filled-in FACTS Sheet for each relevant contract covers no more than both sides of three (3) 8 1/2 x 11 inch pages (i.e., no more than six (6) pages (See paragraph 2, Relevancy Table and Paragraph N of the FACTS Sheet.) Provide the most current information for the Points of Contact (POCs)

FA469020R00020001

1095539439C Highlight identified on the FACTS Sheets. At least two of the following (in descending order of availability) should be identified as current POCs on the FACTS Sheets:

(a) Procuring Contracting Officer/Contract Negotiator or equivalent

(b) Program/Project Manager, or equivalent

(c) Administrative Contracting Officer/Contract Administrator or equivalent

(d) Other (As specified in your FACTS Sheet)

If problems were encountered during the performance of the identified contracts, provide evidence of the ability to isolate the root causes of problems and include in the FACTS Sheet a description of programs or actions taken to resolve those causes. Problems not addressed in the FACTS Sheet, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/circumstances have not changed, DO NOT repeat them here.

6. Past Performance Questionnaire: The Present/Past Performance Questionnaire (see RFP Attachment 11) will be one means used by the Government to obtain present/past performance information. The Government reserves the right to change, alter, and/or supplement the questionnaire without further notice to the offeror(s). The offeror shall send out and track the completion of the Present/Past Performance Questionnaires (See RFP Attachment 11) to each of the offeror's, joint venture member's and/or critical subcontractors' (i.e., each entity's) Points of Contact (POCs) identified in each FACTS Sheet. The responsibility to send out and track the completion of the Present/Past Performance Questionnaires rests solely with the offeror - i.e., it shall not be delegated to any other entity. The Transmittal Letter (see RFP Attachment 12) shall be used by the offeror in sending out the Present/Past Performance Questionnaires. Exert your best effort to ensure that at least two POCs per relevant contract submit a completed Present/Past Performance Questionnaire directly to the Government not later than the date established in the RFP for receipt of proposals. POCs may submit their completed Present/Past Performance Questionnaire either electronically, by fax or by mail. If sending electronically, follow the procedures outlined in paragraph I.B. Communications above, and email to: keith.garner.1@us.af.mil. If mailing, the POCs may return the completed questionnaires via mail directly to:

28 CONS/PKB

ATTN: Keith Garner

1000 Ellsworth St, Suite 1200

Ellsworth AFB, SD 57706

If mailing, the outside envelope must be marked as follows:

NOTE: TO BE OPENED BY ADDRESSEE ONLY

The completed questionnaires should be contained in a second envelope marked with the mailing address and the following legend:

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

POCs may send the completed questionnaires via fax. The fax number is 605-385-1759. Please have your POCs call Keith Garner, 605-385-1721 before faxing their response.

Once the Present/Past Performance Questionnaires are completed by your POCs, the information contained therein shall be considered source selection sensitive and shall not be released to you, the offeror. Therefore, any exchange/contact between the offeror/joint venture member and/or critical subcontractor and its own POCs in regards to comments made on the questionnaire is not permitted.

7. Client Authorization Letter: In the event that commercial contracts are presented as present/past performance sources of information, a client authorization letter shall be issued to those commercial POCs requesting/authorizing them to complete a Present/Past Performance Questionnaire. A sample client authorization letter is attached to this RFP (see RFP Attachment 9). The offeror is required to send the client authorization letter(s) with the Present/Past Performance Questionnaire(s) to each POC on commercial contracts. A separate copy of client authorization letter(s) for each commercial contract shall be included in the offeror's Present/Past Performance submission for the Government's use in case additional questionnaires need to be sent by the Government after the RFP due date.

8. Follow-up Discussions: The Government may conduct follow-up discussions with any of the people identified in the FACTS Sheets or in the offeror's Present/Past Performance Volume.

Pursuant to FAR 15.305(a)(2)(ii), the Government may obtain other information by sending out additional questionnaires and through other sources, other than those listed within the FACTS Sheets.

9. RFP Attachment Legend: RFP Attachments 10-Facts Sheet and 11-Past Performance Questionnaire must include the following legend at the top and bottom of the page:

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

FAR Clauses Incorporated by Reference

52.216-27 Single or Multiple Awards. 1995-10

FAR Clauses Incorporated by Full Text

52.215-1 Instructions to Offerors-Competitive Acquisition. 2017-01

(a) Definitions. As used in this provision-

"Discussions" are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

"In writing," "writing," or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

"Proposal modification" is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

"Proposal revision" is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations. "Time," if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals.

(1) Unless other methods (e.g.,electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs(c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show-

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)

(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed-in whole or in part-for any purpose other than to evaluate this proposal.

If, however, a contract is awarded to this offeror as a result of-or in connection with-the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government's interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether sourceselection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of provision)

52.215-20 Alternate I Requirements for Certified Cost or Pricing Data and Data Other Than Certified

Cost or Pricing Data. 2010-10

(a) Exceptions from certified cost or pricing data.

(1) In lieu of submitting certified cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following paragraphs. The Contracting

Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include-

(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g.,wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;

(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;

(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data. If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) The offeror shall prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.

(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.

(End of Provision)

Alternate I (Oct2010). As prescribed in 15.408 (l) (and see 15.403-5(b)(1)), substitute the following paragraph (b)(1) for paragraph (b)(1) of the basic provision:

(b)(1) The offeror shall submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in the following format: __The Contractor shall submit cost or pricing data and supporting attachments in accordance with Table 15-2 of FAR 15.408

52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. 2014-05

(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)

(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

52.252-1 Solicitation Provisions Incorporated by Reference. 1998-02

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by 52.the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): __www.acquisition.gov.

(End of provision)

DFARS Clauses Incorporated by Full Text

252.215-7008 Only One Offer. 2019-07

(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to-

(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 2306a and FAR 15.403-3); and

(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph

(c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.

(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:

(1) Profit rate or fee (as applicable).

(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404-1).

(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S.

Contracting Officer that the proposed price is fair and reasonable ____[U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification].

(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.

(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.

(End of provision)

IDCode:
Page: 1
Pages: 11
AmendNo: 0001
EffDate: 1/28/2020
ReqNo: A004679
ProjNo: 0
IssCode: FA4690
AdmCode:
IssuedBy: FA4690 28 CONS PKC

1000 ELLSWORTH ST STE 1200

CP 605 385 1746

ELLSWORTH AFB, SD 57706-4947

United States Keith Garner, Telephone: 605-385-1721 Email: keith.garner.1@us.af.mil

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA469020R0002
SolDate: 1/13/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: Off
Require:
Copies:
Descript:

SEE CONTINUATION PAGE

ContNameTitle:
CoNameTitle:
ContDate:
CODate:

File details come from the government source that posted it. Updated .