This is a Questions and Answers document dated 31 July 2026 for Solicitation No. FA468626QS017, a bathroom trailer lease procurement for Beale Air Force Base.

The document clarifies three key contractual points regarding the bathroom trailer lease for nine modular units (9 MUNS). The Period of Performance begins 28 September 2026, with the first billing period commencing on that same date. The trailer must be delivered and fully set up no later than 2 October 2026 in accordance with the Performance Work Statement. The CLIN structure is organized into weekly billing increments, providing the contractor flexibility to bill as frequently as weekly or in multiple-week intervals. Regarding maintenance requirements, the weekly servicing does not include full interior cleaning and sanitation of both stations; rather, it is limited to waste-tank pumping, shower maintenance, and consumable restocking. For electrical infrastructure, Answer 3 directs bidders to reference a prior Questions and Answers document dated 28 July 2026 (Attachment 4) regarding the availability of an energized 120V/20-amp electrical connection within 100 feet of the designated trailer location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS (Q&A) dated 31 July 2026

Bathroom Trailer Lease – 9 MUNS – Beale AFB

SOLICITATION NO. FA468626QS017

Question 1: The base period begins September 28, 2026, the Q&A references a September 29, 2026 delivery deadline, and the PWS requires delivery and setup no later than October 2, 2026.

What is the controlling date by which the trailer must be delivered and fully operational, and when should monthly lease billing begin?

Answer 1: The Period of Performance begins on 28 September 2026. Therefore, the first billing period will begin 28 September 2026. The CLIN structure is broken into weeks allowing the Contractor the flexibility to bill as often as every week or multiple weeks at a time.

In accordance with the PWS, the trailer must be delivered and set-up no later than 2 October 2026.

Question 2: In addition to waste-tank pumping, shower maintenance, and consumable restocking, does weekly servicing require full interior cleaning and sanitation of both stations, including the toilets, sinks, showers, mirrors, floors, and touchpoints?

Answer 2: No, the weekly servicing does not require cleaning and sanitation of both stations.

Question 3: Will an energized 120V/20-amp electrical connection be available within 100 feet of the designated trailer location before delivery and setup?

Answer 3: Please reference “Attachment 4 - Questions and Answers - Bathroom Trailer Lease - 28JUL2026” Question 5.