Attachment 2 - Bathroom Trailer Lease - PWS - FINAL MAY2026.pdf
PDF 2 MB Posted
- Attached to
- Bathroom Trailer Lease
- Solicitation number
- FA468626QS017
About this file
This is a Performance Work Statement (PWS) for trailer bathroom rental services at Beale Air Force Base in California, effective May 2026.
The 9th Maintenance Group (MXG) at Beale AFB requires delivery, installation, lease, and weekly waste tank emptying services for a trail-mounted restroom facility. The contractor must deliver and set up the trailer no later than October 2, 2026, to Building 1319 at 19100 Alert Drive, Beale AFB, CA 95903, coordinating with the government point of contact at least two weeks prior. The trailer specifications include a maximum two-stall configuration with separate stations for each gender, interior locking mechanisms, self-contained waste and potable water tanks, and an electricity-powered water heater requiring 120v/20amp electrical connection with 100 feet of extension cord. Each station must include one toilet, one sink with handwashing capabilities, one mirror, one shower, overhead lighting, and hot and cold water functions. The contractor must perform scheduled weekly waste tank emptying services in compliance with AFOSH guidelines and Department of War regulations, submencing initial service within seven days of delivery and the second service within seven days thereafter. Pre-service notification to the government point of contact is required, along with post-service verification of satisfactory completion. The contractor is responsible for waste pumping and offsite disposal in accordance with all local, city, county, state, and federal regulations, ensuring waste professionals maintain proper licensing and certifications. The contractor must maintain the trailer in operational readiness, provide clean work areas free of hazards, comply with all security requirements including Entry Access Listing submission within five business days of work commencement, and coordinate trailer demobilization with the government no later than 30 days prior to contract expiration. Deliverables include a schedule of weekly cleanings submitted 14 business days prior to initial service and proper waste handling licensing documentation upon Contracting Officer request.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .