This document is a Questions and Answers (Q&A) record dated February 18, 2026, for Solicitation No. FA468626QS008 addressing Multiple Water Wells Inspection and Testing at Beale Air Force Base. The contract covers inspection, testing, and rehabilitation of ten water wells (Wells 1-10) located at 3875 North Beale Road, Yuba County, California, with a performance period of March 23, 2026 through March 22, 2027. Repair work is limited to Well 5 only, which is currently inactive due to electrical issues (ground fault) that prevent further diagnosis. The contractor must submit an inspection and testing plan schedule within 30 days of contract award and will have access to historical maintenance logs, performance data, and repair reports provided by the government.
Well specifications indicate most wells were constructed in 1942 and relined with 14-inch liners in 1999. Wells 1 and 9 are newer (2023 and 2024 replacements, respectively) with completely replaced controls and equipment. Wells 5, 8, and 9 have backup generators; Wells 1 and 9 have automatic valves. Typical pumping capacity ranges from 500 to 2,500+ GPM across wells utilizing American-Marsh vertical turbine pumps, with Well 9 equipped with a 125 HP submersible pump producing 1,250 GPM. Under normal operations, two wells operate simultaneously, averaging 1.2477 MGD during high ambient temperatures. The contractor will interface with existing Siemens controls and must coordinate through AF Form 103 work request procedures. Video inspection is required post-rehabilitation. No cybersecurity component applies to this contract despite FAR Part 12 procedures being utilized.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS (Q&A) dated 18 February 2026 Multiple Water Wells Inspection and Testing
SOLICITATION NO. FA468626QS008
Question 1: What is the anticipated period of performance for this contract, including any potential option years? Responder Date Answer 1: There are no option years for this contract, only an option CLIN for the repair work on well 5. The anticipated Period of
Performance (PoP) is 23 March 2026- 22 March 2027. IAW the PWS, the Contractor shall submit an inspection and testing plan schedule is within 30 days after contract award. Abigail Bartleson 2/18/2026
Question 2: Can you describe the typical performance and efficiency of the wells during periods of high ambient temperature?
Answer 2: Last August wells ran on average 11 hours a day and generated on average 1.2477 MGD. The pump manufacturer states pumps have an efficiency rating of greater than 80% John Kay 2/19/2026
Question 3: Will the contractor be provided with access to historical maintenance logs, performance data, and repair reports for the wells?
Answer 3: Yes. Available information will be provided to the successful bidder. There is a list of documents under “Government Provided” section and of the PWS. In addition, operational records are available. Mitch Monroe 2/19/2026
Question 4: What are the original construction dates for the wells, and can you provide a summary of any significant updates or refurbishments completed since then?
Answer 4: Most wells were constructed in 1942. Many were relined with a 14-inch liner in 1999. Refer to the Well Construction Summary Table. Mitch Monroe 2/19/2026
Question 5: Is there a backup power system (e.g., generators) for the wells? If so, which specific wells are covered by this system?
Answer 5: Wells 5,8, and 9 have backup generators. Those generators can only provide power to the wells they are attached to.
John Kay 2/19/2026
Question 6: What is the rated pumping capacity (e.g., gallons per minute) for each individual well pump?
Answer 6: Other than Well 1 and Well 9, All wells utilize an American-Marsh 480 series vertical turbine pump with a 10” bowl size that is rated for 500-2500+ GPM at 1760-1800 rpms, according to the manufacturer.
John Kay Mitch Monroe 2/19/2026
Question 7: Under normal operating conditions, how many wells are typically running simultaneously?
Answer 7: Two wells typically operate at once. Mitch Monroe 2/19/2026
Question 8: Is the scope of this contract limited to the repair of Well 5, or does it include potential maintenance and repair for all wells covered?
Answer 8: Repairs will be limited to Well 5 only. Mitch Monroe 2/19/2026
Question 9: Are any of the wells equipped with automatic or actuated valving systems?
Answer 9: Wells 1 and 9 have automatic valves which allow them to waste for a set duration at start up. John Kay 2/19/2026
Question 10: Can you please confirm the requirement for the new contractor to interface with the existing Siemens troubleshooting contract?
What is the expected nature of this collaboration, and are there any specific technical or procedural requirements that bidders should be aware of to ensure seamless integration?
Answer 10: Siemens will be available to answer any questions, will accompany contractor on field visits as needed to ensure integration.
Mitch Monroe 2/19/2026
Question 11: What are the parameters on the new well that was drilled in the well field that is to be the baseline for the rest of the wells; the new well being Well #9.
Answer 11: Refer to Well 09-02 as built drawings. Mitch Monroe 2/19/2026
Question 12: Can you provide the horsepower and gallons per minute of the pump as well as the total depth and diameter of Well #9?
Answer 12: Well 09-02 has an 8” 125 HP submersible pump. Testing indicated it can produce 1250 GPM. Total depth of borehole is 366’, sump set at 344’. Mitch Monroe 2/19/2026
Please provide the information below, or indicate that it is not available if that is the case:
Question 13: Work orders, invoices, and/or specifications regarding the recently repaired and replaced Well No. 1 and Well No. 9.
Answer 13: As builts drawings for Well 09-02 are provided herein. Well Completion Report for Well 01-02 is also provided.
Mitch Monroe 2/19/2026
Question 14: Department of Water Resources Well Completion Reports for Wells No. 1 through 10.
Answer 14: Well Completion Reports are provided herein. Mitch Monroe 2/19/2026
Question 15: Please provide the documents listed in the Performance Work Statement Part 3, 1.0, including: well construction logs, 2005 Drinking Water Source Assessment and Protection Plan/Wellhead Protection Plan, 1999 Evaluate and Repair Well Casings Report, 1999 Beale Water Supply Evaluation for Well #1 (Draft), and 1998 Beale Water Supply Evaluation for Well #3 and Well #4 (Draft).
Answer 15: These documents will be made available to copy to the successful bidder. Mitch Monroe 2/19/2026
Question 16: Work orders, invoices, and documents regarding Well No. 5 known reliability issues.
Answer 16: The only thing we have been able to do is determine there is a ground fault. We do not have the ability to pull the pump, so we were unable to make any further determinations and ceased using the well to avoid causing potential catastrophic damage to the pump and motor. John Kay 2/19/2026
Question 17: Products, technical specifications, and quantities of materials and/or equipment to repair Well No. 5.
Answer 17: Not available. Mitch Monroe 2/19/2026
Question 18: Discharge water – please provide route and distance to nearest approved discharge location from Wells No. 2, 4,5,6, and 8.
Answer 18: Refer to attached Beale Wells to Discharge Map Mitch Monroe 2/19/2026
Question 19: Equipment staging and laydown – please provide mapping and location of approved areas for staging and laydown of equipment and machinery necessary to perform the expected well inspection and rehabilitation work at Wells No. 2, 4,5,6, and 8. This should include the storage of broken concrete, removed piping, etc
Answer 19: Equipment staging and laydown areas will be limited to improved surfaces within the existing fenceline of the well site.
If additional space is required, it will be approved on a case by case basis during the AF103 work request submittal process. Mitch Monroe 2/19/2026
Question 20: Sensitive habitat – please provide mapping/location of any sensitive features in the vicinity of Wells No. 2, 4,5,6, and 8 that will require mitigation features, such as crane mats or elevated discharge piping.
Answer 20: Specifc habitat information will be provided to the successful bidder during the AF103 process. Assume that crane mats will be required to cover unimproved areas where heavy equipment will be operating. For the discharge piping, ground placement will be acceptable unless crossing sensitive habitat. Mitch Monroe 2/19/2026
Question 21: Performance Work Statement Part 5, 1.0, C, 4 and 5 – Performance Testing and Downhole Inspection: Clarify the expected capacity testing requirements e.g. step-drawdown and/or constant-rate discharge pumping test with contractor provided test pump. If so, provided expected range of test pump flow rate. Should downhole video inspection and capacity testing occur before AND after well cleaning to verify effectiveness of well rehabilitation?
Answer 21: Video inspection will be required post rehabilitation Mitch Monroe 2/19/2026
Question 22: Clarify the Contract Clause requirements regarding No. 252.204-7012 – Safeguarding Covered Defense Information and Cyber Incident Reporting and the Cybersecurity Maturity Model Certification tiers.
1. What class of CMMC required sensitive information will be handled by the contractor
2. What level CMMC Assessment and Verification will be required?
Answer 22: Clause 252.204-7012 is a required provision when utilizing FAR part 12 procedures. There is no Cybersecurity component of this contract Katherine Moe 2/26/2026
List of referenced material
1 Well Construction Summary Table
2 Well 09-02 As Built Drawings
3 Well Completion Reports
4 Beale Wells to Discharge Map
Well ID Status Original
Construction Date (reconstruction date)
State Well No.
(lat) [long]
Nominal Casing Diameter/Liner
Diameter (inches)
Ground Surface Elevation (ft.
MSL)
Well Head Elevation (ft.
MSL)
Total Well Depth (feet)
Screened Interval
(feet)
Type of Openings (inches)
Screened Interval
Formation
Pumping Rate (gpm)
[date]
Static Water level (feet)
[date]
Pumping Water Level (feet) [date]
Specific Capacity
(gpm/ft) [date] Grouted Casing Depth Notes
Well 01-02 (Well 1)
Active 2023
15N/05E-19 [39.1294537]
(-121.4677683)
WCR2023-
012838
16 84 86 300 180-280 304 SS Wire Wrap (0.06)
Alluviaum Sand/Gravel
[2023]
[2023]
74.5 [2023]
Sanitary seal to 50 ft.
Well and controls completely replaced in 2023
Well 2 Active
(14-in liner 1999)
15N/4E-24R2 [39.13114]
(-121.47251) 16/14 82 324
149-160 234-320
(perf. liner 213-313)
Mils Knife Perforarated
Pipe
Alluvium Sand/Gravel
[1965]
73.7 [1965]
124.7 [1965]
21.8 [1965]
Reconstructed 100 ft.
hole plug and Benseal sanitary Seal
Well 3 Abandoned 86.6 264
Well 4 Active
(14-in. liner 1999)
15N/4E-24H1 [39.13706]
(-121.46919) 16/14 81.3 300
152-281 (perf. liner interval NR)
Mils Knife Perforarated
Pipe
Alluvium Sand/Gravel
[1965]
79.8 [1965]
131.8 [1965]
22.5 [1965]
Reconstructed 100 ft.
hole plug and Benseal sanitary Seal
Well 5 Inactive
(14-in. liner 1999)
15N/4E-24G1 [39.13914]
(-121.47367) 16/14 84.9 299
126-154 210-224 238-287
(perf. liner 100-190)
Mils Knife Perforarated
Pipe
Alluvium Sand/Gravel
NR NR NR NR
Reconstructed 100 ft.
hole plug and Benseal sanitary Seal
Well inactive due to electrical issues downhole
Well 6 Active
(14-in. liner 1999)
15N/4E-24B1 [39.14361]
(-121.47326) 16/14 87.8 313
132-155 192-213 235-241 248-264 292-298
(perf. liner 100-299)
Mils Knife Perforarated
Pipe
Alluvium Sand/Gravel
[1965]
80.1 [1965]
105.1 [1965]
46.3 [1965]
Reconstructed 100 ft.
hole plug and Benseal sanitary Seal
Well 7 Abandoned 86 300
Well 8 Active 1956 15N/5E-19L1
[39.13391] (-121.46388)
(no liner)
87 312 95-107
132-240 288-300
Moss Louvre Alluvium
Sand/Gravel
[1965]
[1965]
[1965] 47.9
[1965] 48 ft.
30-in pipe No sanitary seal
Well 09-02 (Well 9)
Active 2024
15N/04E-24 [39.135337]
(-121.475916)
WCR2025-
004404
16 82 86 345 190-336
304 SS
w/double row (0.060") mill slot
Alluvium Sand/Gravel
60 ft.
36-in. pipe
Well and controls completely replaced in 2024
Well 10 Standby 2006 15N/5E-28 10.75 240 145-225 Louvered Alluvium
Sand/Gravel
[2005] 55.6
[2005]
[2005] 19.5
[2005] 125 ft. 10-in. pipe bentonite seal
STATE OF CALIFORNIA - CALIFORNIA NATURAL RESOURCES AGENCY Gavin Newsom, Governor
DEPARTMENT OF WATER RESOURCES
NORTH CENTRAL REGION OFFICE
3500 INDUSTRIAL BOULEVARD
WEST SACRAMENTO, CA 95691
Mitch Monroe Beale AFB 6425 B St, Building 25390 Beale AFB, CA 95903
Dear Mitch Monroe:
3875 North Beale Rd, Beale AFB, CA; Yuba County
Sincerely, Madeleine Blanc, E.I.T.
Groundwater Supply Assessment and Special Studies Section
December 7, 2021
If you need additional information or have any questions, please contact Madeleine Blanc at (916) 376-9614 or fax (916) 376-9676.
This is in regards to your request for a well completion report you submitted. DWR has performed a search of our records for the following location and has found no well completion reports.
3875 North Beale Road 1
1160483497C Highlight
STATE OF CALIFORNIA - CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor
NORTH CENTRAL REGION OFFICE
3500 INDUSTRIAL BOULEVARD
WEST SACRAMENTO, CA 95691
Mitch Monroe Beale AFB 6425 B St, Building 25390 Beale AFB, CA 95903
Dear Mitch Monroe:
3875 North Beale Rd, Beale AFB, CA; Yuba County
WCR: #58-280
The well was located using the following: owner history, well construction details.
Sincerely, Madeleine Blanc, E.I.T.
Groundwater Supply Assessment and Special Studies Section
Enclosures
December 7, 2021
In response to your request, enclosed is a copy of the Well Completion Report which most closely matches the description for the well for the following location:
If you need additional information or have any questions, please contact Madeleine Blanc at (916) 376-9614 or fax (916) 376-9676.
3875 North Beale Road 2
STATE OF CALIFORNIA - CALIFORNIA NATURAL RESOURCES AGENCY Gavin Newsom, Governor
NORTH CENTRAL REGION OFFICE
3500 INDUSTRIAL BOULEVARD
WEST SACRAMENTO, CA 95691
Mitch Monroe Beale AFB 6425 B St, Building 25390 Beale AFB, CA 95903
Dear Mitch Monroe:
3875 North Beale Rd, Beale AFB, CA; Yuba County
Sincerely, Madeleine Blanc, E.I.T.
Groundwater Supply Assessment and Special Studies Section
December 7, 2021
If you need additional information or have any questions, please contact Madeleine Blanc at (916) 376-9614 or fax (916) 376-9676.
This is in regards to your request for a well completion report you submitted. DWR has performed a search of our records for the following location and has found no well completion reports.
3875 N beale Rd 4
NORTH CENTRAL REGION OFFICE
3500 INDUSTRIAL BOULEVARD
WEST SACRAMENTO, CA 95691
Mitch Monroe Beale AFB 6425 B St, Building 25390 Beale AFB, CA 95903
Dear Mitch Monroe:
3875 North Beale Rd, Beale AFB, CA; Yuba County
WCR: #58-279
The well was located using the following: owner history, well construction details.
Sincerely, Madeleine Blanc, E.I.T.
Groundwater Supply Assessment and Special Studies Section
Enclosures
December 7, 2021
In response to your request, enclosed is a copy of the Well Completion Report which most closely matches the description for the well for the following location:
If you need additional information or have any questions, please contact Madeleine Blanc at (916) 376-9614 or fax (916) 376-9676.
3875 North Beale Rd 5
NORTH CENTRAL REGION OFFICE
3500 INDUSTRIAL BOULEVARD
WEST SACRAMENTO, CA 95691
Mitch Monroe Beale AFB 6425 B St, Building 25390 Beale AFB, CA 95903
Dear Mitch Monroe:
3875 North Beale Rd, Beale AFB, CA; Yuba County
WCR: #58-277
The well was located using the following: owner history, well construction details.
Sincerely, Madeleine Blanc, E.I.T.
Groundwater Supply Assessment and Special Studies Section
Enclosures
December 7, 2021
In response to your request, enclosed is a copy of the Well Completion Report which most closely matches the description for the well for the following location:
If you need additional information or have any questions, please contact Madeleine Blanc at (916) 376-9614 or fax (916) 376-9676.
3875 North Beale Rd 6
NORTH CENTRAL REGION OFFICE
3500 INDUSTRIAL BOULEVARD
WEST SACRAMENTO, CA 95691
Mitch Monroe Beale AFB 6425 B St, Building 25390 Beale AFB, CA 95903
Dear Mitch Monroe:
3875 North Beale Rd, Beale AFB, CA; Yuba County
WCR: #134777
The well was located using the following: owner history, well construction details.
Sincerely, Madeleine Blanc, E.I.T.
Groundwater Supply Assessment and Special Studies Section
Enclosures
December 7, 2021
In response to your request, enclosed is a copy of the Well Completion Report which most closely matches the description for the well for the following location:
If you need additional information or have any questions, please contact Madeleine Blanc at (916) 376-9614 or fax (916) 376-9676.
3875 North Beale Rd 8
NORTH CENTRAL REGION OFFICE
3500 INDUSTRIAL BOULEVARD
WEST SACRAMENTO, CA 95691
Mitch Monroe Beale AFB 6425 B St, Building 25390 Beale AFB, CA 95903
Dear Mitch Monroe:
3875 North Beale Rd, Beale AFB, CA; Yuba County
WCR: #38723
The well was located using the following: owner history, well construction details.
Sincerely, Madeleine Blanc, E.I.T.
Groundwater Supply Assessment and Special Studies Section
Enclosures
December 7, 2021
In response to your request, enclosed is a copy of the Well Completion Report which most closely matches the description for the well for the following location:
If you need additional information or have any questions, please contact Madeleine Blanc at (916) 376-9614 or fax (916) 376-9676.
3875 North Beale Road 9
Beale Wells to Discharge Map
| Binder2.pdf |
| Questions and Answers.pdf |
| Well Completion Reports.pdf |
| 3875 North Beale Rd 1 (002).pdf |
| UnableToLocate |
| 3875 North Beale Rd 2 (002).pdf |
| 2021_127_Monroe_841 |
| SingleWell_Template |
15N04E24_58-280
| 3875 North Beale Rd 4 (002).pdf |
| UnableToLocate |
| 3875 North Beale Rd 5 (002).pdf |
| 2021_127_Monroe_842 |
| SingleWell_Template |
15N04E24_58-279
| 3875 North Beale Rd 6 (002).pdf |
| 2021_127_Monroe_843 |
| SingleWell_Template |
15N04E24_58-277
| 3875 North Beale Rd 8 (002).pdf |
| 2021_127_Monroe_852 |
| SingleWell_Template |
15N04E24_134777
| 3875 North Beale Rd 9 (002).pdf |
| 2021_127_Monroe_840 |
| SingleWell_Template |
15N04E24_38723A
| Beale Well Construction Summary Table.pdf |
| Beale Wells to Discharge Map.pdf |
20250520_Well-09-02_Redacted (003).pdf
File details come from the government source that posted it. Updated .