This document is a set of Pre-Bid Requests for Information (RFIs) related to the Solicitation FA468624R0032 for a Cathodic Protection System project at Beale AFB in California.
The key details are:
- The project involves the repair and installation of cathodic protection for 7 water wells at Beale AFB.
- The RFIs cover questions about the location of the cathodic well sites, fencing requirements, anode bed placement, and design requirements.
- The responses provide clarification on the approved work areas, protective measures, and design specifications outlined in the solicitation.
- The solicitation has a NAICS code of 238190 - Cathodic Protection Installation, with an estimated value of $300K - $500K.
- Key dates include a site visit on 8/13/2024, RFI due date of 8/15/2024, and proposal due date of 8/21/2024.
- The contracting agency is the Department of the Air Force, Air Combat Command.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Pre-Bid RFIs | ||||
| Project: Repair Well Fields Cathoic Protection , Beale AFB, CA | Project No: 1135097 | Date: 8/19/2024 | ||
| RFI # | Date Submitted | Response Date | RFI Details | RFI Response |
| 1 | 8/15/24 | 8/19/24 | Can the line be just off the shoulder of the improved road | As stated, in the approved af-813, that all work remains on or surrounded by paved, gravel, or hadened surface only. Therefor; work is not allowed outside of the gravel roads or the hardend area (specified in maps) around the wells. |
| 2 | 8/15/24 | 8/19/24 | Can the cathodic well site be off, away from the improved road approximately 15ft from the road? | See repsonse #1. |
| 3 | 8/15/24 | 8/19/24 | Can the cathodic well site be fenced (8X8ft) off-road to keep live stock from destroying it? | Through the design, the location of the ande bed and the type of the well head including protective measures of the structures will be identified. |
| 4 | 8/15/24 | 8/19/24 | What level of design is comparable to SF1442, Section M, Volume II Subfactor two, designated as a “schematic” ? | Not found in Soliciation, section M, CONS to ask contractor for clarification |
| 5 | 8/15/24 | 8/19/24 | Page 2 of the 813 states the anode bed will be installed a minimum of 300 ft away. Can the anode be installed within the water well fence area? | Design engineer (based on the standard requirement including UFGS specs) given and site condition will provide the required distance between the anode bed and any metal structures inclduding well casing. |
Note: Two proposed actions are offered in the af-813, Page-2, Proposed actions.
Part-1, explains general scope of work of a Single source CP system (combining all wells to one anode bed) for environmental assessment, with aproximate distances needed, which does not governs the technical expectation such as exact distance between the structures. the distanc betwen the single anode bed and well casings can be provided based on the technical specification and standard requirements by designer. af-813 limits digging outside the improved roads and specified (in map) locations around the wells.
Part 2. explains seperate CP system for each well.
| 6 |
| 7 |
Sheet2 project sign is recommended, not required,will be funded at once, estimation reviewe.
Access from the schnider gate for the contractor.
signages and arm gate will be needed to the base side, location, Emergency access through wheatland gate?, Contractor will need to be on EAL, if for long time, will need the base pass. (3 months or more?), Moving the building to the south Comms lines issue, at&tx
Electrical line- (will follow today),