Attachment 5 - AF 3052 Cost Estimate Breakdown.xlsx

XLSX spreadsheet 233 KB Posted

Attached to
Cathodic Protection Beale AFB
Solicitation number
FA468624R0032
Issued by

About this file

The provided document is an Excel file titled "Attachment 5 - AF 3052 Cost Estimate Breakdown.xlsx" related to the federal contract opportunity "Cathodic Protection Beale AFB" with Solicitation Number FA468624R0032.

The federal contract opportunity is for the installation of a Cathodic Protection System for 7 water wells at Beale Air Force Base, as detailed in the provided Statement of Need dated 27 Jun 2024. The contract has an estimated value between $300,000 and $500,000, and the NAICS code is 238190 Cathodic Protection Installation. The site visit is scheduled for 13 August 2024, and the RFI is due on 15 August 2024, with proposals due on 21 August 2024. The contracting agency is the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Solicitation Amendment - FA468624R00320002.pdf PDF
Solicitation Amendment FA468624R00320002 SF 30.pdf PDF
Pre-bid RFIs .xlsx XLSX spreadsheet
Solicitation Amendment FA468624R00320001 SF 30.pdf PDF
Attachment 10 - Sec M - 30 Jul 24.docx DOCX document
Solicitation Amendment - FA468624R00320001.pdf PDF
Attachment 9 - Sec L - 30 Jul 2024.docx DOCX document
Attachment 8 - Hold Harmless Agreement - Cathodic Protection Wells.docx DOCX document
Attachment 13 - Well CP as-built.pdf PDF
Attachment 1 - SON_27 Jun 24.pdf PDF
Attachment 10 - Sec M - 30 Jul 24.docx DOCX document
Attachment 9 - Sec L - 30 Jul 2024.docx DOCX document
Attachment 4 - Cathodic Protection AF Form 813 - 23 May 24.pdf PDF
Attachment 12 - Site Map- Utilities.pdf PDF
Attachment 2 - AF 66 - 29 JAN 24.xlsx XLSX spreadsheet
Solicitation - FA468624R0032 - signed.pdf PDF
Attachment 14 - Well Data -Table.JPG JPG image
Attachment 6 - AF 3052 Supplemental guidance.docx DOCX document
Attachment 11 - CONTRACTOR EAL 2024.xlsx XLSX spreadsheet
Attachment 8 - Hold Harmless Agreement - Cathodic Protection Wells.docx DOCX document
Attachment 3 - Site plan-CP direction - 29 Jan 24.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire - Cathodic Protection Wells.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3052

CONSTRUCTION COST ESTIMATE BREAKDOWN DATE

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
N/A
MATERIAL COSTLABOR COSTS
LINE NO.ITEM (1)UNIT OF MEASURE (2)QUANTITY (3)UNIT (4)TOTAL (5)MANHOURS MANDAYS (6)AVERAGE RATE (7)TOTAL (8)OTHER DIRECT COSTS (9)LINE TOTAL (10)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

&"Arial,Bold"&7 SOLICITATION: FA468624R0032

ATTACHMENT #5

Page &P of &N

AF 3052

AF3052R

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples -- square yards -- SY, cubic yards -- CY, square
feet -- SF, linear feet -- LF, board feet -- BF, each -- EA, pound -- LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur--
nished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6. 7, and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per mahour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Col 1) which are special to the contract
and of significant dollar value. Identify Subcontractor costs here and include back-up documentation on how these costs were derived.

Col 10 Line Total. Self-explanatory.

NOTE:In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows:

1 TOTAL MATERIAL COSTS: $ _________________________ (Column 5 Total)

2 TOTAL LABOR COSTS: $ _________________________ (Column 8 Total)

3 TOTAL OTHER DIRECT COSTS: $ _________________________ (Column 9 Total)

4 TOTAL DIRECT COSTS: $ _________________________ (Column 10 Total, = Items 1 + 2 + 3)

5 OVERHEAD @ ____________% $ _________________________ (Item 4 x Item 5 %)

6 PROFIT @ ____________% $ _________________________ (Item 4 x Item 6 %)

7 SUBTOTAL: $ _________________________ (Item 4 + 5 + 6)

8 BOND @ ____________% $ _________________________ (Item 7 x Item 8 %)

9 TOTAL PRICE: $ _________________________ (Item 7 + 8))

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in FAR 15.804-2, be required to submit a certificate of current cost or pricing data
(see FAR 15.804).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in their proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. Submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such negotiations prior to contract award.

(Reverse of AF Form 3052, Jan 88) *U.S. GOVERNMENT PRINTING OFFICE: 1988-240-979:51349