SOW Attachment 6 - Construction Cost Estimate Breakdown is included for informational purposes only. This form may be used in performance of the contract resulting from this solicitation. This breakdown is also included as Attachment 4 and may be used for seed project cost proposal breakout in lieu of other cost estimating software breakouts.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER) - Beale AFB, CA, newest first.
File Type Posted
FA4686-13-R-0001-004.pdf PDF
FA4686-13-R-0001-0003.pdf PDF
FA4686-13-R-0001-0002_conformed.pdf PDF
SABER_SEED_SON_-_complete_-_15_Feb_2013.pdf PDF
FA4686-13-R-0001-0001_conformed.pdf PDF
Questions_and_Answers_-_SABER_Solicitation.pdf PDF
Sign_In_Sheet_-_SABER_Pre-Proposal_Conference_and_Seed_Site_Visit_-_signed.pdf PDF
SABER_Pre-Proposal_Slides_-_11_Feb_2013.pdf PDF
MFR_-_Pre_Proposal_Meeting_Minutes_-_11_Feb_2013_-_signed.pdf PDF
RFP_Attachment_2_-_SABER_SEED_SOW_-_22_Nov_2012.pdf PDF
SOW_Attachment_5_-_AF_3065_Contract_Progress_Report.pdf PDF
SOW_Attachment_3_-_SF_1413_Statement_and_Acknowledgment.pdf PDF
SOW_Attachment_9_-_Enty_Access_List_Form.xls XLS spreadsheet
RFP_Attachment_3_-_DBA_General_Decision_Number_CA130009_Mod_2_-_11_Jan_2013.pdf PDF
SOW_Attachment_1_-_Sample_Hold_Harmless_Agreement.pdf PDF
FA4686-13-R-0001_30_Jan_2013.pdf PDF
SOW_Attachment_8_-_Beale_Green_Procurement_Tracking_or_Exemption_Form.pdf PDF
SOW_Attachment_7_-_Solid_Waste_Diversion_and_Disposal_Report.pdf PDF
RFP_Attachment_1_-_Beale_AFB_Design_Compatibility_Guide_-_Aug_2009.pdf PDF
RFP_Attachment_4_-_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
RFP_Attachment_5_-_Past_Performance_Questionnaire_-_20_Nov_2012.pdf PDF
SOW_Attachment_4_-_AF_3000_Material_Approval_Submittal.pdf PDF
SOW_Attachment_2_-_AF_3064_Progress_Schedule.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1
2
3
4
5
6
7
8
9
10
11
12
13

0.00 0.00 0.00 0.00

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD % $

SUBTOTAL $

PROFIT % $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.