Submittal_Register.xls
XLS spreadsheet 64 KB Posted
- Attached to
- Maintain Exterior Paint Bldg. 300 Federal contract opportunity
- Solicitation number
- FA466419BA007
About this file
Attachment 4. Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amended_SOW__Hangar_300_(0002).pdf | ||
| 2._Amendment_FA466419BA0070002_SF_30.pdf | ||
| Attendees_List.xlsx | XLSX spreadsheet | |
| KO_Approved_Site_Visit_Notes_Hgr_300.docx | DOCX document | |
| Attachment_9._RFIs_-_Questions_and_Answers.pdf | ||
| 1._Amendment_FA466419BA0070001_SF_30.pdf | ||
| Attachment_10._Asbestos-LBP_Survey_Hgr_300.pdf | ||
| SOW__Maintain_Exterior_Surfaces_of_Historic_Hanger_300_r4.pdf | ||
| Pass_Information_Sheet.pdf | ||
| Drawings_Maintain_Exterior_Surfaces_Hanger_300_R.pdf | ||
| Attachment_3_Specifications.pdf | ||
| FEP_March_ARB_June_2016_Signed.pdf | ||
| Gen_Decision_Number_-_CA20190025_07-26-2019.pdf | ||
| Contractor_Security_Pamphlet_-_11_October_2017.pdf | ||
| Posted_Solicitation_-_FA466419BA007.pdf | ||
| NEW_Blank_Pass_Sheet_(1)_editable_1_VERS_1.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SUBMITTAL REGISTER | |||||
| TITLE AND LOCATION | CONTRACTOR | CONTRACT NUMBER | |||
| PDPG 15-0123 Maintain Exterior Paint Bldg. 300 March ARB | |||||
| ACTIVITY NO | TRANSMITTAL NO | SPECIFICATION SECTION | DESCRIPTION |
| ITEM SUBMITTED | PARAGRAPH NO | CLASSIFICATION GOVERNMENT OR A/E REVIEWER | CONTRACTOR | |||||||||||||||
| SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | DATE RECEIVED FROM APPROVAL AUTHORITY | REMARKS | ||||||||||||||
| SUBMISSION | ||||||||||||||||||
| DATE | APPROVAL | |||||||||||||||||
| NEEDED BY | MATERIAL | |||||||||||||||||
| NEEDED BY | ACTION CODE | DATE FORWARDED TO APPROVAL AUTHORITY | DATE RECEIVED FROM CONTRACTOR | DATE FORWARDED TO REVIEWER | DATE RECEIVED FROM REVIEWER | ACTION CODE | DATE SENT TO CONTRACTOR | |||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| SOW | SOW Preconstruction Submittals | |||||||||||||||||
| Draft Work Plan | 8.1 | Pre-Construction Meeting | ||||||||||||||||
| Work Plan (WP) | 8.1 | G | 14 | |||||||||||||||
| Environmental Protection Plan | 7.12 | With WP | ||||||||||||||||
| Quality Control Plan | 7.7 | With WP | ||||||||||||||||
| Initial Project Schedule | With WP | |||||||||||||||||
| Accident Prevention Plan | 7.3.4.3 | With WP | ||||||||||||||||
| Standard Lift Plan | 7,3,5 | With WP | ||||||||||||||||
| Fall Protection And Prevention (FP&P) Plan | 7.3.5.2 | With WP | ||||||||||||||||
| Health And Safety Plan | With WP | |||||||||||||||||
| Warranty Management Plan | With WP | |||||||||||||||||
| Certificates Of Insurance | With WP | |||||||||||||||||
| Surety Bonds | With WP | |||||||||||||||||
| List Of Proposed Subcontractors | With WP | |||||||||||||||||
| List Of Proposed Products | With WP | |||||||||||||||||
| Base Access Pass | 7.4 | Pre-Construction Meeting | ||||||||||||||||
| March arb Form 103 Dig/Work Permit | 7.6 | 14 Days Prior To Start Of Work | ||||||||||||||||
| Hot Work Permit | 10 Prior To Hot Work Req't | |||||||||||||||||
| Manufacturer Data And Catalog Cuts | 8.1.2.8 | G | As On Drawings | |||||||||||||||
| Annotated Comments | 8.1.1 | G | 10 Days After Receipt Gov't Comments | |||||||||||||||
| Minutes To Meetings | 7.7 | G | 3 Days After Meetng | |||||||||||||||
| Submittal Schedule | 11.7 | G | With Wp | |||||||||||||||
| Final Cd As-builts | 11.6 | G | Close Project | |||||||||||||||
| AF Form 3000 Material Submittal | 9.10.1 | G | As On Drawings | |||||||||||||||
| Microsoft Project Schedule Progress Report | 11.7 | G | Monthly | |||||||||||||||
| As-Builts | 11.6 | G | 10 Days Prior Completion | |||||||||||||||
| Certification Of EPA Designated | 2.1 | G | ||||||||||||||||
| Demolition Plan | 1.2.2 | G | ||||||||||||||||
| 08 11 13 | SD-02 Shop Drawings | |||||||||||||||||
| Doors | 2.1 | G | ||||||||||||||||
| Doors | 2.1 | G | ||||||||||||||||
| Recycled Content for Steel Door | 2.1 | S | ||||||||||||||||
| Product | ||||||||||||||||||
| Frames | 2.6 | G | ||||||||||||||||
| Frames | 2.6 | G | ||||||||||||||||
| Recycled Content for Steel | 2.6 | S | ||||||||||||||||
| Frame Product | ||||||||||||||||||
| Accessories | 2.4 | |||||||||||||||||
| Weatherstripping | 2.8 | |||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Doors | 2.1 | G | ||||||||||||||||
| Frames | 2.6 | G | ||||||||||||||||
| Accessories | 2.4 | |||||||||||||||||
| Weatherstripping | 2.8 | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Factory-applied enamel finish | 2.10.2 | G | ||||||||||||||||
| 08 71 00 | SD-02 Shop Drawings | |||||||||||||||||
| Manufacturer's Detail Drawings | 1.3 | G | ||||||||||||||||
| Verification of Existing Conditions | 1.3 | G | ||||||||||||||||
| Hardware Schedule | 1.5 | G | ||||||||||||||||
| Keying System | 40577 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Hardware Items | 2.3 | G | ||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Installation | 3.1 | |||||||||||||||||
| Hardware Schedule | 1.5 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Key Bitting | 1.6.1 | |||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Coating | 2.1 | G | ||||||||||||||||
| Sealant | 3.3.5 | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Color | 1.1 | G | ||||||||||||||||
| Textured Wall Coating System | 1.5.2 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Applicator's Qualifications | 1.4 | |||||||||||||||||
| Qualification Testing | 1.5.1.2 | G | ||||||||||||||||
| Indoor Air Quality for Paints and | 2.1 | |||||||||||||||||
| Primers | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Application Instructions | 3.4.1 | |||||||||||||||||
| Mixing | 3.8.2 | |||||||||||||||||
| Manufacturer's Safety Data | 1.8.2 | |||||||||||||||||
| Sheets | ||||||||||||||||||
| 01 57 19 | MARCH ARB ENVIRONMENTAL PROTECTION GUIDE SPECIFICATION | |||||||||||||||||
| Solid Waste Management Report | 1.3.1.14 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Waste Determination Documentation | 1.4.1 | G | ||||||||||||||||
| Disposal Documentation for Hazardous and Rregulated Waste | 1.4.2 | G | ||||||||||||||||
| Assembled Employee Training Records | 1.4.3 | G | ||||||||||||||||
| Solid Waste Management Plan | 1.4.4 | G | ||||||||||||||||
| Contractor Hazardous material Inventory Log | 1.4.5 | G | ||||||||||||||||
| HazardousWaste/Debris Management | 1.4.5 | G | ||||||||||||||||
| Regulatory Notifications | 1.4.5 | G | ||||||||||||||||
| Monthly Hazardous Material (HAZMAT) usage totals | 1.4.5 | G | ||||||||||||||||
| Weight Tickets Debris/Recycled | 1.4.5 | G | ||||||||||||||||
| Recovered Materials Determination Form (RMDF) | Para B | G | ||||||||||||||||
| Percentage of RMDF content for EPA-Designated Products | Para D | G | ||||||||||||||||
| 09 90 00 | SD-02 Shop Drawings | |||||||||||||||||
| Piping Identification | 3.1 | |||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Coating | 2.1 | G | ||||||||||||||||
| Sealant | 3.3.5 | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Color | 1.1 | G | ||||||||||||||||
| Textured Wall Coating System | 1.5.2 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Applicator's Qualifications | 1.4 | |||||||||||||||||
| Qualification Testing | 1.5.1.2 | G | ||||||||||||||||
| Indoor Air Quality for Paints and | 2.1 | |||||||||||||||||
| Primers | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Application Instructions | 3.4.1 | |||||||||||||||||
| Mixing | 3.8.2 | |||||||||||||||||
| Manufacturer's Safety Data | 1.8.2 | |||||||||||||||||
| Sheets | ||||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Coatings | 2.1 | G |
&RAttachment 4 to
FA466419BA007
Page &P of &N Enter the date received from the Contractor. (MM/DD/YY)