Dyess_AFB_Electrical_Study-Volume1 (Final Report)_Redacted.pdf

PDF 48 MB Posted

Attached to
Replace Substation Alpha Relay B11912 Amendment 0002
Solicitation number
FA466126R0010
Issued by

About this file

This is a redacted final report of an electrical study conducted for Dyess Air Force Base. The document provides comprehensive analysis of the electrical infrastructure at the base, with specific focus on Substation Alpha and its associated feeder protection systems. The study examines the existing electrical systems, identifies deficiencies, and supports the technical requirements outlined in the related solicitation for replacing the Substation Alpha Feeder Protection Relays at Building 11912.

The electrical study serves as the technical foundation for the solicitation FA466126R0010, which requires contractors to install two new GE 850 Feeder Protection Relays to replace existing GE 760 relays. The study contains detailed information about the current electrical configuration, system parameters, and performance data necessary for contractors to understand the scope of work, including programming requirements to match existing relay settings, installation standards compliance with NEC/NETA, and testing procedures with full base load. As an attachment to Amendment 0002 of the solicitation, this redacted report provides contractors with essential technical reference material to develop accurate proposals for this Department of the Air Force Global Strike Command requirement, with proposals due September 18, 2026 at 1200 CST.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .