Contractor question 1 to 11.pdf

PDF 73 KB Posted

Attached to
SABER IDIQ Federal contract opportunity
Solicitation number
FA466122R0009
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to SABER IDIQ, newest first.
File Type Posted
5201_Spotelv.pdf PDF
SABER Questions 12-125.pdf PDF
SABER Questions 12-125.pdf PDF
Contractor questions 12-101.pdf PDF
Attachment 6 Section M.pdf PDF
B5201 Site Utility Map.pdf PDF
Contractor questions 1 to 11 revised.pdf PDF
1986 As-builts.pdf PDF
1964 As-builts.pdf PDF
1954 as-builts.pdf PDF
Bldg 5201 Asbestos Survey.pdf PDF
FA466122R0009 Solicitation 2 Sept.pdf PDF
Attachments 5 Section L.pdf PDF
Attachement 4 Wage Determination.pdf PDF
Attachment 6 Section M.pdf PDF
Attachement 10 Relevant Contracts.docx DOCX document
Attachment 8 PPQ.docx DOCX document
Attachment 9 Site Visit Registration Form.docx DOCX document
Attachment 6 Section M.pdf PDF
Attachment 1 - SABER SOW Main IDIQ.pdf PDF
Attachment 7 SoO Reno Building 5201.pdf PDF
Attachment 3 SABER Pricing.xlsx XLSX spreadsheet
FA466122R0009 Solicitation.pdf PDF
Attachments 5 Section L.pdf PDF
Attachment 4 Wage Determination.txt TXT text file
Attachment 2 SABER Solicitiation Sections F-H.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor questions 1-11

FNWZ 21-0004

12 September 2022

1. Q. What is the expected location of fire riser, and is there a location planned for tie-in to water supply?

A. There is no requirement in the SOO to install a fire riser or sprinkler system. SOO 3. C. iii describes a new fire alarm with heat detectors. SOO 3. C. iv describes Mass Notification requirement.

2. Q. To what extent from the building is drainage management required? Other than the front of the facility between building and sidewalk, all appears to be draining properly.

A. The North side of the facility between the building and the parking lot must be regraded and reconfigured for positive drainage away from the building. The south side of the building may also require attention, as previous attempts to prevent water from entering the building caused

3. Q. According to the asbestos survey, the only area tested for asbestos was flooring. A portion of the scope is to repair damages to the walls, and cut control joints. Is it to be assumed ACMs are limited only to flooring in this space only, or shall we treat unknown areas as ACMs for bidding purposes?

A. The Government believes the walls and ceiling asbestos was removed as a part of the 1986 renovation.

4. Q. Are there any fire/smoke walls in the facility?

A. The as-built drawings do not reflect fire /smoke walls.

5. Q. Will as-built plans be provided prior to proposal due date?

A. Please refer to the as-built drawings from 1954, 1962, & 1986, attached.

6. Q. Are any interior doors to be replaced as part of the scope? Pictures show a few with impact damage and others with water/separation damage.

A. SOO 3. C. ix indicates doors to be replaced.

7. Q. To allow clearances for fire suppression systems, will ceiling height be able to be adjusted if needed?

A. Refer to CE response for Question 1.

8. Q. Will attic space need to have fire suppression?

A. Refer to CE Response for Question 1.

9. Q. In reference to the ADA requirements for Restrooms, is the expectation to have multi-user or single-user restrooms?

A. Please reference the Architectural Barriers Act (ABA) for all Accessibility requirements. It is intended to maximize the fixture count in all spaces while meeting current ABA requirements. If the most recent edition of the IBC requires additional fixture than can be accommodated in the existing area, then adjacent storage space may be reconfigured to accommodate ABA requirements.

Contractor questions 1-11

FNWZ 21-0004

12 September 2022

10. Q. If multi-use restrooms are the final expectation, how many water closets are expected?

A. The fixture count should meet current edition of IBC business fixture count requirements.

Contractor may be required to expand the restrooms to meet codes and required fixture counts.

11. Q. It is recommended that existing toilets and flush valves be replaced with new.

A. SOO 3. a. requires the removal of existing fixtures. SOO 3. C. 4. Is in error. Plumbing fixtures and flush valves should be all-new.