B5201 Site Utility Map.pdf
PDF 2 MB Posted
- Attached to
- SABER IDIQ
- Solicitation number
- FA466122R0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5201_Spotelv.pdf | ||
| SABER Questions 12-125.pdf | ||
| SABER Questions 12-125.pdf | ||
| Contractor questions 12-101.pdf | ||
| Attachment 6 Section M.pdf | ||
| Contractor questions 1 to 11 revised.pdf | ||
| 1964 As-builts.pdf | ||
| 1986 As-builts.pdf | ||
| Contractor question 1 to 11.pdf | ||
| 1954 as-builts.pdf | ||
| Bldg 5201 Asbestos Survey.pdf | ||
| FA466122R0009 Solicitation 2 Sept.pdf | ||
| Attachement 4 Wage Determination.pdf | ||
| Attachment 6 Section M.pdf | ||
| Attachments 5 Section L.pdf | ||
| Attachement 10 Relevant Contracts.docx | DOCX document | |
| Attachment 9 Site Visit Registration Form.docx | DOCX document | |
| Attachment 4 Wage Determination.txt | TXT text file | |
| Attachments 5 Section L.pdf | ||
| Attachment 2 SABER Solicitiation Sections F-H.pdf | ||
| Attachment 8 PPQ.docx | DOCX document | |
| Attachment 6 Section M.pdf | ||
| Attachment 1 - SABER SOW Main IDIQ.pdf | ||
| Attachment 3 SABER Pricing.xlsx | XLSX spreadsheet | |
| Attachment 7 SoO Reno Building 5201.pdf | ||
| FA466122R0009 Solicitation.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Supply
Admin.
Corrosion Control
Utility Storage
Corrosion Control
Hangar 28th
Support/Tool Crib
B1 Engine Shop
28th Bomb
Squad5201 28th
Bomb Squad
CAMS
Gate Mount
1ST
MINI
1ST
AVENUE D-3
1ST
AVENUE D-4
dInlet_P dInlet_P dInlet_P dInlet_P
TBD
Recreation
Facility
Parking
Parking
Pa rki ng
Peripheral
Legend PavementMarkings_P PavementMarkings_L
RoadCenterline_L j Sewer Manhole
J Sewer Cleanout
Gas ControlValve
!! ExteriorLight
É Generator
Water Valve
"" Transformer Sewer Service Line Sewer Main Line Sewer Line Gravity Service HVAC Lines
Gas Lines
ABANDONED
ABANDONED MAIN LINE
MAIN LINE
Gas Service Line Overhead Electric Primary Lines Overhead Electric Secondary Lines Underground Electric Primary Lines Underground Electric Secondary Lines Building
AF 103 Work Clearance/Dig Permit ¯0 20 40 60 8010 MetersNotes:
Map Scale:
Air Force Imagery Date: 2016
1:1,000
The Contractor shall be solely responsible for locating and marking the exact location of all existing utilities within the contract work area prior to any excavating, trenching, backfilling or disturbance. The Contractor is SOLELY RESPONSIBLE for any and all damage to existing utilities in the contract work area.
Upon request by the Contractor, the Government shall furnish all available information in its possession concerning utilities in the contract work area.