SOW_SubAttachment_2_-_UFGS_01_78_23_ OPERATION_AND_MAINTENANCE_DATA .docx

DOCX document 23 KB Posted

Attached to
Carpet and Tile Amendment
Solicitation number
FA4661-14-R-0002
Issued by

About this file

SOW SubAttachment 2 UFGS Operation and Maintenance Data

View the file

Other files

File Type Posted
Bid_Schedule_Clarification_MFR.pdf PDF
SOW_SubAttachment_6_-_UFGS_09_30_00_ CERAMIC_TILE _QUARRY_TILE _AND_PAVER_TILE .docx DOCX document
FA4661-14-R-0002-0004.pdf PDF
SOW_SubAttachment_3-2_-_UFGS_02_41_00_Atch_-_TX-AsbestosDemoNotifcationForm.pdf PDF
Bid_Schedule.pdf PDF
SOW_SubAttachment_3-1_-_UFGS_02_41_00_ DEMOLITION_AND_DECONSTRUCTION .docx DOCX document
SOW_SubAttachment_5_-_UFGS_09_06_90_ COLOR_SCHEDULE .docx DOCX document
SOW_SubAttachment_7_-_UFGS_09_65_00_ RESILIENT_FLOORING .docx DOCX document
SOW_SubAttachment_1_-_UFGS_01_33_00_ SUBMITTAL_PROCEDURES .docx DOCX document
SOW_SubAttachment_4_-_UFGS_07_92_00_ JOINT_SEALANTS .docx DOCX document
SOW_SubAttachment_8_-_UFGS_09_68_00_ CARPET .docx DOCX document
FA4661-14-R-0002_-_Q A_Response.pdf PDF
FA4661-14-R-0002-0003_Amendment.pdf PDF
FA4661-14-R-0002_Amendment_0002.pdf PDF
Corrected_Attachment_4_Site_Visit_Reservation_Form.doc DOC document
Corrected_Attachment_5_Question_Form.doc DOC document
FA4661-14-R-0002_Amendment_00001.pdf PDF
Pre_Bid_Site_Visit_Attendance_Roster.pdf PDF
Attachment_3.pdf PDF
14-R-0002_FINAL_Solicitation.doc DOC document
Attachment_2_WD.pdf PDF
13-R-0003_Attachment_4_Reservation_Form.pdf PDF
Attachment_1_Scope_of_Work_FY-14_Carpet-Tile_IDIQ.pdf PDF
13-R-0003_Attachment_5_Question_Form.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UFGS-01 78 23

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 78 23

OPERATION AND MAINTENANCE DATA

November 2013

PART 1 GENERAL

1.1REFERENCES
1.2SUBMISSION OF OPERATION AND MAINTENANCE DATA
1.2.1Package Quality
1.2.2Package Content
1.2.3Changes to Submittals
1.2.4Review and Approval
1.2.5Reserved
1.3TYPES OF INFORMATION REQUIRED IN O&M DATA PACKAGES
1.3.1Operating Instructions
1.3.1.1Safety Precautions
1.3.1.2Reserved
1.3.1.3Reserved
1.3.1.4Reserved
1.3.1.5Reserved
1.3.1.6Reserved
1.3.1.7Reserved
1.3.2Preventive Maintenance
1.3.2.1Reserved
1.3.2.2Reserved
1.3.2.3Cleaning Recommendations
1.3.3Corrective Maintenance (Repair)
1.3.3.1Reserved
1.3.3.2Reserved
1.3.3.3Reserved
1.3.3.4Reserved
1.3.3.5Reserved
1.3.4Reserved
1.3.5Appendices
1.3.5.1Product Submittal Data
1.3.5.2Manufacturer's Instructions
1.3.5.3O&M Submittal Data
1.3.5.4Reserved
1.3.5.5Warranty Information

SECTION 01 78 23

Page of 6

1.3.5.6Reserved
1.3.5.7Reserved
1.3.5.8Reserved
1.3.5.9Reserved
1.4Reserved
1.5SCHEDULE OF OPERATION AND MAINTENANCE DATA PACKAGES
1.5.1Data Package 1
1.5.2Reserved
1.5.3Reserved
1.5.4Reserved
1.5.5Reserved

PART 2 PRODUCTS PART 3 EXECUTION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E1971 (2005; R 2011) Stewardship for the Cleaning of Commercial and Institutional Buildings

1.2 SUBMISSION OF OPERATION AND MAINTENANCE DATA

Submit Operation and Maintenance (O&M) Data specifically applicable to this contract and a complete and concise depiction of the provided product and long-term preventative maintenance and operation. Organize and present information in sufficient detail to clearly explain O&M requirements at the system, equipment, component, and subassembly level. Submit in accordance with this section and Section 01 33 00 SUBMITTAL PROCEDURES.

1.2.1 Package Quality

Documents must be fully legible. Poor quality copies and material with hole punches obliterating the text or drawings will not be accepted.

1.2.2 Package Content

Data package content shall be as shown in the paragraph titled "Schedule of Operation and Maintenance Data Packages." Comply with the data package requirements specified in the individual technical sections, including the content of the packages and addressing each product, component, and system designated for data package submission.

1.2.3 Changes to Submittals

Manufacturer-originated changes or revisions to submitted data must be furnished by the Contractor if a component of an item is so affected subsequent to acceptance of the O&M Data. Submit changes, additions, or revisions required by the Contracting Officer for final acceptance of submitted data within 30 calendar days of the notification of this change requirement.

1.2.4 Review and Approval

The Government must review the material submittals for completeness and applicability.

1.2.5 Reserved.

1.3 TYPES OF INFORMATION REQUIRED IN O&M DATA PACKAGES

1.3.1 Operating Instructions

Include specific instructions, procedures, and illustrations for the following phases of operation for the installed model and features of each system:

1.3.1.1 Safety Precautions

List personnel hazards and equipment or product safety precautions for all operating conditions.

1.3.1.2 Reserved.

1.3.1.3 Reserved.

1.3.1.4 Reserved.

1.3.1.5 Reserved.

1.3.1.6 Reserved.

1.3.1.7 Reserved.

1.3.2 Preventive Maintenance

Include the following information for preventive and scheduled maintenance to minimize corrective maintenance and repair for the installed model and features of each system. Include potential environmental and indoor air quality impacts of recommended maintenance procedures and materials.

1.3.2.1 Reserved.

1.3.2.2 Reserved.

1.3.2.3 Cleaning Recommendations

Provide environmentally preferable cleaning recommendations in accordance with ASTM E1971.

1.3.3 Corrective Maintenance (Repair)

Include manufacturer's recommended procedures and instructions for correcting problems and making repairs.

1.3.3.1 Reserved.

1.3.3.2 Reserved.

1.3.3.3 Reserved.

1.3.3.4 Reserved.

1.3.3.5 Reserved.

1.3.4 Reserved.

1.3.5 Appendices

Provide information required below and information not specified in the preceding paragraphs but pertinent to the maintenance or operation of the product or equipment. Include the following:

1.3.5.1 Product Submittal Data

Provide a copy of all SD-03 Product Data submittals required in the applicable technical sections.

1.3.5.2 Manufacturer's Instructions

Provide a copy of all SD-08 Manufacturer's Instructions submittals required in the applicable technical sections.

1.3.5.3 O&M Submittal Data

Provide a copy of all SD-10 Operation and Maintenance Data submittals required in the applicable technical sections.

1.3.5.4 Reserved.

1.3.5.5 Warranty Information

List and explain the various warranties and clearly identify the servicing and technical precautions prescribed by the manufacturers or contract documents in order to keep warranties in force.

1.3.5.6 Reserved.

1.3.5.7 Reserved.

1.3.5.8 Reserved.

1.3.5.9 Reserved.

1.4Reserved.
1.5SCHEDULE OF OPERATION AND MAINTENANCE DATA PACKAGES

Furnish the O&M data packages specified in individual technical sections. The required information for each O&M data package is as follows:

1.5.1 Data Package 1

a. Safety precautions

b. Cleaning recommendations

c.Maintenance and repair procedures
d.Warranty information
e.Contractor information

f. Spare parts and supply list

1.5.2 Reserved.

1.5.3 Reserved.

1.5.4 Reserved.

1.5.5 Reserved.

PART 2PRODUCTS Not Used
PART 3EXECUTION Not Used