About this file
This is a Questions and Answers document for a CRAC 1.9 replacement solicitation at Grand Forks Air Force Base, supplemented by as-built mechanical and electrical drawings and photographs of existing equipment.
The Government seeks to replace one existing Compu-Aire System 2200L CRAC unit (Model CAG-834 EM, Serial 8521SY1012-5929) with two new 8-ton CRAC units, two dry coolers, and four pumps (two per system in lead-lag configuration). Equipment must be TAA compliant with no manufacturer preference. Each CRAC unit must independently support the full cooling load with automatic failover preferred; manual ductwork reconnection is acceptable during failover events. The current setup uses detachable vents connecting the CRAC to the MCE (Main Control Equipment). Replacement equipment should utilize existing infrastructure at current 480/277V, 3-phase, 60 Hz power; only one unit's power is currently available, and water/condensate drain are available only for the existing single unit. New equipment will be placed on existing pads on the ground at the locations of the existing dry cooler and CRAC unit. The system is 100% redundant with one dry cooler and two redundant pumps per CRAC system; free-cooling operation requires no mechanical refrigeration at or below 35°F. Installation can proceed at the earliest feasible time with no downtime required as portable cooling units are available on-site. Maintenance schedule may follow manufacturer recommendations rather than mandatory monthly visits, with 3 emergency service calls allowed annually (additional calls funded separately). Commissioning requires a 7-day burn-in and successful demonstration of cutover and automatic failover functions. Payment is due upon final Government acceptance. Base Year maintenance runs 12 months from award, with mooring logs due the 7th business day of each month. OEM-recommended propylene glycol concentration is acceptable considering Grand Forks winter temperatures, and verification of monthly rotation may occur the next business day if network/remote connections are unavailable due to security controls.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch1_Quote_Schedule_V2_23NOV26.xlsx | XLSX spreadsheet | |
| Amendment 1 Combo FA465927QM001.pdf | ||
| Atch6 Past Performance List of References.pdf | ||
| Atch2 PWS CRAC Units for MCE 1211.pdf | ||
| Atch5 DBA WD.pdf | ||
| Combo FA465927QM001 CRAC Units.pdf | ||
| Atch4 SCA WD.pdf | ||
| Atch3 Provisions and Clauses.pdf | ||
| Atch1 Quote Schedule 29Oct26.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRAC 1.9 Questions & Answer Document
1. Manufacturer Preference: Does the Government have a preferred manufacturer for the replacement CRAC units, or will any manufacturer meeting the PWS specifications be acceptable?
No preference on manufacturer for the replacement CRAC units, however, the equipment must be TAA compliant.
2. Existing Equipment Information: Can the Government provide detailed information on the existing CRAC system, including manufacturer, model numbers, serial numbers, capacities, equipment configuration, and any available mechanical or electrical drawings?
Compu-Aire System 2200L
Model #: CAG-834 EM
Serial #: 8521SY1012-5929
460 v
3 Phase
60 Hz
2 Compressor
50LRA. EA.
Evap Blower Motor 1 5
H.P.6.6
Humidifier kW 6.8
Min Circuit Amp 32.9 Amps F.L.A. EA.
Max Rec Time Delay Fuse 40Amps
Refrigerant Factory Charge 8Lbs Per System
High Pressure Test 400psig
Low Pressure Test 125psig
Chilled Water Unit OP Pressure 125psig
CEN doesn’t have many drawings for the temporary building, but the attached as-builts from our pump replacement project included unit.
3. Cooling Capacity: The PWS specifies two 8-ton CRAC units. Can the Government confirm whether each unit must independently support the entire cooling load during a primary unit failure?
We aim to have each CRAC unit independently support the load with a lead-lag setup between the units so that they can coordinate their run times.
4. System Redundancy: The PWS requires automatic failover capabilities but also references movable flexible ductwork for connecting the backup unit. Should failover occur automatically without manual intervention, or is manual ductwork repositioning acceptable?
Automatic failover preferred.
5. Existing Infrastructure: Can the Government confirm whether the existing electrical infrastructure, piping connections, equipment foundations, and installation locations can accommodate the replacement equipment, or whether modifications are anticipated?
If the replacement equipment can utilize existing infrastructure there shouldn’t be any issues. If any modifications are needed, they will need to coordinate with the site Facility Manager.
6. Dry Coolers and Pumps: Can the Government clarify the intended arrangement and number of redundant pumps and dry coolers for each independent system? Additionally, does the free-cooling requirement at or below 35°F require full cooling capacity without mechanical refrigeration?
We generally have one dry cooler and two redundant pumps on each system. To match the systems in the B542 bays, this replacement would remove the existing
CRAC 1.9, its dry cooler, and both of its pumps and install two new CRAC units, two dry coolers, and four pumps.
Yes, free-cooling references not using compressors for mechanical refrigeration.
7. System Monitoring: Is integration with an existing building management system or Government network required? What methods of remote monitoring and data collection are authorized for temperature, humidity, and system rotation verification?
Other CRAC Units within the building use a Sensaphone for notification of overheating issues.
Commercial lines are currently not installed to the temp shelter. Cell service is not allowed within the restricted area.
8. Installation and Downtime: Will the Government permit scheduled downtime during the removal and installation process, or must cooling remain uninterrupted? If uninterrupted cooling is required, will temporary cooling equipment be necessary?
The site currently has portable units that can cool the equipment. No downtime is needed during the removal and installation process.
9. Preventive Maintenance Frequency: Can the Government confirm whether monthly on-site preventive maintenance visits are required or if the contractor may propose a maintenance schedule based on manufacturer recommendations while maintaining the required monthly reporting?
Maintenance schedule can be based on manufacturer recommendations.
10. Emergency Service Calls: Section 6.3.1 references up to three emergency repair services. Does this allowance apply annually, per option year, or over the entire contract period? How would additional emergency calls be handled and compensated?
There is an allowance of 3 Emergency Service Calls per year once installation of CRAC Unit is completed. Additional emergency calls will be funded separately.
11. Emergency Response Time: The PWS requires a two-hour on-site emergency response. Does this time begin upon arrival at the installation gate or upon reaching the actual equipment location? How will restricted-area access and escorts be coordinated during after-hours emergencies?
The two hour on-site emergency response is for the contractor to arrive on to the installation.
Coordination for escorts will be through the COR or facility manager.
12. Replacement Parts and Repairs: Can the Government clarify which corrective maintenance labor and replacement components are included in the firm-fixed-price maintenance requirements versus those that may be separately authorized and invoiced under the Replacement Parts
CLIN?
Any and all parts, material acquired under this requirement are included until the warranty and or the contractor liability runs out. Anything else is separate.
13. Commissioning and Acceptance: Are there specific commissioning tests, operational demonstrations, or minimum performance periods required before the Government formally accepts the installation?
Request a 7-day burn-in and a successful demonstration of the cutover and automatic failover functions.
14. Winter Installation: Are there any restrictions regarding installation during the winter months? Additionally, does the Government have an anticipated installation completion date following contract award?
Earliest feasible time.
15. Payment Schedule: Will the replacement equipment and installation be invoiced upon final acceptance, or will the Government permit progress or milestone payments for equipment procurement, delivery, and completed installation phases? Also, is there an anticipated timeframe for funding availability and award?
Upon final acceptance.
16. Labor Requirements: Since both construction and service wage determinations are referenced, can the Government clarify their applicability to the installation and ongoing maintenance portions?
Additionally, which limitations-on-subcontracting requirements will apply to this mixed-scope requirement?
Depends on the nature of the job an individual will be performing under the contract regarding both the labor rates, and the limitations on subcontracting.
17. Site Visit Representation: May a prospective offeror designate an authorized subcontractor representative to attend the November 5, 2026, site visit on its behalf? Additionally, will written measurements and sketches be permitted given the restrictions on electronic devices?
Measurements and sketches will be permitted. An authorized subcontractor representative can attend the 05 November site visit on behalf of the prospective offeror.
18. Failover and ductwork (PWS 2.2.2, 2.2.3): The PWS requires automatic failover and automatic monthly rotation, but also movable flexible ductwork to connect the backup unit during failover. Should both units be permanently connected to the MCE so that failover and rotation are fully automatic, or is manual duct reconnection expected? Please describe the current CRAC-to-MCE interface.
The current setup is the CRAC is connected to the MCE via detachable vents.
Manual duct reconnections are desired in the event of Unit failures.
19. Base Year duration (CLIN 0001 vs. Combined Synopsis/Solicitation):
CLIN 0001 includes maintenance "within a year of the award," while the solicitation states that maintenance starts after installation and acceptance and runs for one year. Which applies: 12 months from award or 12 months from Government acceptance?
12 months from award.
20. Number of emergency calls (PWS 6.3.1 vs. Quote Schedule): The PWS states "up to three (3)" emergency repair capabilities, while CLINs x003 list 4 each per option year and 2 for the extension. Which quantity should be priced? Is there a limit on emergency calls in the Base Year?
There is an allowance of 3 Emergency Service Calls per year once installation of CRAC Unit is completed. Additional emergency calls will be funded separately.
21. Replacement parts (PWS 2.4.1, CLIN 0001): Please confirm which parts are included in the firm-fixed Base Year price and which are purchased separately by the Government. In the option years, do CLINs x001 "including Service Calls and Repairs" include labor only, with parts billed under CLINs x002?
Any and all parts, material acquired under this requirement are included until the warranty and or the contractor liability runs out. In option years, it’s the same concept and yes, parts required to be purchased by the Government shall be negotiated with the Government.
22. Electrical, water and drain: Is existing electrical capacity sufficient for two 8-ton units, two dry coolers, and pumps? Please provide voltage/phase and available breaker capacity. Is a water supply and condensate/humidifier drain available at the unit location? Is electrical work within the contractor's scope?
We only have the power setup for 1 unit. Water supply and Condensate/humidifier are available for the existing single unit.
Current power setup is
1. CRAC 1.9 - 480/277V
2. Pump A - 480/277 V
3. Pump B – 480/277 V
23. Equipment location and drawings: Where should the new units and dry coolers be placed (existing pads, new pads, roof, ground)? Are any as-built drawings available? The drawing index in DFARS 252.236-7001 (Atch3) is blank.
Existing pads and on the ground. The locations of the existing dry cooler and CRAC unit.
24. Monitoring and rotation verification (PWS 2.2.1.3, 2.2.2.1, 6.5.2.1): Is a network or remote connection permitted for the CRAC controllers and temperature/RH data logging? If not, the 4th-Saturday rotation would require a weekend visit with escort. Would verification on the next business day be acceptable?
Verification on the next business day is acceptable. Network or remote connection not permitted due to security controls.
25. Log due date: PWS 2.2.1.3 and the Service Summary state the 7th business day; the Deliverables table states the 7th day. Please confirm which applies.
7th business day.
26. Glycol concentration (PWS 2.2.1.4): Given Grand Forks winter design temperatures, may offerors propose a different propylene glycol concentration if recommended by the OEM, or is 40% mandatory?
OEM recommendation will work, with consideration of the winter temperatures at Grand Forks.
27. Can we get photos of the CRAC unit, and dry cooler? Photos of the Unit and a photo of the manufacturer data plates.
Yes, see the attached document with pictures.
28. Can we get photos of the electrical disconnects and electrical panel?
Yes, see Q&A 27.
KEY PLAN - BUILDING 542
NTS
PROJECT AREA
D
JL
M C
H
TC
C O
VE
R
S H
EE
T
G-001
JF
SD
FI
LE
N
AM
E:
D
ES
IG
N
ED
B
Y:
D
C
A
B
SI
ZE
C O
N
TR
AC
T
N O
TU
SK
EG
EE
A
IR
M
EN
B
LV
D
JF
SD
SHEET ID
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D
AN
SI
D
C
ES
/C
EN
M
G R
AN
D
F O
R
KS
A
IR
F O
R C
E
BA
SE
N
O R
TH
D
AK
O
TA
, 5
-6
E
F
G
2 3 4 5 6 7 8 9 10
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
IS
SU
E D
AT
E:
A/ E
PR
O
JE
C
T N
O
G R
AN
D
F O
R
KS
A
FB
, N O
R
TH
D
AK
O
TA
FY
R
EP
AI
R (S
U S)
C R
AC
P
U M
PS
G
LO
BA
L H
AW
K
SQ
O
PS
BU
IL
D
IN
G
JF
SD
BL
AC
K R
ID
G
E
AP
R
IL
AR
C
H
IT
EC
TS
E N
G
IN
EE
R
S
D
EM
ER
S
AV
E G
R
AN
D F
O R
KS
, N
D
240010
SHEET ID. SHEET DESCRIPTION
GENERAL
G-001 COVER SHEET
MECHANICAL
M-001 MECHANICAL LEGEND
M-101 FIRST FLOOR MECHANICAL DEMOLITION PLAN
M-201 FIRST FLOOR MECHANICAL PLAN
M-501 CRAC UNIT CONTROL REPAIRS
M-502 CRAC UNIT CONTROL REPAIRS
M-801 MECHANICAL SCHEDULES
ELECTRICAL
E-001 ELECTRICAL LEGEND
E-002 ELECTRICAL SPECIFICATIONS
E-101 POWER DEMOLITION PLAN
E-201 FIRST FLOOR POWER PLAN
GFAFB
GRAND FORKS AIR FORCE BASE
GRAND FORKS NORTH DAKOTA
Project Number:
Issue Date:
HAWK SQ OPS BLDG. 542
319 CES/CENM
525 TUSKEGEE AIRMEN BLVD
GRAND FORKS AIR FORCE BASE
PN JFSD240010
SEPTEMBER 2024
REPAIR (SUS) CRAC PUMPS GLOBAL
NORTH DAKOTA 58205-6434
AREA MAP
AS-BUILTS
08/27/2025
AutoCAD SHX Text
%%UPROJECT LOCATION MAP
AutoCAD SHX Text
MAIN GATE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
SOUTH GATE
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
H ST.
AutoCAD SHX Text
TUSKEGEE AIRMEN BLVD.
AutoCAD SHX Text
EIELSON STREET
AutoCAD SHX Text
U.S. HIGHWAY 2
AutoCAD SHX Text
25TH ST NE
AutoCAD SHX Text
19TH AVE.
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
LRE
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
LRE
AutoCAD SHX Text
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
VENDING
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
MCE
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
MCE
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
EQUIP.
AutoCAD SHX Text
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
AutoCAD SHX Text
MEN LOCKER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
FITNESS
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN LOCKER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #2
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
READY
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
SUPER
AutoCAD SHX Text
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
SUPER
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
SEC.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #1
AutoCAD SHX Text
AutoCAD SHX Text
JAN.
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text 114A
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
XXXX
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text A
R-1
S-1
P
S-1
NO.
MECHANICAL LEGEND
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FD
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_TOTALFU_WASTEFU_HOTFU_COLDFIXT_CODE
FU_TOTALFU_WASTEFU_HOTFU_COLDFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
MA
OX
VAC
NO
W
N
V-EX
IA
C02
MA-IN
D
JL
M C
H
TC
M
EC
H
AN
IC
AL
L
EG
EN
D
M-001
JF
SD
FI
LE
N
AM
E:
D
ES
IG
N
ED
C
A
B
SI
ZE
C O
N
TR
AC
T
N O
TU
SK
EG
EE
A
IR
M
EN
B
LV
D
JF
SD
SHEET ID
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D
D
C
ES
/C
EN
M
G R
AN
D
F O
R
KS
A
IR
F O
R C
E
BA
SE
N
O R
TH
D
AK
O
TA
, 5
-6
E
F
G
2 3 4 5 6 7 8 9 10
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
E D
ES
C
R
IP
TI
O
N M
AR
K
IS
SU
E D
AT
E:
A/ E
PR
O
JE
C
T N
O
G R
AN
D
F O
R
KS
A
FB
, N O
R
TH
D
AK
O
TA
FY
R
EP
AI
R (S
U S)
C R
AC
P
U M
PS
G
LO
BA
L H
AW
K
SQ
O
PS
BU
IL
D
IN
G
JF
SD
BL
AC
K R
ID
G
E
AP
R
IL
AR
C
H
IT
EC
TS
E N
G
IN
EE
R
S
D
EM
ER
S
AV
E G
R
AN
D F
O R
KS
, N
D
240010AS-BUILTS
08/27/2025
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
CEILING GRILLE
AutoCAD SHX Text
CG
AutoCAD SHX Text
CONVECTOR
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CABINET HEATER
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
CONTINUATION
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
DRY BULB
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
COOLING TOWER
AutoCAD SHX Text
DIRECT EXPANSION
AutoCAD SHX Text
CEILING REGISTER
AutoCAD SHX Text
CONDENSATE PUMP OR CIRCULATING PUMP
AutoCAD SHX Text
COLD WATER & CONDENSER WATER
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
DX
AutoCAD SHX Text
DIA
AutoCAD SHX Text
DN
AutoCAD SHX Text
DB
AutoCAD SHX Text
DR
AutoCAD SHX Text
DWG
AutoCAD SHX Text
CW
AutoCAD SHX Text
CV
AutoCAD SHX Text
CT
AutoCAD SHX Text %%C
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CONV
AutoCAD SHX Text
CR
AutoCAD SHX Text
CUH
AutoCAD SHX Text
CP
AutoCAD SHX Text
CONT
AutoCAD SHX Text
CO
AutoCAD SHX Text
CLG
AutoCAD SHX Text
CWR
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
AIR COOLED CONDENSING UNIT
AutoCAD SHX Text
ACCESS DOOR OR AREA DRAIN
AutoCAD SHX Text
AIR HANDLING UNIT
AutoCAD SHX Text
AIR CONDITIONING UNIT
AutoCAD SHX Text
AQUEOUS FILM FORMING FOAM
AutoCAD SHX Text
COOLING COIL
AutoCAD SHX Text
CONVECTOR
AutoCAD SHX Text
BOTTOM OF PIPE
AutoCAD SHX Text
CUBIC FEET PER MINUTE
AutoCAD SHX Text
CEILING DIFFUSER OR CONDENSATE DRAIN
AutoCAD SHX Text
BRITISH THERMAL UNIT
AutoCAD SHX Text
BRAKE HORSEPOWER
AutoCAD SHX Text
BOTTOM OF THE BEAM
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
CEILING EXHAUST FAN
AutoCAD SHX Text
BACK DRAFT DAMPER
AutoCAD SHX Text
BTU
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CC
AutoCAD SHX Text
CD
AutoCAD SHX Text C
AutoCAD SHX Text
BOP
AutoCAD SHX Text
BV
AutoCAD SHX Text
BOB
AutoCAD SHX Text
CEF
AutoCAD SHX Text
AHU
AutoCAD SHX Text
ACCU
AutoCAD SHX Text
AFF
AutoCAD SHX Text
AD
AutoCAD SHX Text
AC
AutoCAD SHX Text
AFFF
AutoCAD SHX Text
BHP
AutoCAD SHX Text
BDD
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MAX
AutoCAD SHX Text
THOUSAND BTU PER HOUR
AutoCAD SHX Text
MOTOR CONTROL CENTER
AutoCAD SHX Text
NEW TO EXISTING CONNECTION
AutoCAD SHX Text
MOTOR OPERATED DAMPER
AutoCAD SHX Text
OPPOSED BLADE DAMPER
AutoCAD SHX Text
OUTSIDE DIMENSION
AutoCAD SHX Text
OVERFLOW STORM PIPING
AutoCAD SHX Text
OUTSIDE SCREW & YOKE GATE VALVE
AutoCAD SHX Text
OA
AutoCAD SHX Text
OBD
AutoCAD SHX Text
OST
AutoCAD SHX Text
OS&Y
AutoCAD SHX Text
OD
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NO
AutoCAD SHX Text
NFA
AutoCAD SHX Text
NIC
AutoCAD SHX Text
OUTSIDE AIR
AutoCAD SHX Text
NET FREE AREA
AutoCAD SHX Text
NORMALLY OPEN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
MUA
AutoCAD SHX Text N/E
AutoCAD SHX Text
MOD
AutoCAD SHX Text
NC
AutoCAD SHX Text
MS
AutoCAD SHX Text
MBH
AutoCAD SHX Text
MCC
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MH
AutoCAD SHX Text
NORMALLY CLOSED
AutoCAD SHX Text
MAKE UP AIR UNIT
AutoCAD SHX Text
MOP SINK
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
HEATING AND VENTILATING UNIT
AutoCAD SHX Text
LEAVING AIR TEMPERATURE
AutoCAD SHX Text
LEAVING WATER TEMPERATURE
AutoCAD SHX Text
MIXED AIR TEMPERATURE
AutoCAD SHX Text
LINEAR SLOT DIFFUSER (CEILING, WALL, SILL, & FLOOR)
AutoCAD SHX Text
MAT
AutoCAD SHX Text
LWT
AutoCAD SHX Text
LSD
AutoCAD SHX Text
LVR
AutoCAD SHX Text
LAT
AutoCAD SHX Text
LBS
AutoCAD SHX Text
LDR
AutoCAD SHX Text L
AutoCAD SHX Text
JP
AutoCAD SHX Text
LOUVER
AutoCAD SHX Text
POUNDS
AutoCAD SHX Text
LAVATORY
AutoCAD SHX Text
JOCKEY PUMP
AutoCAD SHX Text
LEADER
AutoCAD SHX Text
IN
AutoCAD SHX Text
JS
AutoCAD SHX Text
ID
AutoCAD SHX Text
HX
AutoCAD SHX Text
HWS & HWR
AutoCAD SHX Text
HVU
AutoCAD SHX Text
HP
AutoCAD SHX Text
HEAT EXCHANGER
AutoCAD SHX Text
INSIDE DIMENSION
AutoCAD SHX Text
JANITOR'S SINK
AutoCAD SHX Text
INCHES
AutoCAD SHX Text
HORSE POWER
AutoCAD SHX Text
HOT WATER SUPPLY AND RETURN
AutoCAD SHX Text
CHECK VALVE, FLOW DIRECTION
AutoCAD SHX Text
FLOOR CLEANOUT/GRADE CLEANOUT
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
MIXING VALVE
AutoCAD SHX Text
METER
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
GAS PRESSURE REGULATOR
AutoCAD SHX Text M
AutoCAD SHX Text
DIRT POCKET
AutoCAD SHX Text
FLOW MEASURING STATION
AutoCAD SHX Text
GAS COCK VALVE
AutoCAD SHX Text
ECCENTRIC REDUCER (E.R.)
AutoCAD SHX Text
CONCENTRIC REDUCER
AutoCAD SHX Text F
AutoCAD SHX Text
PC
AutoCAD SHX Text
ORL
AutoCAD SHX Text
LPS
AutoCAD SHX Text
LPR
AutoCAD SHX Text
MPS
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
AUTOMATIC 2-WAY CONTROL VALVE
AutoCAD SHX Text
ARROW INDICATES DIRECTION OF FLOW
AutoCAD SHX Text
CAPPED PIPE WITH SHUT-OFF VALVE
AutoCAD SHX Text
AUTOMATIC FLOW CONTROL VALVE
AutoCAD SHX Text
AUTOMATIC 3-WAY CONTROL VALVE
AutoCAD SHX Text
BACK FLOW PREVENTER-RPZ
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
BOTTOM PIPE CONNECTION
AutoCAD SHX Text
ANGLE RELIEF VALVE
AutoCAD SHX Text
AUTOMATIC AIR VENT
AutoCAD SHX Text A
AutoCAD SHX Text
CW
AutoCAD SHX Text
FOV
AutoCAD SHX Text
HPC
AutoCAD SHX Text G
AutoCAD SHX Text
HPR
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
CHWR
AutoCAD SHX Text
CWR
AutoCAD SHX Text
CHWS
AutoCAD SHX Text A
AutoCAD SHX Text
CD
AutoCAD SHX Text
SPACING
AutoCAD SHX Text
(MAXIMUM)
AutoCAD SHX Text
AutoCAD SHX Text 24(.020)
AutoCAD SHX Text A & B
AutoCAD SHX Text
UP THRU 18"
AutoCAD SHX Text
THERMOSTAT WITH ZONE OR
AutoCAD SHX Text
EQUIPMENT DESIGNATION
AutoCAD SHX Text
DUCT SMOKE DETECTOR SUPPLIED BY ELECTRICAL
AutoCAD SHX Text
TRADE, INSTALLED BY MECHANICAL TRADE.
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
HUMIDISTAT
AutoCAD SHX Text
FLOW SWITCH
AutoCAD SHX Text
19" THRU 24"
AutoCAD SHX Text
25" THRU 36"
AutoCAD SHX Text
37" THRU 54"
AutoCAD SHX Text
55" THRU 80"
AutoCAD SHX Text
81" THRU 96"
AutoCAD SHX Text
OVER 96"
AutoCAD SHX Text 22(.025)
AutoCAD SHX Text 22(.025)
AutoCAD SHX Text 20(.032)
AutoCAD SHX Text 18(.040)
AutoCAD SHX Text 16(.051)
AutoCAD SHX Text 16(.051)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
H OR J
AutoCAD SHX Text
E OR I
AutoCAD SHX Text
E OR I
AutoCAD SHX Text
F OR G
AutoCAD SHX Text
H OR J
AutoCAD SHX Text C
AutoCAD SHX Text
CEILING DIFFUSER
AutoCAD SHX Text
PARTITION OR WALL (SIZE)
AutoCAD SHX Text
DUCT MOUNTED HEATING COIL, WITH DUCT
AutoCAD SHX Text
ACCESS DOOR UPSTREAM OF HEATING COIL.
AutoCAD SHX Text
RETURN REGISTER OR GRILLE
AutoCAD SHX Text
TRANSFER GRILLES ON BOTH SIDES OF
AutoCAD SHX Text
SUPPLY REGISTER WITH AIR OUTLET
AutoCAD SHX Text
TERMINAL UNIT WITH HEATING COIL
AutoCAD SHX Text
SUPPLY DUCT UP
AutoCAD SHX Text
DEVICE DESIGNATION (100 CFM)
AutoCAD SHX Text
ROUND DUCT, UP
AutoCAD SHX Text
SUPPLY DUCT DOWN
AutoCAD SHX Text
RETURN DUCT UP
AutoCAD SHX Text
RETURN DUCT DOWN
AutoCAD SHX Text
RETURN OR EXHAUST REGISTER OR GRILLE
AutoCAD SHX Text
WITH AIR INLET DEVICE DESIGNATION (100 CFM)
AutoCAD SHX Text
ROUND DUCT, DOWN
AutoCAD SHX Text
RECTANGULAR
AutoCAD SHX Text
SHEET / CONSTRUCTION NOTE NUMBER
AutoCAD SHX Text
REVISION NUMBER
AutoCAD SHX Text
POINT OF CONNECTION (NEW TO EXISTING)
AutoCAD SHX Text
HATCH INDICATES ITEM(S) TO BE REMOVED
AutoCAD SHX Text
INTERNALLY LINED DUCTWORK
AutoCAD SHX Text
SECTION DESIGNATION
AutoCAD SHX Text
DETAIL DESIGNATION
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
SQUARE FEET
AutoCAD SHX Text
RECTANGULAR
AutoCAD SHX Text
RECTANGULAR
AutoCAD SHX Text
RECTANGULAR
AutoCAD SHX Text
FLOOR DRAIN, AREA DRAIN
AutoCAD SHX Text
WATER CLOSET
AutoCAD SHX Text
URINAL
AutoCAD SHX Text
SINK
AutoCAD SHX Text
ELECTRIC WATER COOLER
AutoCAD SHX Text
LAVATORY
AutoCAD SHX Text
MOP BASIN
AutoCAD SHX Text
SANITARY WASTE, UNDERGROUND
AutoCAD SHX Text
SANITARY WASTE, ABOVE GRADE
AutoCAD SHX Text
(AW - ACID WASTE UNDERGROUND)
AutoCAD SHX Text
(AW - ACID WASTE ABOVE GRADE)
AutoCAD SHX Text
DOMESTIC HOT WATER CIRCULATION
AutoCAD SHX Text
SYMBOLS
AutoCAD SHX Text
TRG 12X12
AutoCAD SHX Text
ACCESS
AutoCAD SHX Text
AREA
AutoCAD SHX Text
SLOT DIFFUSER
AutoCAD SHX Text H-1/8"
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
DIMENSION
AutoCAD SHX Text H
AutoCAD SHX Text
GAUGES
AutoCAD SHX Text
STEEL/ALUMINUM
AutoCAD SHX Text (J)
AutoCAD SHX Text (I)
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
JOINTS
AutoCAD SHX Text
ANGLE REINFORCED
AutoCAD SHX Text
STANDING SEAM
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text (H)
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text (G)
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text
STANDING SEAM
AutoCAD SHX Text
ANGLE SLIP
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text H
AutoCAD SHX Text (F)
AutoCAD SHX Text H
AutoCAD SHX Text (E)
AutoCAD SHX Text
REINFORCED
AutoCAD SHX Text
BAR SLIP (CLEAT)
AutoCAD SHX Text
ALTERNATE BAR SLIP
AutoCAD SHX Text
(STANDARD "S" SLIP)
AutoCAD SHX Text (C)
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text H
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text (B)
AutoCAD SHX Text
BAR SLIP
AutoCAD SHX Text
PLAIN "S" SLIP
AutoCAD SHX Text
HEMMED "S" SLIP
AutoCAD SHX Text 8'-0"
AutoCAD SHX Text 1 1/2"X1/8"L
AutoCAD SHX Text 1 1/2"X1/8"L
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text 2"X1/4"L
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text 2'-6"
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text 1 1/8"
AutoCAD SHX Text 1"
AutoCAD SHX Text
H" DIMENSION
AutoCAD SHX Text
JOINT
AutoCAD SHX Text
(MINIMUM)
AutoCAD SHX Text
BACK FLOW PREVENTER ASSEMBLY
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
ALARM CHECK VALVE W/ ALL RELATED APPURTENANCES
AutoCAD SHX Text
FIRE DEPT. HOSE VALVE W/ CAP & CHAIN
AutoCAD SHX Text
SPRINKLER INSPECTOR TEST STATION
AutoCAD SHX Text
EXTENDED COVERAGE SIDEWALL SPRINKLER HEAD
AutoCAD SHX Text
REDUCED PRESSURE BACK FLOW PREVENTER ASSEMBLY
AutoCAD SHX Text
PRE-ACTION VALVE W/ ALL RELATED APPURTENANCES
AutoCAD SHX Text
SPRINKLER FLOOR CONTROL VALVE ASSEMBLY
AutoCAD SHX Text
FIRE DEPARTMENT CONNECTION WALL MOUNTED
AutoCAD SHX Text
H= HEIGHT REFERRED TO IN DIMENSIONS
AutoCAD SHX Text
DRY PIPE VALVE W/ ALL RELATED APPURTENANCES
AutoCAD SHX Text
DUCT CONSTRUCTION STANDARDS
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
SLOPING RISE (R) OR DROP (D) IN DUCTWORK
AutoCAD SHX Text
DUCT SIZE (CLEAR INSIDE DIMENSION)
AutoCAD SHX Text
FIRST FIGURE INDICATES PLAN SIZE
AutoCAD SHX Text
DUCT ACCESS DOOR
AutoCAD SHX Text
(BDD) BACK DRAFT DAMPER
AutoCAD SHX Text
ROUND DUCT DIAMETER SIZE
AutoCAD SHX Text
VOLUME DAMPER IN DUCT (VD)
AutoCAD SHX Text
FLEXIBLE CONNECTION IN DUCT
AutoCAD SHX Text
ELBOW WITH TURNING VANES
AutoCAD SHX Text
DUCT SPLIT WITH SPLIT SIZE
AutoCAD SHX Text
(FD) FIRE DAMPER, (SD) SMOKE DAMPER,
AutoCAD SHX Text
(F/S) COMBINATION FIRE SMOKE DAMPER,
AutoCAD SHX Text
BRANCH TAKEOFF WITH VOLUME DAMPER
AutoCAD SHX Text
RAIN LEADER PIPING (BELOW GRADE)
AutoCAD SHX Text
PUMPED CONDENSATE RETURN
AutoCAD SHX Text
STORM DRAIN PIPING (ABOVE GRADE)
AutoCAD SHX Text
VENT PIPING (AV-ACID VENT)
AutoCAD SHX Text
DOMESTIC COLD WATER
AutoCAD SHX Text
DOMESTIC HOT WATER
AutoCAD SHX Text
MEDIUM PRESSURE STEAM
AutoCAD SHX Text
HIGH PRESSURE STEAM SUPPLY
AutoCAD SHX Text
LOW PRESSURE STEAM SUPPLY
AutoCAD SHX Text
LOW PRESSURE STEAM RETURN
AutoCAD SHX Text
HEATING WATER SUPPLY
AutoCAD SHX Text
HEATING WATER RETURN
AutoCAD SHX Text 18X12
AutoCAD SHX Text
RADIUS ELBOW
AutoCAD SHX Text
CONDENSER WATER SUPPLY
AutoCAD SHX Text
HIGH PRESSURE CONDENSATE RETURN
AutoCAD SHX Text
FUEL OIL SUPPLY PIPING
AutoCAD SHX Text
FUEL OIL RETURN PIPING
AutoCAD SHX Text
FUEL OIL VENT PIPING
AutoCAD SHX Text
HIGH PRESSURE STEAM RETURN
AutoCAD SHX Text
NATURAL GAS PIPING
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
CONDENSATE DRAIN OR RETURN
AutoCAD SHX Text
CONDENSER WATER RETURN
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
COMPRESSED AIR LINE
AutoCAD SHX Text
FLEXIBLE DUCT
AutoCAD SHX Text 18%%C
AutoCAD SHX Text 18X12
AutoCAD SHX Text R
AutoCAD SHX Text (A)
AutoCAD SHX Text
DRIVE SLIP
AutoCAD SHX Text
ROOF MANIFOLD
AutoCAD SHX Text
SIDEWALL SPRINKLER HEAD
AutoCAD SHX Text
RPBP
AutoCAD SHX Text
PAV
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
FIRE HOSE VALVE
AutoCAD SHX Text
FIRE HOSE VALVE CABINET
AutoCAD SHX Text
PENDANT SPRINKLER HEAD
AutoCAD SHX Text
DOUBLE CHECK VALVE
AutoCAD SHX Text
UPRIGHT SPRINKLER HEAD
AutoCAD SHX Text
DPV
AutoCAD SHX Text
DCVA
AutoCAD SHX Text
BPA
AutoCAD SHX Text
ACV
AutoCAD SHX Text
TC-1
AutoCAD SHX Text
TERMINAL COIL - (COIL NUMBER)
AutoCAD SHX Text
IJS
AutoCAD SHX Text
IN JOIST SPACE
AutoCAD SHX Text
GHWS
AutoCAD SHX Text
GLYCOL HOT WATER SUPPLY
AutoCAD SHX Text
GHWR
AutoCAD SHX Text
GLYCOL HOT WATER RETURN
AutoCAD SHX Text
GLYCOL CHILLED WATER SUPPLY
AutoCAD SHX Text
GCWS
AutoCAD SHX Text
GLYCOL CHILLED WATER RETURN
AutoCAD SHX Text
GCWR
AutoCAD SHX Text F/S
AutoCAD SHX Text
FD
AutoCAD SHX Text
SD
AutoCAD SHX Text
RD
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
WALL CLEANOUT
AutoCAD SHX Text
QUANTITY IN ROOM
AutoCAD SHX Text
S-SUPPLY, R-RETURN, E-EXHAUST, T-TRANSFER
AutoCAD SHX Text
CFM
AutoCAD SHX Text
RL
AutoCAD SHX Text
ZONE VALVE
AutoCAD SHX Text
MEDICAL GAS OUTLET (TYPICAL)
AutoCAD SHX Text A
AutoCAD SHX Text
GLYCOL
AutoCAD SHX Text
HEATING COIL
AutoCAD SHX Text
GALLONS
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
GALLONS PER MINUTE
AutoCAD SHX Text
HC
AutoCAD SHX Text
GLY
AutoCAD SHX Text
HB
AutoCAD SHX Text
GPM
AutoCAD SHX Text
GV
AutoCAD SHX Text
GAL
AutoCAD SHX Text
%%DF
AutoCAD SHX Text
DEGREES FAHRENHEIT
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FIXTURE UNIT
AutoCAD SHX Text
FEET
AutoCAD SHX Text
FURNISHED BY OTHERS
AutoCAD SHX Text
FULL LOAD AMPERES
AutoCAD SHX Text
COMBINATION FIRE AND SMOKE DAMPER
AutoCAD SHX Text
FIN TUBE RADIATION
AutoCAD SHX Text
FLEXIBLE CONNECTION
AutoCAD SHX Text
FIRE CONTROL CENTER
AutoCAD SHX Text
LOW PRESSURE NATURAL GAS
AutoCAD SHX Text
FLOW SWITCH OR FLOOR SINK
AutoCAD SHX Text
FUEL OIL PUMP OR FIRE PUMP
AutoCAD SHX Text
FUEL OIL VENT PIPING
AutoCAD SHX Text
FUEL OIL SUPPLY PIPING
AutoCAD SHX Text
FUEL OIL RETURN PIPING
AutoCAD SHX Text
FIRE DEPARTMENT CONNECTION
AutoCAD SHX Text
FIRE HOSE CABINET
AutoCAD SHX Text
FLOOR DRAIN OR FIRE DAMPER
AutoCAD SHX Text
FSD
AutoCAD SHX Text
FS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
FP
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FTR
AutoCAD SHX Text G
AutoCAD SHX Text
FU
AutoCAD SHX Text
FT
AutoCAD SHX Text
FBO
AutoCAD SHX Text
FC
AutoCAD SHX Text
FCC
AutoCAD SHX Text
FD
AutoCAD SHX Text
FLR
AutoCAD SHX Text
FLA
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FHC
AutoCAD SHX Text
FDC
AutoCAD SHX Text
EXHAUST AIR
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
EFFICIENCY
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
EXHAUST GRILLE
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
EXPANSION TANK
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
ELECTRIC HEATING COIL
AutoCAD SHX Text
ENTERING WATER TEMPERATURE
AutoCAD SHX Text
ENTERING DRY BULB
AutoCAD SHX Text
ELECTRIC UNIT HEATER
AutoCAD SHX Text
ENTERING WET BULB
AutoCAD SHX Text
ELECTRIC CABINET HEATER
AutoCAD SHX Text
ENTERING AIR TEMPERATURE
AutoCAD SHX Text
EXHAUST RESISTER
AutoCAD SHX Text
ELECTRIC WATER HEATER
AutoCAD SHX Text
ELECTRIC WATER COOLER
AutoCAD SHX Text
EHC
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
EL
AutoCAD SHX Text
EWB
AutoCAD SHX Text
EUH
AutoCAD SHX Text
EWT
AutoCAD SHX Text
ET
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
ER
AutoCAD SHX Text
EA
AutoCAD SHX Text
EAT
AutoCAD SHX Text
EFF
AutoCAD SHX Text
EF
AutoCAD SHX Text
EDB
AutoCAD SHX Text
ECH
AutoCAD SHX Text
EG
AutoCAD SHX Text
EWH
AutoCAD SHX Text
EWC
AutoCAD SHX Text
WALL OPENING (SIZE)
AutoCAD SHX Text
WO 12X12
AutoCAD SHX Text
WC
AutoCAD SHX Text
WH
AutoCAD SHX Text
WB
AutoCAD SHX Text W
AutoCAD SHX Text
WET BULB
AutoCAD SHX Text
WALL HYDRANT
AutoCAD SHX Text
WATER CLOSET
AutoCAD SHX Text
WASTE
AutoCAD SHX Text
HOSE END BLOW OFF VALVE
AutoCAD SHX Text
"Y" TYPE STRAINER WITH
AutoCAD SHX Text
SD
AutoCAD SHX Text
SMOKE DAMPER OR SMOKE DETECTOR
AutoCAD SHX Text
SUPPLY FAN OR SQUARE FEET
AutoCAD SHX Text
VARIABLE FREQUENCY DRIVE
AutoCAD SHX Text
VENT THROUGH ROOF
AutoCAD SHX Text
VARIABLE AIR VOLUME TERMINAL UNIT
AutoCAD SHX Text
STATIC PRESSURE OR SUMP PUMP
AutoCAD SHX Text
STORM PIPING OR SOUND TRAP (SOUND ATTENUATOR)
AutoCAD SHX Text
VAR
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VTR
AutoCAD SHX Text
VAV
AutoCAD SHX Text
VD
AutoCAD SHX Text
VTR
AutoCAD SHX Text
UR
AutoCAD SHX Text
UH
AutoCAD SHX Text
TYP
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VOLUME DAMPER
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
VENT THRU ROOF
AutoCAD SHX Text
UNIT HEATER
AutoCAD SHX Text
URINAL
AutoCAD SHX Text
SPKR
AutoCAD SHX Text
ST
AutoCAD SHX Text
TS
AutoCAD SHX Text
TOP
AutoCAD SHX Text
SS
AutoCAD SHX Text
SENS
AutoCAD SHX Text
SP
AutoCAD SHX Text
SF
AutoCAD SHX Text
SE
AutoCAD SHX Text
SPRINKLER
AutoCAD SHX Text
TOP OF PIPE
AutoCAD SHX Text
SERVICE SINK
AutoCAD SHX Text
TAMPER SWITCH
AutoCAD SHX Text
SENSIBLE
AutoCAD SHX Text
SEWAGE EJECTOR
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
POST INDICATING VALVE
AutoCAD SHX Text
PRESSURE DROP OR PUMP DISCHARGE
AutoCAD SHX Text
PRESSURE REDUCING VALVE OR POWER ROOF VENT
AutoCAD SHX Text
PLATE AND FRAME HEAT EXCHANGER
AutoCAD SHX Text
POUNDS PER SQUARE INCH (GAUGE)
AutoCAD SHX Text
REVOLUTIONS PER MINUTE
AutoCAD SHX Text
PSIG
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SA
AutoCAD SHX Text
RTU
AutoCAD SHX Text S
AutoCAD SHX Text
RPM
AutoCAD SHX Text
RD
AutoCAD SHX Text
RAF
AutoCAD SHX Text
RA
AutoCAD SHX Text
ROOF TOP UNIT
AutoCAD SHX Text
SANITARY
AutoCAD SHX Text
SUPPLY AIR
AutoCAD SHX Text
SINK
AutoCAD SHX Text
RETURN AIR
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
RETURN AIR FAN
AutoCAD SHX Text
PG
AutoCAD SHX Text
PHC
AutoCAD SHX Text
PSI
AutoCAD SHX Text
PRV
AutoCAD SHX Text
PIV
AutoCAD SHX Text
PFHX
AutoCAD SHX Text
P/FT
AutoCAD SHX Text
PD
AutoCAD SHX Text P
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
PREHEAT COIL
AutoCAD SHX Text
PITCH PER FOOT
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
SLEEVE
AutoCAD SHX Text
TEMPERATURE-PRESSURE TEST FITTING
AutoCAD SHX Text
VALVE WITH TAMPER SWITCH
AutoCAD SHX Text
THERMOMETER WELL
AutoCAD SHX Text
UNION
AutoCAD SHX Text
VACUUM BREAKER
AutoCAD SHX Text
TOP PIPE CONNECTION
AutoCAD SHX Text
"Y" TYPE STRAINER
AutoCAD SHX Text
WATER FLOW SWITCH
AutoCAD SHX Text
STEAM TRAP
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
TEMPERATURE SENSOR
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text M2.1
AutoCAD SHX Text M3.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OS&Y (OUTSIDE SCREW & YOKE) VALVE
AutoCAD SHX Text
PIPING FLEXIBLE CONNECTION
AutoCAD SHX Text
PRESSURE REDUCING VALVE (PRV)
AutoCAD SHX Text
PRESSURE GAUGE AND GAUGE COCK
AutoCAD SHX Text
PITCH PIPE DOWN IN DIRECTION OF FLOW
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
SHOCK ABSORBER
AutoCAD SHX Text
PIPE GUIDE
AutoCAD SHX Text
PIPE ANCHOR
AutoCAD SHX Text
PIPE DOWN
AutoCAD SHX Text
PIPE UP
AutoCAD SHX Text
PIPE EXPANSION JOINT
AutoCAD SHX Text
WC
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text
MB
AutoCAD SHX Text
EWC
AutoCAD SHX Text
HOT WATER
AutoCAD SHX Text
HW
AutoCAD SHX Text
RHW
AutoCAD SHX Text
RECIRCULATING HOT WATER
AutoCAD SHX Text
CARBON DIOXIDE
AutoCAD SHX Text
OXYGEN
AutoCAD SHX Text
NITROUS OXIDE
AutoCAD SHX Text
MEDICAL AIR
AutoCAD SHX Text
NITROGEN
AutoCAD SHX Text
MEDICAL VACUUM
AutoCAD SHX Text
WASTE ANETHESIA GAS DISPOSAL
AutoCAD SHX Text
INSTRUMENT AIR
AutoCAD SHX Text
MEDICAL GAS
AutoCAD SHX Text
MEDICAL AIR
AutoCAD SHX Text
OXYGEN
AutoCAD SHX Text
MEDICAL VACUUM
AutoCAD SHX Text
NITROUS OXIDE
AutoCAD SHX Text
WASTE ANESTHESIA GAS
AutoCAD SHX Text
NITROGEN
AutoCAD SHX Text
VACUUM EXHAUST
AutoCAD SHX Text
INSTRUMENT AIR
AutoCAD SHX Text
CARBON DIOXIDE
AutoCAD SHX Text
MEDICAL AIR INTAKE
AutoCAD SHX Text
EXHAUST DUCT UP
AutoCAD SHX Text
EXHAUST DUCT DOWN
AutoCAD SHX Text
RECTANGULAR
AutoCAD SHX Text
RECTANGULAR
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
M-101
FIRST FLOOR MECHANICAL DEMOLITION PLAN
3/32" = 1'-0" N
M-101
TYPICAL CONDENSER WATER PUMP DETAIL - DEMO
NO SCALE
GENERAL NOTES:
1. DRAIN EXISTING GLYCOL FLUID AND DISPOSE OF PROPERLY. CLEAN AND FLUSH EXISTING
HYDRONIC PIPING FOR EACH CRAC SYSTEM. PREPARE FOR NEW 40% PROPYLENE GLYCOL FLUID
REFILL.
2. COORDINATE PUMP POWER DISCONNECT/RECONNECT WITH DIV. 26 CONTRACTOR.
REFERENCE NOTES:
REMOVE EXISTING PUMP AND ASSOCIATED PIPING, REFER TO DETAIL. PREPARE FOR NEW PUMPS
AND CONNECTIONS AS REQUIRED.
REMOVE EXISTING GLYCOL FLUID FROM EX. GLYCOL MAKE UP WATER SYSTEM. PREPARE TO REFILL
TO HALF FULL.
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
D
JL
M C
H
TC
FI
R
ST
F
LO
O
R M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O N
PL
AN
M-101
JF
SD
FI
LE
N
AM
E:
D
ES
IG
N
ED
C
A
B
SI
ZE
C O
N
TR
AC
T
N O
TU
SK
EG
EE
A
IR
M
EN
B
LV
D
JF
SD
SHEET ID
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D
D
C
ES
/C
EN
M
G R
AN
D
F O
R
KS
A
IR
F O
R C
E
BA
SE
N
O R
TH
D
AK
O
TA
, 5
-6
E
F
G
2 3 4 5 6 7 8 9 10
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
E D
ES
C
R
IP
TI
O
N M
AR
K
IS
SU
E D
AT
E:
A/ E
PR
O
JE
C
T N
O
G R
AN
D
F O
R
KS
A
FB
, N O
R
TH
D
AK
O
TA
FY
R
EP
AI
R (S
U S)
C R
AC
P
U M
PS
G
LO
BA
L H
AW
K
SQ
O
PS
BU
IL
D
IN
G
JF
SD
BL
AC
K R
ID
G
E
AP
R
IL
AR
C
H
IT
EC
TS
E N
G
IN
EE
R
S
D
EM
ER
S
AV
E G
R
AN
D F
O R
KS
, N
D
240010AS-BUILTS
08/27/2025
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text 1.7
AutoCAD SHX Text I.2
AutoCAD SHX Text B.2
AutoCAD SHX Text B.1
AutoCAD SHX Text A.5
AutoCAD SHX Text 1.5
AutoCAD SHX Text 2.5
AutoCAD SHX Text 1.9
AutoCAD SHX Text 2.3
AutoCAD SHX Text D.1
AutoCAD SHX Text F.1
AutoCAD SHX Text I.5
AutoCAD SHX Text I.1
AutoCAD SHX Text 1.A
AutoCAD SHX Text 1.B
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
LRE
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
LRE
AutoCAD SHX Text
AutoCAD SHX Text
OUTSIDE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
VENDING
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
MOCK-UP/DECON
AutoCAD SHX Text
SURVIVAL TRAINING
AutoCAD SHX Text
AutoCAD SHX Text
HELMET MAINT.
AutoCAD SHX Text
OXYGEN MASK REPAIR
AutoCAD SHX Text
AutoCAD SHX Text
SCIF
AutoCAD SHX Text
AutoCAD SHX Text
FLIGHT LINE
AutoCAD SHX Text
INSPECTION
AutoCAD SHX Text 115A
AutoCAD SHX Text
EXPLOSIVES/
AutoCAD SHX Text
FLARE STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
MCE
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
MCE
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
TRAINING
AutoCAD SHX Text
AutoCAD SHX Text
MOCK-UP DECON
AutoCAD SHX Text
SURVIVAL TRAINING
AutoCAD SHX Text
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
NIGHT VISION GOGGLE
AutoCAD SHX Text
TEST CENTER
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
EQUIP.
AutoCAD SHX Text
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
AutoCAD SHX Text
MEN LOCKER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
FITNESS
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN LOCKER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #2
AutoCAD SHX Text
AutoCAD SHX Text
JAN.
AutoCAD SHX Text
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
READY
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
SUPER
AutoCAD SHX Text
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
SUPER
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
SEC.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE-X
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text #1
AutoCAD SHX Text
AutoCAD SHX Text
JAN.
AutoCAD SHX Text
AutoCAD SHX Text F.D.
AutoCAD SHX Text E.W.
AutoCAD SHX Text F.D.
AutoCAD SHX Text E.W.
AutoCAD SHX Text F.D.
AutoCAD SHX Text E.W.
AutoCAD SHX Text F.D.
AutoCAD SHX Text R.
AutoCAD SHX Text R.
AutoCAD SHX Text R.
AutoCAD SHX Text R.
AutoCAD SHX Text
ROLLING STORAGE
AutoCAD SHX Text
ROLLING STORAGE
AutoCAD SHX Text
ROLLING STORAGE
AutoCAD SHX Text
CORR.
AutoCAD SHX Text 114A
AutoCAD SHX Text M.B.
AutoCAD SHX Text
UPS
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 117B
AutoCAD SHX Text
SCIF
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
AutoCAD SHX Text
TECH
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text 115A
AutoCAD SHX Text
MISSION
AutoCAD SHX Text
TRAINING
AutoCAD SHX Text
AutoCAD SHX Text
TACTICS
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text 136A
AutoCAD SHX Text
MISSION
AutoCAD SHX Text
PLANNING
AutoCAD SHX Text
AutoCAD SHX Text
MISSION BRIEFING
AutoCAD SHX Text 117A
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 118A
AutoCAD SHX Text
FILES
AutoCAD SHX Text
FILES
AutoCAD SHX Text
FILES
AutoCAD SHX Text
FILES
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
GHOC
AutoCAD SHX Text
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.5
AutoCAD SHX Text
DC
AutoCAD SHX Text 2.2
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.3
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.4
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.3
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.1
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.4
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.2
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.1
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.6
AutoCAD SHX Text
DC
AutoCAD SHX Text 2.1
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.9
AutoCAD SHX Text T
AutoCAD SHX Text
%%UFT-3
AutoCAD SHX Text T
AutoCAD SHX Text
%%URCP-8
AutoCAD SHX Text
%%UVAV-4
AutoCAD SHX Text 14/12
AutoCAD SHX Text T
AutoCAD SHX Text
%%UVAV-20
AutoCAD SHX Text
%%URCP-7
AutoCAD SHX Text
%%URCP-6
AutoCAD SHX Text T
AutoCAD SHX Text 14/12
AutoCAD SHX Text T
AutoCAD SHX Text
%%UVAV-14
AutoCAD SHX Text
%%UVAV-13
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text 108/24
AutoCAD SHX Text
%%URCP-12
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
%%UVAV-16
AutoCAD SHX Text T
AutoCAD SHX Text
20/12 EA
AutoCAD SHX Text
%%UFT-2
AutoCAD SHX Text
CUH
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
%%UCONV-1
AutoCAD SHX Text T
AutoCAD SHX Text
%%URCP-5
AutoCAD SHX Text
%%URCP-4
AutoCAD SHX Text
%%URCP-3
AutoCAD SHX Text
%%URCP-2
AutoCAD SHX Text
%%URCP-16
AutoCAD SHX Text
%%URCP-15
AutoCAD SHX Text
%%URCP-11
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1 1/4 "
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1 1/4 "
AutoCAD SHX Text 1 1/2 "
AutoCAD SHX Text 2"
AutoCAD SHX Text 1 1/2 "
AutoCAD SHX Text
HWR
AutoCAD SHX Text 2"
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text 3/4 "
AutoCAD SHX Text 3/4 "
AutoCAD SHX Text 2"
AutoCAD SHX Text
HWS
AutoCAD SHX Text 2"
AutoCAD SHX Text
3/4" CONDENSATE DRAIN
AutoCAD SHX Text
AC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
DH
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
PUH
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text 3"
AutoCAD SHX Text
6"%%CCWS
AutoCAD SHX Text 6"%%cCWR
AutoCAD SHX Text 6"%%cCWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
AS
AutoCAD SHX Text T
AutoCAD SHX Text 3"
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text 1 1/2 "
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
%%UVAV-101-5
AutoCAD SHX Text
2.75 GPM
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
%%UVAV-102-3
AutoCAD SHX Text
1.50 GPM
AutoCAD SHX Text
%%UVAV-103-5
AutoCAD SHX Text
3.25 GPM
AutoCAD SHX Text
%%UVAV-112-5
AutoCAD SHX Text
2.75 GPM
AutoCAD SHX Text
%%UVAV-111-3
AutoCAD SHX Text
1.25 GPM
AutoCAD SHX Text
%%UVAV-105-4
AutoCAD SHX Text
2.00 GPM
AutoCAD SHX Text
%%UVAV-109-1
AutoCAD SHX Text
0.75 GPM
AutoCAD SHX Text
%%UVAV-110-3
AutoCAD SHX Text
1.25 GPM
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.2
AutoCAD SHX Text P
AutoCAD SHX Text 1.1B
AutoCAD SHX Text P
AutoCAD SHX Text 1.1A
AutoCAD SHX Text P
AutoCAD SHX Text 1.2A
AutoCAD SHX Text P
AutoCAD SHX Text 1.2B
AutoCAD SHX Text P
AutoCAD SHX Text 1.4A
AutoCAD SHX Text P
AutoCAD SHX Text 1.4B
AutoCAD SHX Text P
AutoCAD SHX Text 1.3A
AutoCAD SHX Text P
AutoCAD SHX Text 1.3B
AutoCAD SHX Text P
AutoCAD SHX Text 1.9A
AutoCAD SHX Text P
AutoCAD SHX Text 1.9B
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.7
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.8
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.7
AutoCAD SHX Text
DC
AutoCAD SHX Text 1.8
AutoCAD SHX Text P
AutoCAD SHX Text 1.7B
AutoCAD SHX Text P
AutoCAD SHX Text 1.7A
AutoCAD SHX Text P
AutoCAD SHX Text 1.8B
AutoCAD SHX Text P
AutoCAD SHX Text 1.8A
AutoCAD SHX Text
%%UVAV-106-4
AutoCAD SHX Text
2.00 GPM
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 2.1
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 2.2
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.6
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.5
AutoCAD SHX Text P
AutoCAD SHX Text 1.5A
AutoCAD SHX Text P
AutoCAD SHX Text 1.5B
AutoCAD SHX Text P
AutoCAD SHX Text 1.6A
AutoCAD SHX Text P
AutoCAD SHX Text 1.6B
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGR
AutoCAD SHX Text P
AutoCAD SHX Text 2.1A
AutoCAD SHX Text P
AutoCAD SHX Text 2.1B
AutoCAD SHX Text
%%UVAV-108-2
AutoCAD SHX Text
0.75 GPM
AutoCAD SHX Text
%%UVAV-104-4
AutoCAD SHX Text
2.25 GPM
AutoCAD SHX Text
EXPANSION TANK (TYP)
AutoCAD SHX Text
4" HOUSE KEEPING PAD (TYP)
AutoCAD SHX Text
AIR SEPERATOR (TYP)
AutoCAD SHX Text
CHEMICAL FEEDER (TYP)
AutoCAD SHX Text
GLYCOL FEED PUMP (TYP)
AutoCAD SHX Text
CIRCULATING PUMP (TYP)
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 1.9
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text
%%UFD
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text
%%UVAV-107-4
AutoCAD SHX Text
2.00 GPM
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 1"
AutoCAD SHX Text 1 1/2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text P
AutoCAD SHX Text 2.2A
AutoCAD SHX Text P
AutoCAD SHX Text 2.2B
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
EGR
AutoCAD SHX Text
EGS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1 1/2"
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1 1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1 1/2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1 1/4"
AutoCAD SHX Text 1"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
%%URHC
AutoCAD SHX Text 1"
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text 3/4"
AutoCAD SHX Text T
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text 1"
AutoCAD SHX Text
(TYP)
AutoCAD SHX Text
CWR(E)
AutoCAD SHX Text
CWR(E)
AutoCAD SHX Text
P-X.XA
AutoCAD SHX Text
P-X.XB
AutoCAD SHX Text
EXISTING CONDENSER WATER RETURN PIPING; SCH. 40, GROOVED END.
AutoCAD SHX Text
EXISTING CONDENSER WATER RETURN PIPING; SCH. 40, GROOVED END.
AutoCAD SHX Text
BALL VALVE. TYPICAL.
AutoCAD SHX Text
CHECK VALVE. TYPICAL.
AutoCAD SHX Text
UNION. TYPICAL.
AutoCAD SHX Text
CONDENSER WATER PUMP.
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
BALANCE VALVE, STRAINER
AutoCAD SHX Text
TEMP LRE BUILDING
AutoCAD SHX Text REMOVE EXISTING PUMP AND ASSOCIATED PIPING AS REQUIRED. COORDINATE WITH NEW PUMP SIZES, TYPICAL.
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
M-201
FIRST FLOOR MECHANICAL PLAN
3/32" = 1'-0" N
M-101
TYPICAL CONDENSER WATER PUMP DETAIL - DEMO
NO SCALE
GENERAL NOTES:
1. FILL HYDRONIC SYSTEM FOR EACH CRAC SYSTEM WITH NEW 40% PROPYLENE GLYCOL
FLUID. BLEED AIR AND PLACE SYSTEM BACK INTO OPERATION.
2. COORDINATE POWER RECONNECTION FOR EACH PUMP AS REQUIRED.
REFERENCE NOTES:
PROVIDE PUMP AND ASSOCIATED PIPING, REFER TO DETAIL.
FILL EXISTING GLYCOL MAKE UP SYSTEM HALF FULL WITH 40% PROPYLENE GLYCOL.
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
D
JL
M C
H
TC
FI
R
ST
F
LO
O
R M
EC
H
AN
IC
AL
P
LA
N
M-201
JF
SD
FI
LE
N
AM
E:
D
ES
IG
N
ED
C
A
B
SI
ZE
C O
N
TR
AC
T
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .